This document provides a quotation for construction work on a row house in Kadi, Gujarat, India dated October 25th, 2018. It lists the labor rate as 350 rupees per square foot and includes rates for excavation, backfilling, concrete work, brick masonry, plastering, electrical, plumbing, painting, and flooring. Additional notes specify that measurements and payments will be based on outer slab dimensions, with the ground floor slab rate multiplied by 1.5. It also provides details on curing, payment schedules, exclusions for color and flooring work, and pricing for water tanks.
This document provides a quotation for construction work on a row house in Kadi, Gujarat, India dated October 25th, 2018. It lists the labor rate as 350 rupees per square foot and includes rates for excavation, backfilling, concrete work, brick masonry, plastering, electrical, plumbing, painting, and flooring. Additional notes specify that measurements and payments will be based on outer slab dimensions, with the ground floor slab rate multiplied by 1.5. It also provides details on curing, payment schedules, exclusions for color and flooring work, and pricing for water tanks.
This document provides a quotation for construction work on a row house in Kadi, Gujarat, India dated October 25th, 2018. It lists the labor rate as 350 rupees per square foot and includes rates for excavation, backfilling, concrete work, brick masonry, plastering, electrical, plumbing, painting, and flooring. Additional notes specify that measurements and payments will be based on outer slab dimensions, with the ground floor slab rate multiplied by 1.5. It also provides details on curing, payment schedules, exclusions for color and flooring work, and pricing for water tanks.
THE RATE CALCULATED FOR EXCAVATION & BACK FILLING, PCC, RCC, BRICK MASONRY, PLASTERING WORK, ELECTRIC WORK, PLUMBING WORK, COLOUR WORK, FLOORING WORK.
NOTES:-
THE RATES WILL BE CALCULATED AS PER OUT TO OUT SLAB MEASUREMENT.
THE GROUND FLOOR SLAB WILL BE CALCULATED IN MULTIFICATION OF 1.5. THE WATER CURING WILL BE DEPENDED ON PARTY. THE PAYMENT WILL BE TAKEN PER WEEK FOR LABOUR EXPENSE. THE PAYMENT WILL BE TAKEN AS COMPLETION OF WORK. THE COLOUR WORK DOESN’T INCLUDE TEXTURE. THE WATER TANK RATE WILL BE CALCULATED AS PER LITRE. THE FLOORING WORK DOESN’T INCLUDE APOXY GROOW.