You are on page 1of 2

PROGRAM STUDI TEKNIK Hal : 138

SIPIL
FAKULTAS TEKNIK SIPIL PERENCANAAN NRP :
DAN PERENCANAAN BANGUNAN 1.21415169
UNIVERSITAS KRISTEN BETON 2.21415175
PETRA

BAB XIII PIT LIFT

13.1 Check tegangan tanah


Berat sendiri :
Plat Dasar : 0.3 x 5.3 x 2.4 x 2400 = 9159.4 kg
Plat dinding : 0.3 x 5.3 x 1.3 x 2400 = 8776.8 kg
: 0.3 x 2.4 x 1.3 x 2400 = 2246.4 kg +
20182.6 kg
36011.52
Tegangan tanah yang terjadi = = 0.158 kg/cm2
530 𝑥 240
Tegangan tanah bruto = 0.40 kg/cm2
Tegangan tanah bruto > Tegangan tanah yang terjadi (OK)

13.2 Penulangan Plat

ᶲ=0 O

C = 0.02 kg/cm2
∂tanah =1800 kg/m3
Ka = tan2 (45° - ᶲ/2 ) = 1
σa = - 2c√𝐾𝑎 + (∂.z + q )
z = 1.3m  σa = - 1.3 x (0.02 x 10000) √1 + (1800 x 1.3 + 0 ) = 3200 kg/m’

a/b = 1.2/1.3 = 0.93 ~ 1  Cx = 0.0317


Cy = 0.1128
Mx = 0.0317 x 3200 x 1.22 = 447.3504 kgm = 4.48 kNm
My = 0.1128 x 3200 x 1.22 = 159.184 kgm = 1.592 kNm
PROGRAM STUDI TEKNIK Hal : 139
SIPIL
FAKULTAS TEKNIK SIPIL PERENCANAAN NRP :
DAN PERENCANAAN BANGUNAN 1.21415169
UNIVERSITAS KRISTEN BETON 2.21415175
PETRA

BAB XIII PIT LIFT

Digunakkan tulangan D13 mm ; fc = 30 Mpa ; fy = 400 Mpa :

Arah X :
dx = 300 – 50 – 6.5 = 244.5 mm
4.48 𝑥 1.6
Mu/bd2 = = 120.398  ρ = 0.000898
1 𝑥 0.244 𝑥 0.2445
Asx = 0.000898 x 1000 x 244.5 = 219.112 mm2

Arah Y :
dx = 300 – 50 – 6.5 = 244.5 mm
1.592 𝑥 1.6
Mu/bd2 = = 47.325  ρ = 0.0005
1 𝑥 0.232 𝑥 0.2445
Asy = 0.0005 x 1000 x 244.5 = 116 mm2

As minimum = 0.0025 x 1000 x 154 = 385 mm2


Tulangan pembagi : 20% × As = 20% × 360 = 72 mm2
Luas tulangan : ¼ x 3.14 x 132 =133 mm2
Luas tulangan : ¼ x 3.14 x 102 = 78.5 mm2

Digunakan Asminimum = 360 mm2 ( D13 – 200 )


Tulangan pembagi yang terpasang : Ø10 – 300