14.1 Is DG the free from oil and diesel leakage and No (tenk not 14.2 Is the Diesel Hoses are properly routed without
touching battery , starter motor terminal ? No No (Nahi hai)
Clean inside?. No unwanted material inside DG cleend)
Canopy(Clean if required) Damages in diesel hoses & correct length hoses used
( Correct if any problem noticed )
14.3 Start the engine and run for 15 mts and check Yes 14.4 Availability of coolant in Radiator and within Yes
DG is free from leakages / seepages, undue noise .
Check and ensure oil pressure is OK limits in auxiliary tank (fill if required)
14.7 Ensure Radiator Fins are not clogged /blocked( Yes Yes
Clean fins with soft brush or blower )and ensure 14.8 Are the fan belts in healthy condition
radiator Caps are available
14.11 Is DG hour meter,Lube oil pressure 14.12 Alternator output cables ( Phase and Neutral) is Yes
guage,Water temp guage,RPM meter working and is Yes connected with Lugs and no burning marks/no loose
free from damages and properly protected? connections
14.15 Is DG Exhaust Fan working and it's 14.16 Ensure engine breather clean ( no oil or excess No (Dg running by
wiring/cables are properly routed and connected in Yes can)
MCB(air cooled engine) smoke)
Engine Wiring Harness is not having any Fault/no Exhaust Bellow is in Healthy condition and No
loose connections and routed in the Flexible conduit Damages/No Leakages from Exhaust bellow
DG 2 Not Available
AC 1 Not Available
AC 2 Not Available
AC 3 Not Available
AC 4 Not Available
AC 5 Not Available
AC 6 Not Available
FCU 1 Not Available
FCU 2 Not Available
Safety Hygiene
1.1 Boundary wall and Gate in good condition at GBT Yes 1.2 Availability of roof edge protection in RTT / RTP Yes
Site? Site?
1.3 Is Caution Board(Entrance) displayed at the site Yes 1.4 Is Warning Board(Entrance) displayed at the site Yes
and maintained in good condition and maintained in good condition
1.7Are emergency contact nos. provided and No (Nahi likhe hai) 1.8 Are holes / cable entry in the floor / wall / roof of No (look Nahi hai)
updated ? the shelter closed ?
1.9 is the site free from Unwanted material ( OpCo & Yes Yes
Indus) ? 1.10 Is unwanted vegetation removed from the site ?
Photo of Lock Available on Gate, DG and Photo of Site free from unwanted material Photo of unwanted vegetation removed
Shelter
Yes 2.2 Check the availability of Kit kat fuse and/or MCCB Yes
2.1 Is the SEB Meter in working Condition ?
Box.
2.3 Validate and rectify the loose connection in the Yes 2.4 Cable entry points provided with glands or Yes
EB MCCB and/or kit kat fuse end. alternatively sealed adequately ?
2.5 Are there a minimum of 2 earth pits present and Yes 2.6 IGB is connected to EGB and EGB is connected to Yes
maintained properly ? earthing pit
SMPS 1
Make of SMPS Delta Controller Orion
Rating of SMPS 24 KW No. of Rectifier Module 4
SMPS Voltage 48V 9.1 Are loose connections tightened at Input MCB & Yes
neutral terminal block ?
9.2 Are the Shorting links in the Input MCB with Yes 9.3 Is SMPS free from burnt connector/ neutral bus Yes
16sqmm Cu cable/Cu Bus bar in case of two LCU? bar / MCCB / contactors ?
9.6 Are LVD 1 and LVD 2 ( Check LVD1 - 44V and Yes Yes
9.7 Are Float and Boost voltage setting OK ?
LVD2 - 42 V) settings Ok and no bypass ?
9.8 Are the no of rectifier modules adequate (n+1) as Yes 9.9 Are all Rectifier module back planes OK and Yes
per the load & battery requirement ? without any burnt condition ?
9.12 Is the out Door SMPS door Lock is OK and door Yes 9.13 Are OD SMPS Cabinet FANs in working Yes
is properly closed ? condition and also filter is clean ?
PM done No
PM Done
Deficiency Sub Deficiency Deficiency found
Rectifier Module
Spare Part
Photo of Input MCB Photo of Shorting Links Photo of Burnt Connector
Photo of LVD Setting Values Photo of Rectifier Modules Photo of Out Door SMPS door Lock
13.1 Is battery free from loose termination and no Yes 13.2 Check the Per cell voltage & variation should Yes
oxide formation on terminals not be of .01 volt cell to cell.
Yes 13.8 Is PP addon PCB and PIU controller modified for Yes
13.7 Check Li-Ion setings 0.6C of rated current of BB.
Li-Ion Battery.
PM done No
PM of BB
Deficiency Sub Deficiency Deficiency found
Replacement of
same make and
Spare Part
capacity cells
Photo of battery SMPS Temperature sensor cable
BB 2
Make of BB Amaraja Capacity 600 AH
13.1 Is battery free from loose termination and no Yes 13.2 Check the Per cell voltage & variation should Yes
oxide formation on terminals not be of .01 volt cell to cell.
13.3 Backup time available (in minutes) 40 13.4 No of cells faulty (If greater than 6 cells faulty 2
recommend for BB replacement)
13.7 Check Li-Ion setings 0.6C of rated current of BB. Yes 13.8 Is PP addon PCB and PIU controller modified for Yes
Li-Ion Battery.
PM done No
PM of BB
Deficiency Sub Deficiency Deficiency found
Replacement of
same make and
Spare Part
capacity cells
Photo of battery SMPS Temperature sensor cable
BB 3 Not Available
BB 4 Not Available
BB 5 Not Available
BB 6 Not Available
DCDC 1 Not Available
DCDC 2 Not Available
DCDC 3 Not Available
DCDC 4 Not Available
DCDC 5 Not Available
Isolation Transformer 1 Not Available
Isolation Transformer 2 Not Available
Isolation Transformer 3 Not Available
SP 1 Not Available
SP 2 Not Available
SPS 1
Make Intelux Rating 25 kVA
Are load properly balanced between all the phases ? YES Are all alarms are patched properly in SPS and NO