Test Report of 11.

5 KV Panel at 132 kv Grid Station Sitara


Chemical Industry, Faisalabad

High Pot Test of 11KV Vacuum C.B Applied Voltage= 18 KV.DC


Test Mode R (uA) Y(uA) B(uA)
Up side VCB to G 5.00 5.00 6.00
Down side VCB to G 5.00 5.00 5.00

High Pot Test of 11KV Bus Bar Applied Voltage = 18KV. DC


Phase Applied Voltage DC L/Current (uA)
R 18 KV 0.8
Y 0.7
B 0.7

Contact Resistance test of 11KV C.B


C.B Phase Applied Current Resistance
( O/G ) R 100A 23.6
Y 27.5
B 24.8

11 KV Circuit Breaker Opening Time Test

Pole Opening Time (ms) Closing Time (ms)


Red 36.3 68.2
Yellow 37.4 69.2
Blue 36.5 69.8
CT Ratio Test of 11KV Panels:
Connected CT Applied R Measured Y Measured B Measured
Ratio Current Current (A) Current (A) Current (A)
(A)
600/5 40 0.33 0.33 0.33
80 0.66 0.66 0.66

PT Ratio Test of 11KV Panels:


Connected CT Applied R Measured Y Measured B Measured
Ratio Voltage Voltage Voltage Voltage
(V) (V) (V) (V)
11500/110 243 2.32 2.33 2.33

1. CT and PT Circuit checked and found OK for all panels. 


2. Trip through Over Current Relay checked and found OK for panels. 