The meeting started at 2:00PM and presided by Engr. Jocelyn Hormillado and the following matters were
discussed and agreed upon:
ITEM MATTERS DISCUSSED RESPONSIBLE REMARKS
1.0 CLARIFICATIONS OF THE PREVIOUS MINUTES NO. 04 all Approved
2.0 ARCHITECTURAL CONCERNS
Mar-Ser asked UFO for the details of groove at front side. UFO to
2.1 UFO For mock up
coordinate it with the Consultant.
3.0 STRUCTURAL CONCERNS
Noted / Henry sent his
Mar-Ser informed UFO that Henry did not come at site last
3.1 UFO backhoe yesterday,
meeting and the latter said to contact him asap.
March 26, 2019
4.0 ELECTRICAL CONCERN
Mr. Montes queried the location of Lightning Arrester at Water
Will issue plans as per
4.1 Tank Level. UFO to verify it with the Consultant. (March 13, UFO
Consultant
2019)
5.0 PLUMBING CONCERNS
Consultant disapproved
DCR asked for the approved color of PPR. UFO to coordinate
5.1 DCR PPR with Crown Brand.
with the Consultant.
It should be polymutant
6.0 FIRE PROTECTION CONCERNS
Ramotech asked UFO for the lowest height elevation point per
6.1 Ramotech 2.40m
floor and UFO said to issue Elevation Plans.
7.0 ADJOURNMENT
There being no matters to be discussed the meeting was
7.1 Adjourned
adjourned at 3:00PM.

Transcribed by: Noted by:

ENGR. JOCELYN HORMILLADO MR. MICHAEL LIM


Project in Charge Managing Director

1
Proposed 4 Storey Commercial / Office Building
#60 Mauban St.,corner Igdalig St., Brgy. Manresa, Quezon City

You might also like