Professional Documents
Culture Documents
322-A-34 Jovita Agodilla
322-A-34 Jovita Agodilla
* NOTES : UNIT COSTS ARE BASED ON THE DPWH'S CONSTRUCTION MATERIALS PRICE DATA AS OF 3rd QUARTER OF CY 2018.
STRUCTURAL DETAILS
FOOTING LENGTH (m) WIDTH (m) THICKNESS (m) HEIGHT (m) PIECES SLAB THICKNESS (m)
C-1 1.10 1.10 0.15 0.30 6.00 Ground Slab 0.10
WF-1 43.98 0.30 0.35 3.00
COLUMN LENGTH (m) WIDTH (m) HEIGHT (m) PCS BEAM WIDTH (m) DEPTH (m) LENGTH (m)
C-1 0.35 0.30 5.75 2 B1 0.2 0.3 15.4
C-1 0.35 0.30 8.05 4 B2 0.2 0.3 13.2
B3 0.15 0.25 4.4
LB1 0.15 0.2 2.6
LB2 0.15 0.2 2.5
RB1 0.15 0.25 7.7
I. EARTH WORKS RB2 0.15 0.25 8.8
A. Excavation Length Width Height Pieces Quantity
a.Vol.Footing = 1.10 x 1.10 x 0.30 x 6.00 = 2.18 excavate
b.Vol. septic tank = 1.50 x 1.50 x 1.50 x 2.00 = 6.75 excavate
c.Vol. Wall Footing = 43.98 x 0.30 x 3.00 x 1.00 = 39.58 excavate
Vol. Excavate = 48.51 cu.m.
Parametric Cost = 3.04 cu.m./day
Volume Factor [2] Total Man-days
48.51 / 3.04 = 15.96
1.09 cu.m.
0.05 =5% allowance for wastage [4/5]
1.14 cu.m
Class A Concrete Volume Factor [1]
Quantity
Cement = 1.14 x 9.00 = 10.26 bags
Sand = 1.14 x 0.50 = 0.57 cu.m.
Gravel = 1.14 x 1.00 = 1.14 cu.m.
Reinforcement
218
Total 219.0
4.32 cu.m.
Class A Concrete Volume Factor [1]
Quantity
Cement = 4.32 x 9.00 = 38.88 bags
Sand = 4.32 x 0.50 = 2.16 cu.m.
Gravel = 4.32 x 1.00 = 4.32 cu.m.
Reinforcement
Total 383.00
c. V beam Total Length Width Depth Pieces Quantity
200 x300 = 28.60 x 0.20 x 0.30 x 1.00 = 1.72
150 x 250 = 20.90 x 0.15 x 0.25 x 1.00 = 0.78
150 x 200 = 5.10 x 0.15 x 0.20 x 1.00 = 0.15
3.60 cu.m.
0.18 =5% allowance for wastage [4/5]
3.78 cu.m.
Class A Concrete Volume Factor [1]
Quantity
Cement = 3.78 x 9.00 = 34.02 bags
Sand = 3.78 x 0.50 = 1.89 cu.m.
Gravel = 3.78 x 1.00 = 3.78 cu.m.
Reinforcement
Total = 395.86 kg
10.67 cu.m.
Class A Concrete Volume Factor [1]
Quantity
Cement = 10.67 x 9.00 = 96.03 bags
Sand = 10.67 x 0.50 = 5.34 cu.m.
Gravel = 10.67 x 1.00 = 10.67 cu.m.
Reinforcement
Area Factor Quantity
Ground Slab t0 3rd Floor Slab = 101.64 x 2.47 = 250.85 kg Note: thk = 0.10m
5.25 cu.m.
Class A Concrete Volume Factor [1]
Quantity
Cement = 5.25 x 9.00 = 47.25 bags
Sand = 5.25 x 0.50 = 2.63 cu.m.
Gravel = 5.25 x 1.00 = 5.25 cu.m.
