Professional Documents
Culture Documents
METHOD STATEMENT
SUBMITTAL FORM
Project No. & Name: RAK FISHERMEN’S PORT
G Method Statement for TILING WORKS / Quality Control Procedure For TILING WORKS
1- purpose 1- purpose
2- scope 2- scope
3- reference 3- reference
4- definitions 4- definitions
5- responsibilities 5- responsibilities
6- equipment 6- procedures
7- procedure 7- attachment
8- health & safety requirements
9- attachments
Contractor Signature:
Distribution:
Client Engineer Contractor