BILL OF QUANTITY (BOQ) FOR PROPOSED SERVICE STATION

FUEL STATION

No. Item Description Quantity

B FUEL STATION
I PREPARATION WORK
1 Mobilization & Demobilization 1.00
2 Temporary site office 1.00
3 Temporary Electricity & water supply during construction 1.00
4 New Installation and/or power upgrading (40KVA) 1.00
5 Temporary fence 1.00
6 Safety Facilities 1.00
7 Site Security Staff 1.00
Sub Total I

II UNDERGROUND TANKs
1 Ground Excavation for Underground tank 93.00
2 Backfilling work 35.00
4 Bundwall Brickwork 230mm 52.20

1
BILL OF QUANTITY (BOQ) FOR PROPOSED SERVICE STATION

FUEL STATION

No. Item Description Quantity

5 Reinforcement concrete for ground slab, grade25 and 20 cm thickness 5.20


6 Reinforcement Concrete for upper slab, grade25 and 10 cm Thickness (wire mesh) 5.20
7 load, haul, dump,spread, water and compact to 96% H.C.E 1 base layer of 15cm thickness 22.00
8 Backfilling work for underground tanks 82.60

Sub Total I

III Err:509
1 Excavation for Foundation 32.00
2 50mm footing concrete blinding 0.80
3 reinforced concrete column footing and stub column 9.20
4 Supply & Installation of Roof Sheeting 141.12
5 Supply & Installation of 300x380x10 Perimeter Gutter/Facia 50.80
7 Supply & Installation of 200x200x8mm S355 steel for Stanchions 20.46
8 Supply & Installation of 300x200mm hollow section Steel for Beam 20.80
9 Supply & Installation of Truss structure RHS 50x50mm 126.00

2
BILL OF QUANTITY (BOQ) FOR PROPOSED SERVICE STATION

FUEL STATION

No. Item Description Quantity

10 Supply & Installation of 150x50x5mm CFLC purlin 159.00


11 Supply & Installation of Angle Irons 108.00
13 Roof Accessories (Trekstang, anchor bolt, stiffener, etc) 1.00
14 Backfilling work 7.00
15 Concrete slab for Canopy Area, t=20 cm 22.00
16 Permanent Pump 150mm thick Concrete Pliths 10.00
18 25x25mm Chamfer 27.60
Sub Total II

3
OR PROPOSED SERVICE STATION

Unit Price (US Total Amount


Unit
$) (US $)

LS $ 3,675.00 $ 3,675.00
LS $ 1,070.00 $ 1,070.00
LS $ 1,520.00 $ 1,520.00
LS $ 1,865.00 $ 1,865.00
LS $ 800.00 $ 800.00
LS $ 2,500.00 $ 2,500.00
LS $ 850.00 $ 850.00
$ 12,280.00

Cu.m $ 5.75 $ 534.75


Cu.m $ 575.00 $ 20,125.00
Sqm $ 48.68 $ 2,541.10

4
OR PROPOSED SERVICE STATION

Unit Price (US Total Amount


Unit
$) (US $)

Cu.m $ 280.15 $ 1,456.78


Cu.m $ 280.15 $ 1,456.78
Cu.m $ 18.80 $ 413.60
Cu.m $ 4.00 $ 330.42

$ 26,858.42

Cu.m $ 5.75 $ 184.00


Cu.m $ 280.15 $ 224.12
Cu.m $ 280.15 $ 2,577.38
Sq.m $ 25.00 $ 3,528.00
Sq.m $ 25.00 $ 1,270.00
m' $ 45.50 $ 930.93
m' $ 55.00 $ 1,144.00
m' $ 50.00 $ 6,300.00

5
OR PROPOSED SERVICE STATION

Unit Price (US Total Amount


Unit
$) (US $)

m' $ 4.50 $ 715.50


Sq.m $ 4.00 $ 432.00
LS $ 1,300.00 $ 1,300.00
Cu.m $ 5.00 $ 35.00
Cu.m $ 280.15 $ 6,163.30
Cu.m $ 280.15 $ 2,801.50
m' $ 8.75 $ 241.50
$ 27,847.23

6
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMO

SUMMARY

NO ITEM DESCRIPTION

I PREPARATION WORK

II UNDERGROUND TANKs

IV CANOPY

INCLUDING TAX

GRAND TOTAL (A+B+C)


OF QUANTITY (BOQ)
GASOIL STORAGE PROJECT IN TIMOR LESTE

SUMMARY

DESCRIPTION AMOUNT (US $)

$ 12,280.00

$ 26,858.42

$ 27,847.23

DING TAX

TAL (A+B+C) $ 66,985.65