Reinforcement
Area Factor Quantity
Typical Steps = 0.49 x 12.43 = 6.09 kg
Landing = 4.12 x 12.43 = 51.16 kg
Total = 57.25 kg
4.85 cu.m
Class B Concrete Volume Factor [1]
Quantity
Cement = 4.85 x 8.00 = 38.80 bags
Sand = 4.85 x 0.50 = 2.43 cu.m.
Gravel = 4.85 x 1.00 = 4.85 cu.m.
Reinforcement
Total Length Factor Quantity
WF = 43.98 x 3.32 = 146.00 kg
Total = 146.00 kg
41.05 sq.m.
Area Factor [1]
No. of Uses
1/2" Ordinary Plywood = 41.05 / 2.880 / 2.00 = 7.13 say 8.00 pcs
No. of Plywood Factor [1]
Scaffoldings:
Total Height
a. Column = 11.50 m
Using 2" x 2" Total Height Factor [1]
No. of Uses Quantity
Vertical Support: = 11.50 x 4.70 / 1.00 = 54.05
Horizontal Support: = 11.50 x 21.00 / 1.00 = 241.50
Diagonal Braces: = 11.50 x 11.70 / 1.00 = 134.55
Total Board Foot Factor [1]
Assorted Common Wire Nails = 430.10 x 0.018 = 7.74 kgs
Total Length
b. Beam = 79.10 m
Using 2" x 2" Total Length Factor [1]
No. of Uses Quantity
Vertical Support: = 79.10 x 4.00 / 1.00 = 316.40 bd.ft.
Horizontal Support: = 79.10 x 4.70 / 1.00 = 371.77 bd.ft.
Total Board Foot Factor [1]
Assorted Common Wire Nails = 688.17 x 0.018 = 12.39 kgs
STRUCTURAL DETAILS
SLAB THICKNESS (m) AREA (sq. m.)
SOF (pavement) 0.10 13.618
I. EARTH WORKS
Excess Backfill from Excavation of CF and WF of Fence = cu.m.
A. Backfill
ADDITIONAL BACK FILL DUE TO EMBANKMENT
a.V slab on fill (pavement) Vol. Backfill Vol. concrete Vol. backfill Pieces Quantity
= 7.49 - 1.36 = 6.13 x 1.00 = 6.13 backfill
Vol. backfilled = 6.13 cu.m.
Parametric Cost = 9.76 cu.m./day
Compaction Factor = 1.25 (25% Compaction)
Volume Factor [2] Factor [2] Total Man-days
6.13 x 1.25 / 9.76 = 0.79
STRUCTURAL DETAILS
COLUMN LENGTH (m) WIDTH (m) HEIGHT (m) PCS WALL FTG. WIDTH (m) DEPTH (m) THICKNESS LENGTH (m)
- - - - - WF 0 0.00 0.00 13.55
I. EARTH WORKS
A. Excavation Length Width Height Pieces Quantity
b.Vol. WF = 13.55 x 0.00 x 0.00 x 1.00 = - excavate
Vol. Excavate = - cu.m.
Parametric Cost = 3.04 cu.m./day
Volume Factor [2] Total Man-days
0.00 / 3.04 = -
- cu.m
Class B Concrete Volume Factor [1]
Quantity
Cement = 0.00 x 7.50 = - bags
Sand = 0.00 x 0.50 = - cu.m.
Gravel = 0.00 x 1.00 = - cu.m.
Reinforcement
Total Length Factor Quantity
WF = 13.55 x 3.19 = 43.22 kg
Total = 43.22 kg
REFERENCE:
[1]
"Simplified Construction Estimate" by Max B. Fajardo Jr.
