Quality Observations at Site:

1) South side Geo Engineering Shotcreting works end portion not good they are
not filled shotcreting some are the areas. That area we need again
scaffolding works for the rectification.

2) Core wall areas Outside PVC PERFORTED PIPE not completed backfilling done
again doing for cutting works for pipe laying that area soil in filled at water
proofing membrane top.