Power Energisation Report 2.PMS200.F011.

01
I CS VS ERM

Client: ARCI SITE: ARCI, HYDERABAD Contract Ref : PL20120163

Equipment Name : Date of Energisation :

Equipment No : Permit No :

Location : Time of Energisation :

Sr.
Description Remarks
No
1 Observation of any crack or Damage

2 Check the tightness of power cable termination


3 Tightness of Control Wiring
4 Check The Control Fuses
5 Check the freeness of MCB unit
6 Check Indication Lamps
7 ON/OFF operation working of MCCB

8 Check the tightness of CT Wiring


9 Check Ammeter and Voltmeter
10 Space Heater

11 Overall condition

Incoming Cable Insulation Measurement in M ohms


RE: YE: BE:
12
RN: YN: BN:
RY: YB: BR:
13 Check the double Earthling Of Panel

Submitted by: Checked BY


I CS VS ERM ARCI
Power Energisation Report 2.PMS200.F011.01
I CS VS ERM

Client: ARCI SITE: ARCI, HYDERABAD Contract Ref : PL20120163

Other Activities/Remarks:

Submitted by: Checked BY


I CS VS ERM ARCI