[2]
"Handbook of Construction Estimate" by Rheno A. Velasco
[3]
ASEP Steel Handbook
[4]
IRR of Republic Act No. 10752, Section 6 - Replacement Cost
[5]
"Estimating Bill of Materials" by Vicente A. Tagayun
M104.00-0000
M203.01-0001 LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE CRUSHED GRADING A CUM
520
M203.02-0002 LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE CRUSHED GRADING B CUM
470
M203.03-0003 LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE UNCRUSHED GRADING A CUM
520
M203.04-0004 LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE UNCRUSHED GRADING B CUM
470
M400.00-0000 PILING
M400.39-0039 ACETYLENE KG
68
M400.42-0042 OXYGEN KG
42
M501.00-0000 UNDERDRAINS
M604.00-0000 FENCING
M605.19-0019 CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (457mm x 610mm) PC
2685
M605.20-0020 CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (610mm x 914mm) PC
4622
M605.21-0021 CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (1219mm x 1828mm) PC
12090
M607.16-0016 RAISED REFLECTIVE PAVEMENT STUD (RPS27 RSE HARDMAN CAT'S EYE SQUARE TYPE) PC
550
M608.00-0000 TOPSOIL
M610.00-0000 SODDING
M709.00-0000 PAINTS
M714.00-0000 WATER
M1002.02-0002 WATER CLOSET INCLUDING FITTINGS AND ACC. (ROUND) AMERICAN STD OR SET
EQUIVALENT 4500
M1002.03-0003 LAVATORY INCLUDING FITTINGS AND ACC. AMERICAN STD OR EQUIVALENT SET
6500
M1002.04-0004 URINAL INCLUDING FITTINGS AND ACC. AMERICAN STD OR EQUIVALENT SET
4800
M1004.00-0000 HARDWARE
M1100.20-0020 OCTAGONAL JUNCTION BOX TYPE GAUGE #16 (101mm x 101mm x 53mm) DEEP PC
M1100.45-0045 ENCLOSED AIR CIRCUIT BREAKER 100AF, 3P, 220V, 70AT NEMA I SET
1350
M1100.46-0046 ENCLOSED AIR CIRCUIT BREAKER 50AF, 3P, 220V, 40AT NEMA I SET
1200
M1100.47-0047 ENCLOSED AIR CIRCUIT BREAKER 50AF, 2P, 220V, 40AT NEMA I SET
550
NORTH
AVERAGE NORTH MANILA DEO MANILA DEO
602.50
385.80
651.11 650.00
604.00
360.00 410.00
285.00
260.00
387.50
260.00
537.50
509.67
516.67 520.00
466.50 470.00
516.67 520.00
469.86 470.00
525.00
420.71 420.00
414.29 400.00
425.00 420.00
523.75 520.00
423.75 420.00
405.00 400.00
334.29 320.00
573.75 570.00
523.75 520.00
514.29 500.00
573.75 570.00
523.75 520.00
514.29 500.00
573.75 570.00
523.75 520.00
505.00 500.00
3500.00
3994.00
4208.33
4653.33
3740.00
4233.33
4505.00
4926.00 5000.00
3750.00
4351.67
4269.25
4367.50
70.00 70.00
35.00 35.00
38.00 38.00
45.00 45.00
50.00 50.00
53.00 53.00
58.00 58.00
51.00 51.00
1280.00 1280.00
1402.00 1402.00
1830.00 1830.00
1600.00 1600.00
1900.00 1900.00
2100.00 2100.00
47.00 47.00
50.00 50.00
1500.00 1500.00
1700.00 1700.00
1900.00 1900.00
2040.00 2040.00
