Date: 14 August 2019

Daily Report of Maintenance


No Activity Photo Activity

Project Modification House Chain Path From


The Reactor Area To The 500 MT STA Tank,
1
Now Work Is Stage Unloading And Installing H
Beam Iron For House Chain

Repair Of Chinme Boiler Stairs The


Installation Of Activated Carbon At The Top
2 Of Evaporator And Cleaning Evaporator,
Plan Is Tomorrow Morning There Will Be Air
Check From Baristan

Project For Adding Waste Water Tank Now


3 Work Is Stage Of The Wall Plaster At Outside
Part

Prepared By, Checked By, Approved By,

Bastian Marpaung Fahrul Rozi Mr. Anh


Drafter
Drafter
& Controller
& Controller
Maint. Factory Manager General Manager