DATE:- 25/10/2018 PLACE:- KADI

ROW HOUSE
QUOTATION FOR CONSTRUCTION WORK

 ALL LABOUR RATE 350/- Sq. Ft


 THE RATE CALCULATED FOR EXCAVATION & BACK FILLING, PCC, RCC, BRICK
MASONRY, PLASTERING WORK, ELECTRIC WORK, PLUMBING WORK, COLOUR WORK,
FLOORING WORK.

NOTES:-

 THE RATES WILL BE CALCULATED AS PER OUT TO OUT SLAB MEASUREMENT.


 THE GROUND FLOOR SLAB WILL BE CALCULATED IN MULTIFICATION OF 1.5.
 THE WATER CURING WILL BE DEPENDED ON PARTY.
 THE PAYMENT WILL BE TAKEN PER WEEK FOR LABOUR EXPENSE.
 THE PAYMENT WILL BE TAKEN AS COMPLETION OF WORK.
 THE COLOUR WORK DOESN’T INCLUDE TEXTURE.
 THE WATER TANK RATE WILL BE CALCULATED AS PER LITRE.
 THE FLOORING WORK DOESN’T INCLUDE APOXY GROOW.