2160.00 2160.00
2280.00 2280.00
2713.00 2713.00
3391.00 3391.00
48.22 48.00
50.00 50.00
55.00 55.00
55.00 55.00
8138.00
9494.00
10850.00
12207.00
13563.00
14920.00
16288.00
17633.00
18989.00
20345.00
21701.00
23058.00
24415.00
25771.00 25771.00
27126.00
33909.00
40691.00
55.00 55.00
68.00 68.00
600.00 600.00
450.00
42.00 42.00
40.00 40.00
35.00 35.00
60.00 60.00
103.43
150.00 150.00
90.00
55.00
55.00 55.00
55.00 55.00
53.57 55.00
45.00 45.00
42.00
120.00 120.00
4500.00 4500.00
75.00 75.00
5000.00 5000.00
46.00 46.00
46.00 46.00
46.00 46.00
49.56 50.00
50.00 50.00
150.00 150.00
150.00 150.00
650.00 650.00
150.00 150.00
38.72 38.72
39.50 39.50
38.72 38.72
39.50 39.50
80.00
66.00
89.33
70.00
1870.00
1201.00
554.67
422.00 422.00
402.00 402.00
402.00 402.00
575
447
511.00 535.00
35.00 35.00
50.00
120.00 120.00
1098.33
1135.00
423.33
780.00
1360.00
385.00
691.67
1175.00
835.00
12000.00 12000.00
15000.00 15000.00
18000.00 18000.00
23000.00 23000.00
23500.00 23500.00
24000.00 24000.00
29000.00 29000.00
31888.89 33000.00
1750.00 1750.00
55.00 55.00
250.00 250.00
33.00 33.00
150.00 150.00
650.00 650.00
5800.11 5800.00
10100.00 10100.00
16125.00 16125.00
2045.00 2045.00
1000.00 1000.00
450.42
700.00
950.00
1795.00
2170.00
2900.00
3800.00
5282.00
6175.00
850.00
1400.00
1978.33
3250.00
4450.00
5800.29
7164.17
8200.00
10200.00
410.00 410.00
490.00 490.00
550.00 550.00
10.00
20.00
13.00
15.00
85.00 85.00
920.00 920.00
810.00 810.00
740.00 740.00
650.00 650.00
1100.00 1100.00
860.00 860.00
780.00 780.00
700.11 700.00
1100.00 1100.00
750.00 750.00
1700.00 1700.00
2150.00 2150.00
2300.00 2300.00
2800.00 2800.00
3200.00 3200.00
1950.00 1950.00
2250.00 2250.00
2250.00 2250.00
2900.00 2900.00
3300.00 3300.00
3700.00 3700.00
4100.00 4100.00
160.00 160.00
275.00 275.00
300.00 300.00
500.00 500.00
1500.00 1500.00
1300.00 1300.00
880.00 880.00
452.50
7000.00
8200.00
770.00 770.00
1002.00 1002.00
1300.00 1300.00
880.00 880.00
950.00 950.00
3850.00 3850.00
250.00 250.00
400.00
95.00 95.00
225.00 225.00
245.00 245.00
1300.00 1300.00
1650.00 1650.00
1542.00 1542.00
1950.00 1950.00
1100.00 1100.00
1950.00 1950.00
2300.00 2300.00
3350.00 3350.00
21.00 21.00
25.00 25.00
28.00 28.00
10.00 10.00
15.00 15.00
990.00 990.00
1320.00 1320.00
1650.00 1650.00
1980.00 1980.00
88.00 88.00
2860.00 2860.00
4821.00 4821.00
2860.00 2860.00
4820.88 4821.00
3180.00 3180.00
6066.00 6066.00
2860.00 2860.00
4821.00 4821.00
3180.00 3180.00
6066.00 6066.00
2134.00
3698.00
2685.00
5314.00
5612.00
7733.00 7733.00
11850.00 11850.00
14656.00 14656.00
2685.00 2685.00
4622.00 4622.00
14335.25 14656.00
