Professional Documents
Culture Documents
Prq~cl Aqua
'Miral
Abu Dhabi
United Arab Errirates
Status NlA
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
Dear Sir,
Please find attached herewith Hilalco Letter PAQ-HIL··013200-LT-000056 dated 24 May 2018,
regarding Formalization of Verbal Instruction - Phase 01.
https:/Imea.aconexcom'Logon 1/1
HILALCO
AD 542
Projecl tJame: AQlIA
p~ ~ l' ~ ck~L-
t,
/. fl,p kArA""'frJ"
).. M&..~\.C ~ ~~.
1> • Gr- w..tv 6..-e-l Iv-t. ~
Cff V'o..Yi~ir""'-J.
A tc.~ ~ tart
-« ~i.""" A.( ~AJt..;*""U.
<to wlR~
(~.~.3)u~J' a ~j)lS~J4i~' .JYJ~ s\4...S~ . _,1.
: . I
.'
Ref: PAQ-HIL-013200-LT-000056
Date: 24 May 2018
MIRAL
Abu Dhabi, U.A.E.
With reference to our discussion during the meeting on 23 May 2018, kindly find below list of
completed works during Phase 01 which have impacted consultant's approvals due to verbal
instructions that were given on site at the time. Additionally, kindly find attached drawing indicating
the below completed works on site.
1. Kerbstones
Hilalco installed 125mm wide Kerbs instead of 150mm Kerbs as the supplier could not
provide 150mm at the time of urgency. (See attached Email Confirmation from Supplier)
2. Paving Patterns, Sizing & Material
Were selected by Miral and laying was completed as per verbal instruction from Miral
3. Palm Planting along Corniche Road
Was not part of IFC Drawings. Trees installed as per verbal instruction from Miral on
site
4. Timber Decking
Foundation Details do not match IFC Drawings. Job completed on site as per verbal
instruction by Miral
Shop Drawings (as built on site) to be submitted by Hilalco
5. Selection of Play Equipment (Volleyball Posts)
"Bin Sabt" was submitted and approved by ADM however the supplier used was
"Raymond Sports" instead, as per Miral confirmation by email.
6. Trees at the Outdoor Gym
Cannot be installed, Miral verbally agreed on site
7. Containers at Zone D
Horizontal Containers above the existing ones were not brought to site as per Miral
verbal instruction
8. Trees in Basketball Court Area
Site work not matching IFC Drawings. Two No. of trees not installed between 2
basketball courts as per Miral verbal instruction
9. Light Posts at Basketball Court Area
Location of Light Posts changed as per verbal instruction from Miral
(. '1') £ £"",00 I ~U\ (. '1') ,,,,,,,,,,,,, I ~ ;),\ .... -ell ~~I uljL.A~1 ~-,:,i,'1''' 'VVI'-l.~
P.o. Box: 28177 ,Abu Dhabi, UAE., Tel. : (02) 6998999, Fax: (02) 4488655, E-mail: hilalco@emirates.net.ae
Website: www.hilalco.com
(t'.,..j) u~J' a ~ ~IS~ J 4i~' .c.t~ J~ " a..s~ '.
c:).
,~ ___
I'~
__-_~ I
- .-,-. ..... ;- .....
.
-~ ~~
H,JLAlliB1L .BADI'& PARTNERS CONTRACTING COMPANY (WLL) " ' 1 II, " . I -.' ., I
~~~L: .L~.~ .~~
PAVING THE WAY FORWARD
In order to close out document/drawing submissions and obtain approvals, we would like to kindly
request a written acceptance for all the above verbal instructions that were given during Phase 01
of Project Aqua.
Yours faithfully,
For and on beha iI Badi & Partners Contracting Company WLL
[HIL CO] ~ 0 ~''tS'.Jw,
Encl: as stated
( • Y) tt "" '\ 0 0 I ~LS ( • Y) '\ ~~" ~ ~ ~ I ~ :if' ......:.al ~~I UIJL..~1 ~.Hit Y" WV I ":I.~
P.O. Box: 28177 , Abu Dhabi, UAE., Tel. : (02) 6998999, Fax: (02) 4488655, E-mail : hilalco@emirates.net.ae
Website: www.hilalco.com
KEY PLAN
1.KERBSTONES
2.PAVING PATTERNS
3.PALM PLANTING
4.TIMBER DECKING
5.VOLlEYBALl POSTS
6.TREES AT OUTDOOR GYM
7.CONTAINERS AT ZONE D
ul~
B.TREES IN BASKETBAll COURT AREA
9.lIGHTPOSTS AT BASKETBAll COURT AREA
MIRAL
Project Management Consultant
10.TUNNElISSUES
11 .PLAY AREA SHADE STRUCTURE
12.REMOVAL OF PLANTERS
KBR
13.TREES AT EAST END Lead Design Consultant :
t HILALCO (WLL)
\ P.O . Box. 28177. Abu Dhabi, U.A.E.
~
i Project Aqua
i CORNICHE BEACH
-:
Ii: REVITALIZATION
i.
TiUe
GENERAL LAYOUT
~c
~
..... . - - - -- ------- ----------------------- - - - - - 1
III
;::;
i
L
-~"'-