Purpose
To describe and control the process of backfilling work with quarry muck for the excavated canal
which was having the bottom of very lower level.
Scope
The procedure applying to quarry muck for the back filling because of the soil unavailability.
Top most 300mm layer shall be placed by using the soil and do the proper compaction.
Responsibility
The project engineer has overall responsibility for the implementation of this project procedure
1'-0" (300mm)-
Earth Filling
1500.0
VARIES
NEW PROPOSAL
Page 1 of 3
Back Filling Execution
Hazard Identification
Inhalation Asphyxia
Preventive Measures
Page 2 of 3
Accident Preventive Safety Procedure
Records
Inspection records generated by this procedure are to be managed in accordance with the
project procedures
Records of monitoring, analysis and improvement shall be maintained on site throughout the
contract.