1345.00
292.50
237.50
70.00 70.00
50.00
1705.00
1755.00
212.00
224.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
550.00 550.00
490.00
60.00 60.00
98.00
58.00
115.00
350.00 350.00
1300.00
1150.00 1150.00
54.00 54.00
250.00 250.00
310.00 310.00
150.00 150.00
40.00 40.00
110.00 110.00
110.00 110.00
410.00 410.00
70.00 70.00
70.00 70.00
70.00 70.00
223.50
230.00
196.25
48000.00 48000.00
47000.00 47000.00
45000.00 45000.00
43000.00 43000.00
45000.00 45000.00
44000.00 44000.00
43000.56 43000.00
42000.00 42000.00
45000.00 45000.00
55151.43
43000.00 43000.00
54675.00 54675.00
36000.00 36000.00
43980.00 43980.00
55000.00
57000.00
55616.14
5200.00
5160.00
88.00 88.00
95.00 95.00
105.00 105.00
120.00 120.00
200.00 200.00
320.00 320.00
550.00 550.00
850.00 850.00
100.00 100.00
280.00 280.00
45.00 45.00
370.00 370.00
65.00 65.00
290.00 290.00
115.00 115.00
450.00 450.00
70.00 70.00
250.11 250.00
120.00 120.00
540.00 540.00
95.00 95.00
450.00 450.00
43.75 45.00
50.00
575.00
591.67
566.00
565.00
387.00
230
222.50
670.00
520.00
50
90.00
124.00
160.00
410.00 410.00
20
90.00 90.00
55.00 55.00
90.00 90.00
55.00 55.00
90.00 90.00
90.00 90.00
4.00
96.29
56.00
52.20
52.71
48.00
77.00
180.00
220.00
228.57
280.00
220.00
195.00
320.00 320.00
335.00
6850.00 6850.00
4500.00 4500.00
6500.00 6500.00
4800.00 4800.00
165.00 165.00
305.00
433.57 420.00
618.57 600.00
1025.00
1415.00 1415.00
1985.33 1985.00
2250.00 2250.00
2600.00 2600.00
3401.43 3410.00
8.00
10.00
14.00
25.00
58.00
70.00 70.00
75.00 75.00
95.00 95.00
120.00 120.00
10.00
12.00
25.00
62.00
68.00
75.00
80.00
180.00
8.00
10.00
18.00
25.00
35.00
65.00
95.00
120.00
5.00
8.00
15.00
25.00
35.00
36.00
55.00
64.00
32.00
36.00
75.00
90.00
112.00
150.00
222.00
350.00
12.00
14.00
18.00
24.00
48.00
65.00
70.00
85.00
71.25
101.67
135.75
235.00
236.67
381.20 296.00
467.50
442.20 531.00
592.50
6.00
7.00 7.00
10.00 10.00
15.00
17.83 17.00
24.14 24.00
29.71 28.00
45.00 45.00
45.00
7.00
9.00
12.00
24.14 24.00
35.00 35.00
6.00
9.00
14.00
24.00 24.00
18.00 18.00
47.00 47.00
21.00 21.00
38.00 38.00
60.00 60.00
26.00 26.00
50.00 50.00
81.00 81.00
81.00 81.00
89.00
81.00
100.00
120.00
126.00
37.00
94.00
100.38 96.00
110.00
128.00
135.00
74.00 74.00
173.00 173.00
270.00 270.00
107.00
194.00
277.00
21.00
36.00
59.00
30.57 22.00
47.00
52.00 52.00
6.00
7.00
11.00
23.00
41.00
88.00 88.00
88.00 88.00
1935.00
1340.00 1340.00
16500.00 16500.00
165.00 165.00
5015.71
280.17
260.00 260.00
500.83 500.00
387.00
33.00 33.00
1600.00
189.00 185.00
8.00
22.00 22.00
35.00 35.00
100.00 100.00
40.00 40.00
24.00 24.00
30.00 30.00
160.00
185.00
230.00
