Quotation For Gweru Service Statio
Quotation For Gweru Service Statio
Quotation For Gweru Service Statio
FUEL STATION
B FUEL STATION
I PREPARATION WORK
1 Mobilization & Demobilization 1.00
2 Temporary site office 1.00
3 Temporary Electricity & water supply during construction 1.00
4 New Installation and/or power upgrading (40KVA) 1.00
5 Temporary fence 1.00
6 Safety Facilities 1.00
7 Site Security Staff 1.00
Sub Total I
II UNDERGROUND TANKs
1 Ground Excavation for Underground tank 93.00
2 Backfilling work 35.00
4 Bundwall Brickwork 230mm 52.20
1
BILL OF QUANTITY (BOQ) FOR PROPOSED SERVICE STATION
FUEL STATION
Sub Total I
III Err:509
1 Excavation for Foundation 32.00
2 50mm footing concrete blinding 0.80
3 reinforced concrete column footing and stub column 9.20
4 Supply & Installation of Roof Sheeting 141.12
5 Supply & Installation of 300x380x10 Perimeter Gutter/Facia 50.80
7 Supply & Installation of 200x200x8mm S355 steel for Stanchions 20.46
8 Supply & Installation of 300x200mm hollow section Steel for Beam 20.80
9 Supply & Installation of Truss structure RHS 50x50mm 126.00
2
BILL OF QUANTITY (BOQ) FOR PROPOSED SERVICE STATION
FUEL STATION
3
OR PROPOSED SERVICE STATION
LS $ 3,675.00 $ 3,675.00
LS $ 1,070.00 $ 1,070.00
LS $ 1,520.00 $ 1,520.00
LS $ 1,865.00 $ 1,865.00
LS $ 800.00 $ 800.00
LS $ 2,500.00 $ 2,500.00
LS $ 850.00 $ 850.00
$ 12,280.00
4
OR PROPOSED SERVICE STATION
$ 26,858.42
5
OR PROPOSED SERVICE STATION
6
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMO
SUMMARY
NO ITEM DESCRIPTION
I PREPARATION WORK
II UNDERGROUND TANKs
IV CANOPY
INCLUDING TAX
SUMMARY
$ 12,280.00
$ 26,858.42
$ 27,847.23
DING TAX