ACTION PLAN FOR SOCIAL PROTECTION

JANUARY - DECEMBER 2015


Region: III Province: Bataan
Municipality: Orion Date: November 27, 2015
ACTIVITIES TIMEFRAME RESOURCES RESPONSIBLE EXPECTED RESULTS
NEEDED PERSON
1. Orientation on
Social Protection All Dept. Heads &
a. Municipal Level – January 2015 Activity Design MSWDO/ Elected Officials
All Municipal Dept. MLGOO/MPDO oriented with Social
Heads and Municipal Protection
Elected Officials and
accredited CSO Form No. 1 –
Identification of Risks
& Vulnerabilities

2. Creation of the
Municipal Social January 2015 Draft EO Hon. Antonio L. Executive Order
Protection Team Raymundo, Jr.
3. b. Barangay Level February 2015 Activity Design MSP TEAM All Punong Barangay,
– 4 clusters (PB, Secretary, Treasurer &
S,T, Kagawad, Kagawad & Partners
Partner CSO) CSO oriented on
Social Protection
Formation of BSPT
4. Planning for the
conduct of Family March 2015 MSPT Activity Design for the
Survey on Risks and Conduct of FSRV
Vulnerabilities
(FSRV) – including
training of
Enumerators
5. Conduct of the
Family Survey on April-May 2015 FSRV Forms MSPT Target HHs 100%
Risks and SPES Enumerated
Vulnerabilities Form BSPT
(FSRV)- 23
Barangays
6. Processing of the
FSRV using Family June 2015 FRV Template MSPT Processed FSRV
Risks & MSDWO/MPDO Staff Results
Vulnerabilities
Processing Template
(FRV Template)
7. Crafting of the SP June – July 2015 Primary & Secondary MSPT Situationer on MSP
Situationer in the data on SP Concerns
locality
8. Presentation of All concerned
the Result of the PowerPoint MSPT furnished with the copy
Survey – Municipal July 2015 Presentation of the of the result
Level including Result
Punong Barangays
9. Seminar on Module/Scheme on SP Concerns
Planning Personnel July 2015 How to mainstream MSPT mainstreamed in the
(Municipal & SP concerns to Local Local Plans
Barangay) Plans
10. Establish Local August 2015 Devised Forms MSPT Final List of Local
Performance Performance Indicators
Indicators on SP Initiatives
11. Conduct of
Monitoring – SP September 2015 Designated Personnel MSPT Monitoring Report
Initiatives Progress
in the locality
12. Conduct of December 2015 Evaluation Forms Duly Accomplished
Evaluation Post
Evaluation/Feedback
Forms