60.00 60.00
65.00
1600.00
1500.00 1500.00
2300.00 2300.00
450.00 450.00
120.00 120.00
85.00 85.00
890.00 890.00
1700.00 1700.00
5200.00 5200.00
4500.00 4500.00
6500.00 6500.00
1900.00 1900.00
2100.00 2100.00
3000.00 3000.00
1800.00 1800.00
1850.00 1850.00
650.00 650.00
450.00 450.00
550.00 550.00
4800.00 4800.00
5500.00 5500.00
135.00 135.00
370.00 370.00
290.89 291.00
168.38 168.00
97.63 98.00
168.00 168.00
77.00 77.00
168.00 198.00
98.00 98.00
1300.00 1300.00
740.00 740.00
850.00 850.00
1500.00 1500.00
780.00 780.00
300.00 300.00
360.00 360.00
375.00 375.00
225.00
480.00
726.00
6.00
9.00
12.00
191.00 191.00
69.00
92.00
120.00
18.00 18.00
8.00
14.00
16.00
15.00 15.00
22.00 22.00
34.00 34.00
5.00 5.00
8.00 8.00
31.00
30.00
31.00
37.00
350.00 350.00
750.00 750.00
1600.00 1600.00
1850.00 1850.00
65.00 65.00
98.00 98.00
30.00
92.00
190.00
33.00
24.00
23.00
24.00
28.00 28.00
92.00
126.00
170.00
145.63 140.00
127.00
351.25 350.00
450.00 450.00
1350.00 1350.00
1200.00 1200.00
550.00 550.00
25.00
1220.00 1220.00
1500.00 1500.00
299.00 299.00
381.00 381.00
723.00 723.00
360.00 360.00
830.00 830.00
620.00 320.00
1150.00 1150.00
980.00 980.00
1200.00 1200.00
320.89 320.00
1250.00 1250.00
1300.00 1300.00
3975.00 3975.00
13891.11 13890.00
1855.00 1855.00
3600.00 3600.00
197.33 197.00
22.00 22.00
35.00 35.00
50.00 50.00
55.00 55.00
750000.00
18742.86 19000.00
20999.29 20995.00
21000.00 21000.00
STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATES FOR IMPROVEMENT
EARTHWORKS
CAPABILITY
UNIT TYPE OF WORK
cu.m. per day Shallow Well (cu.m./day)
Excavation 3.04 24.32
Man days Backfilling 9.76 78.08
+ 25% Compaction
*SOURCE: HANDBOOK OF CONSTRUCTION ESTIMATE
By: RHENO VELASCO
Concrete Propotion
Mixture Cement in Bag Sand Gravel
Proportion
Class 40 kg. 50 kg. cu.m. cu.m.
A 1:2:4 9.0 7.0 0.5 1.0
B 1 : 2 1/2 : 5 7.5 6.0 0.5 1.0
Note : Use Class "A" for Structural members
Note : Use Class "B" for Wall Footing, Slab On-Grade, Septic Tank, CHB Water Tank & Masonry Works
Quantity of Cement and Sand For Mortar and Plaster in Square Meter
Bags Cement Mixture
Size of CHB in cm Number per sq meter
A B C D Sand
4" (10 x 20 x 40) 12.5 0.792 0.522 0.394 0.328 0.0435
6" (15 x 20 x 40) 12.5 1.526 1.018 0.763 0.633 0.0844
Note : Use Class B mixture
Quantity of Cement and Sand for Plaster Per Square Meter Area
Cement in Bags Thickness of Plaster
Mixture Class
8mm 12mm 16mm 20mm 25mm
A 0.144 0.216 0.288 0.36 0.45
B 0.096 0.144 0.192 0.24 0.3
C 0.072 0.108 0.144 0.18 0.225
D 0.06 0.09 0.12 0.15 0.188
Sand 0.008 0.012 0.016 0.02 0.025
Note : Use 12mm Class B mixture
Slab
