BIDDING
RESPONSIBLE PROCESSING TIME
ACTIVITIES PROCESS FLOW
PERSON (per request)
BAC Secretariat (AO 1. Prepare Invitation to Bid (ITB) and Bidding ITB/Bid Docs Preparation
III) Documents (Bid Docs) 1 day
BAC Secretariat 4. Post the ITB and Bid Docs Posting of ITB/Bid Docs 22 calendar days
(AO III )
BAC/TWG 5. Open, evaluate and post-qualify the bid Bid Opening, Evaluation and
proposals 10 days
Post-qualification
BAC Sec (AO III and 9. Prepare BAC Resolution, Notice of Award and Prepare BAC Resolution,
1 day
CAO) Abstract of Bids NOA and Abstract of Bids
BAC and HOPE 10. Sign BAC Resolution, NOA and Abstract of Bids Sign BAC Resolution, NOA
2 days
and Abstract
BAC Secretariat 13. Forward the contract to provider/supplier and Forward contract to
(AO III) supplier return the notarized and signed supplier for signature and 1 day
contract notarization
CAO 14. Prepare the Notice to Proceed (NTP) Prepare NTP 3 days