Column N Beam
Column N Beam
Material
Labour Tools &
s.no ACTIVITY Cost driver cost in
cost machiner
rupees
y
Shuttering/
1 Direct labour Hours
formwork
1.1 1000 1305 300
Assembling for column
1.2 Assembling for Beam 2130 5244 600
1.3 Removal - Column 1000 1305
1.4 Removal - Beam 2130 5244
Direct labour Hours +
2 Reinforcement
Direct material cost
For columns upto 1st
2.1 3923 1854 2700
floor
For columns upto 2nd
2.2 3923 1854 2700
floor
For columns upto
2.3 3923 1854 2700
Terrace
2.4 For beams at 1st floor 5066 2500 5700
2.5 5066 2500 5700
For beams at 2nd floor
For beams at roof
2.6 5066 2500 5700
beam
Direct labour Hours +
3 Concreting
Direct material cost
3.1 Preparation 3435 2482
For columns upto 1st
3.2 6021 1200 470
floor
For columns upto 2nd
3.3 6021 1200 470
floor
For columns upto
3.4 6021 1200 470
Terrace
3.5 For beams at 1st floor 13970 2800 1640
3.6 13970 2800 1640
For beams at 2nd floor
For beams at roof
3.7 13970 2800 1640
beam
4 Curing Direct labour Hours
4.1 Curing for columns 945 150
4.2 Curing for Beams 2100 300
###
COLUMN AND BEAM
LABOU
Material R
Rate in LABOUR
s.no ACTIVITY Unit Qty cost in RATES
figures REQUIRED
In
rupees
rupees
Shuttering/
1
formwork
Assembling for 1. Carpenter 500
1.1 cu.m 6.66 1000
column 2. Mazdoor 320
1. Carpenter 500
1.3 Removal - Column cu.m 6.66 1000 2. Mazdoor 320
1. Carpenter 500
1.4 Removal - Beam sq.m 47.4 2130 2. Mazdoor 320
2 Reinforcement
3 Concreting
1. Mazdoor
250
2. Bhisti
200
3.1 Preparation Cu.m 22.41 3. Mixer
350
operator
330
4. Mixer
1. Mazdoor 250
For columns upto 2. Bhisti 200
3.2 Cu.m 2.25 2676/cu.m 6021
1st floor 3. Mason 350
4. Vibrator 350
1. Mazdoor 250
For columns upto 2. Bhisti 200
3.3 Cu.m 2.25 2676/cu.m 6021
2nd floor 3. Mason 350
4. Vibrator 350
1. Mazdoor 250
For columns upto 2. Bhisti 200
3.4
Terrace
Cu.m 2.25 2676/cu.m 6021 3. Mason 350
4. Vibrator 350
1. Mazdoor 250
For beams at 1st 2. Bhisti 200
3.5 Cu.m 5.22 2676/cu.m 13970
floor 3. Mason 350
4. Vibrator 350
1. Mazdoor 250
For beams at 2nd 2. Bhisti 200
3.6 Cu.m 5.22 2676/cu.m 13970
floor 3. Mason 350
4. Vibrator 350
1. Mazdoor 250
For beams at roof 2. Bhisti 200
3.7 Cu.m 5.22 2676/cu.m 13970
beam 3. Mason 350
4. Vibrator 350
4 Curing
1. Mazdoor 250
4.1 Curing for columns Cu.m 6.7 2. Bhisti 200
3. Mason 350
1. Mazdoor 250
4.2 Curing for Beams Cu.m 15.6 2. Bhisti 200
3. Mason 350
2 cu.m/ person 1
5 cu.m 6.66/5= 1.33 days 1305
2 cu.m/ person 2
10 sq.m/ person 2
60 sq.m142.3/60= 2.3 days 5244
10 sq.m/ person 4
Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1
Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1
Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1
Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1
Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1
Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1
2 cu.m/ person 3
1 cu.m/person 1 Wheel barrow - 2
15 cu.m22.41/15= 1.5 days 3435
2 cu.m/ person 1 Headpan- 2
2 cu.m/person 3
2 cu.m/ person 2
1 cu.m/ person 1 7 cu.m 6.7/7= 0.9 days 945 Water hose -2
2 cu.m/person 1
2 cu.m/ person 2
1 cu.m/ person 1 7 cu.m 15.6/7= 2 days 2100 Water hose -2
2 cu.m/person 1
29 days 44640
OVERHEAD COSTS
300 300
600 600
Automatic Rebar
Tying Equipment
2000 -1 700 2700 85
Welding machine
-1
Automatic Rebar
Tying Equipment
2000 -1 700 2700 85 3295
Welding machine
-1
Automatic Rebar
Tying Equipment
2000 -1 700 2700 85
Welding machine
-1
Automatic Rebar
Tying Equipment
4800 -2 900 5700 140
Welding machine
-1
Automatic Rebar
Tying Equipment
4800 -2 900 5700 140 4255
Welding machine
-1
Automatic Rebar
Tying Equipment
4800 -2 900 5700 140
Welding machine
-1
Concrete mixer
232 2250 2482 300 100
-2
3200
5800
5800
2000
800 100