Concrete Mixture Dimension of Slab , m Reinforcing Bars
Description
Class Length Width Thick Bar Ф, mm Spacing, m # of Pcs Bothways Total Length, m Unit Wt. of Bar, kg/m Wt. of Bar Wt of Bar/m2
Ground Slab for all Classes B 3 3 0.1 10 0.6 12 36 0.617 22.21 2.47
Suspended Slab / Stairs A 3 3 0.15 12 0.15 42 126 0.888 111.89 12.43
Pavement B 3 3 0.2 16 0.75 10 31 1.578 48.92 5.44
*SOURCE: STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATE FOR IMPROVEMENTS
By: PATRICK B. GATAN
REINFORCEMENT 2
Beam/FTB
Reinforcing Bars
Dimension of Beam, m
Horizontal Bars Stirrups
Wt. of
Unit Wt. Wt. of Wt. of Unit Wt Steel Tie
Bar Ф, # of Bars Total of Bar, Bar per Bar per Steel Tie Spacing, # of Pcs of Steel per Beam Wt of Steel Tie Total Wt of Bar Total Wt of Bar per
Width Depth Span mm per Beam Length, m kg/m Beam, Kg L.m. Ф, mm m per Beam Tie, Kg/m (Kg) er L. m. per Beam Lm
0.15 0.25 3 12 4 12 0.888 10.656 3.55 10 0.15 20 0.617 8.638 2.88 19.29 6.43
0.2 0.3 3 12 4 12 0.888 10.656 3.55 10 0.15 20 0.617 11.106 3.70 21.76 7.25
0.25 0.3 3 12 6 18 0.888 15.984 5.33 10 0.15 20 0.617 11.723 3.91 27.71 9.24
0.3 0.4 3 16 6 18 1.578 28.404 9.47 10 0.15 20 0.617 15.425 5.14 43.83 14.61
0.35 0.4 3 16 6 18 1.578 28.404 9.47 10 0.15 20 0.617 16.659 5.55 45.06 15.02
0.15 0.2 3 12 4 12 0.888 10.656 3.55 10 0.15 20 0.617 6.787 2.26 17.44 5.81
*SOURCE: STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATE FOR IMPROVEMENTS
By: PATRICK B. GATAN
Roof Beam
Reinforcing Bars
Dimension of Beam, m
Horizontal Bars Stirrups Wt. of
Unit Wt. Wt. of Wt. of Unit Wt Steel Tie
Bar Ф, # of Bars Total of Bar, Bar per Bar per Steel Tie Spacing, # of Pcs of Steel per Beam Wt of Steel Tie Total Wt of Bar Total Wt of Bar per
Width Depth Span mm per Beam Length, m kg/m Beam, Kg L.m. Ф, mm m per Beam Tie, Kg/m (Kg) per L. m. per Beam Lm
0.15 0.2 3 12 4 12 0.888 10.656 3.55 10 0.15 20 0.617 8.021 2.67 18.68 6.23
0.2 0.25 3 12 4 12 0.888 10.656 3.55 10 0.15 20 0.617 9.255 3.09 19.91 6.64
0.15 0.25 3 12 6 18 0.888 15.984 5.33 10 0.15 20 0.617 7.404 2.47 23.39 7.80
0.25 0.35 3 16 6 18 1.578 28.404 9.47 10 0.15 20 0.617 12.34 4.11 40.74 13.58
*SOURCE: STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATE FOR IMPROVEMENTS
By: PATRICK B. GATAN
Column
Reinforcing Bars
Dimension of Column, m Wt. of
Vertical Bars Stirrups
# of Bars Unit Wt. Wt. of Wt. of Unit Wt Steel Tie Total Wt of Bar Total Wt of Bar per
Bar Ф, per Total of Bar, Bar per Bar per Steel Tie Spacing, # of Pcs of Steel per Col. Wt of Steel Tie per Col Lm
b d Height mm Column Length, m kg/m Col, Kg L.m. Ф, mm m per Col Tie, Kg/m (Kg) er L. m.
