Calculation Sheet
Job Title : Projek Pembinaan Pejabat Perhilitan Negeri Member/Location :
Pahang Di Bandar Indera Mahkota, Mukim Kuala Kuantan,
Drg. Ref. : Earthworks Drawing
Daerah Kuantan Pahang Darul Makmur.
Made by : Date : 10/11/2016 Remark
Limitation in design
The 75th percentile 5-day storm event for Kuantan, Pahang Darul Makmur
As such 3-months storm event is considered in the design.
Assumptions
2 Overland sheet flow to the temporary drain will flow to the trap directly.
Table 39.6 Refer to Table 39.6 : Wet Sediment Trap Sizing Guidelines,
Vol. 15
Therefore :
3
The settling zone volume, V1 = 70 m /ha x 0.929 ha = 65.03 m3
3
Total volume = 105 m /ha x 0.929 ha = 97.545 m3
The required sediment storage zone volume is 1/3 the total volume or the difference
between the total volume and the settling zone volume.
3
V2 = 1/3 x Total Volume = 33 m or
3
V2 = Total vol. - settling zone vol. = 33 m
For a side slope z = 2 (H) : 1 (V), the dimensions at the top of the sediment storage zone are :
The required depth for the sediment storage zone, which must be at least 0.3m, can be
calculated from the following relationship :
2 3 2
V2 = Z Y2 - Z Y2 (W2 + L2) + Y2 (W2 L2)
which gives,
2 3 2
33 = ( 2 ) Y2 - ( 2 ) Y2 ( 21.7 ) + Y2 ( 80.947 )
3 2
= 4 Y2 - 43.328 Y2 + 80.947 Y2
3
For Y2 = 0.50 m , V2 = 30.1 m
3
For Y2 = 0.60 m , V2 = 33.8 m
3
For Y2 = 0.70 m , V2 = 36.8 m
Y2 = 0.700 > 0.300 m minimum storage zone depth requirement (Cl. 39.7.6)
3
V2 = 36.8 > 33 m of sediment storage volume o.k.
1/3
Eqn. 14.1 to = 107 n L
1/2
S
Eqn. 14.2(a) ttotal = tA(LA) + tB(LA + LB) - tB(LA)
tA = 25.9 minutes
The weir crest must be designed for a 10 ARI flood when the trap is already full.
The sill is set at the trap top water level.
Rainfall
t (min) a b c d ln(I) Pd (mm)
I,(mm/hr)
30 4.3754 0.9634 -0.3068 0.0198 4.882 131.9 66.0
60 4.3754 0.9634 -0.3068 0.0198 4.5358 93.3 93.3
120 4.3754 0.9634 -0.3068 0.0198 4.1284 62.1 124.2
180 4.3754 0.9634 -0.3068 0.0198 3.8776 48.3 144.9
360 4.3754 0.9634 -0.3068 0.0198 3.4545 31.6 189.8
PERUNDING NUSAJASA SDN BHD Job No. Sheet No. 5 Rev.
(CONSULTING ENGINEER * JURUTERA PERUNDING)
0
Calculation Sheet
Job Title : Projek Pembinaan Pejabat Perhilitan Negeri Member/Location : Emergency Spillway
Pahang Di Bandar Indera Mahkota, Mukim Kuala Kuantan,
Drg. Ref. : Earthworks Drawing
Daerah Kuantan Pahang Darul Makmur.
Made by : 0 Date : 10/11/2016 Remark
Time P I
Fd
(min) (mm) (mm/hr)
Runoff discharge for ARI 10-yrs, where to refer Design Chart 14.3, C = 0.82 (Category 3)
3
Eqn. 14.7 Q weir crest = Q10 = C.
10
I 20 . A = 0.34 m /s
360
The sill is set at the trap top water level.
where :
1.5
Eqn. 20.6 Q weir crest = C BCW B H
Q = Weir discharge (m3/sec)
C BCW = broad-crested weir coefficient
B = weir base width (m)
H = effective head above weir crest (m)
B = 1.50 m
H = 0.30 m
C BCW = 1.48 m (from Design Chart 20.1)
3 3
Q weir crest = 0.36 m /sec > Q10 = 0.34 m /sec o.k.
L1 = 17 m
L2 = 14 m
Weir Crest
Note:
All sketches shown herein are N.T.S
PERUNDING NUSAJASA SDN BHD Job No. Sheet No. 7 Rev.
(CONSULTING ENGINEER * JURUTERA PERUNDING)
0
Calculation Sheet
Job Title : Projek Pembinaan Pejabat Perhilitan Negeri Member/Location : Emergency Spillway
Pahang Di Bandar Indera Mahkota, Mukim Kuala Kuantan,
Drg. Ref. : Earthworks Drawing
Daerah Kuantan Pahang Darul Makmur.
Made by : 0 Date : 10/11/2016 Remark
Slope = 1 in 1
effective height
H = 0.40 m
2
Total Area , A = 0.32 m
Wetted Perimer, P = 1.53 m
R = 0.209
Gradient, S = 1/ 300
n = 0.02
3 3
Q = 0.485 m /sec > Q10 = 0.34 m /sec o.k.