COOLING TOWER WATER USE

DATE: 27-Nov-18

Case:

Cooling Tower Water Use


Load: ton 600
Equiv Full Load Hours: h 8
Tower flow: gpm/ton 3
Water Flow Rate: gpm 1,800
Wet Bulb Temp: °F 78
Approach: °F 5
Delta T: °F 10
Inlet Water Temp: °F 93
Outlet Water Temp: °F 83
Correction Factor 1.06
Evaporation Loss: gpm 19.080
Drift: % 0.00500
Drift Loss: gpm 0.09
Cycles of Concentration: 4
Blowdown: gpm 6.36
Total Makeup water Required gpm 25.53

Per Day Required Quantity No of cooling


Towers
Evoporation Per day Liters 34664.544 4 138658.176
Drift Loss Per day Liters 163.512 4 654.048
Blowdown Per day Liters 11554.848 4 46219.392
Total Makeup water Liters 46382.904 185531.616