0.2 0.2 3 12 4 13.2 0.888 11.722 3.91 10 0.15 20 0.617 8.021 2.67 19.74 6.58
0.2 0.25 3 12 4 13.2 0.888 11.722 3.91 10 0.15 20 0.617 9.255 3.09 20.98 6.99
0.25 0.25 3 12 6 19.8 0.888 17.582 5.86 10 0.15 20 0.617 11.106 3.70 28.69 9.56
0.25 0.3 3 12 6 19.8 0.888 17.582 5.86 10 0.15 20 0.617 11.723 3.91 29.31 9.77
0.2 0.3 3 16 6 19.8 1.578 31.244 10.41 10 0.15 20 0.617 10.489 3.50 41.73 13.91
0.3 0.3 3 16 6 21 1.578 33.138 11.05 10 0.15 20 0.617 12.957 4.32 46.10 15.37
0.3 0.4 3 16 6 21 1.578 33.138 11.05 10 0.15 20 0.617 15.425 5.14 48.56 16.19
0.15 0.2 3 12 4 12.8 0.888 11.366 3.79 10 0.15 20 0.617 6.787 2.26 18.15 6.05
*SOURCE: STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATE FOR IMPROVEMENTS
By: PATRICK B. GATAN
CARPENTRY WORKS
Wooden Flooring
Girder / Floor Joist / Bridging Flooring Weight of Nails (Kg/m2)
Floor Joist Floor Joist Spacing, m Bf / m2 T & G (Bf/m2) Plywood (Pc/m2) T&G Plywood
2"x 2" 0.3 10.741 13.889 0.347 0.443 0.198
2"x 4" 0.3 15.554 13.889 0.347 0.53 0.284
2"x 6" 0.3 20.37 13.889 0.347 0.617 0.371
Wood Sidings
Type Walling Vertical & Horizontal Stud Size Studs Spacing Studs Bf/m2 Plywood Walling Pc/m2 Nails Kg/m2 Sidings Brd T&G 8" Bf/m2
Single Wall 2" x 2" 0.6 4.538 0.347 0.086 12.76
Double Wall 2" x 2" 0.6 4.538 0.694 0.09 N.A.
Wooden Ceiling
Size of Ceiling Joist Spacing of Ceiling Joist Ceiling Joist Bf/m2 Plywood Pc/m2 Nails Kg/m2
2" x 2" 0.4 6.667 0.347 0.124
2" x 2" 0.6 4.444 0.347 0.084
*SOURCE: STANDARD FACTORS FOR COMPUTATION OF REPLACEMENT COST ESTIMATE FOR IMPROVEMENTS
By: PATRICK B. GATAN
SEPTIC TANK
Residential Commercial
No of Person Served 1 to 5 6 to 10 11 to 15 16 to 20 21 to 30 31 to 40 41 to 50 51 to 75 76 to 100
Inside Width 0.9 1.1 1.2 1.5 1.3 1.5 1.5 2 2
Inside Length + Leeching 1.5 2 2.7 3 2.1 2.5 3 3.3 3.6
Inside Height 1.5 1.5 1.5 1.5 1.5 1.5 1.6 1.8 2
1 2
10mm x 6m length 122.08 10 122.08 3.70 33.00
10mm x 7.5m length 152.60 10 152.60 4.62 33.00
10mm x 9m length 183.12 10 183.12 5.55 33.00
10mm x 10.5m length 213.64 10 213.64 6.47 33.00
10mm x 12m length 244.16 10 244.16 7.40 33.00
ONE-WAY TWO
BAR
BAR SPACING NUMBER OF STEEL BARS PER SQUARE METER SPACING NUMBER OF STEE
CM 6 7.5 9 12 CM 6
10 3.764 2.937 2.421 1.769 10 4.369
12.5 3.062 2.381 1.934 1.427 12.5 3.603
15 2.584 2.004 1.636 1.197 15 3.221
17.5 2.232 1.726 1.407 1.033 17.5 2.647
20 1.98 1.528 1.248 0.914 20 2.36
22.5 1.786 1.369 1.199 0.81 22.5 2.168
25 1.627 1.25 1.014 0.736 25 1.977
C. Reinforcement