You are on page 1of 12

CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS (552 UNIT) 36 TINGKAT DI

ATAS LOT 2522, SEKSYEN 41, JALAN RAJA ABDULLAH / JALAN SULTAN ISMAIL, KUALA
LUMPUR
UNTUK TETUAN QUILL RETAIL MALLS SDN BHD.

TEMPORARY CONCRETE CASTING FORMWORK SUPPORT CALCULATION

1 Material used:
i) Plywood timber, 12mm (1200mm x 2400mm)
ii) Timber -Meranti Grade C
iii) Scaffolding HT Components

2 Safety Factor:
i) For temporary structure a Short Term, K1 = 1.5
i) For temporary structure a Long Term, K1 = 1.1 (MS 544 : Part 2)

3 Allowable stress for timber


(Grade C timber - >19% Moisture Content)
Allowable stress for timber:
fb = 62 kg/cm2 (Bending stress for grade C timber)
Allowable stress for temporary timber structure:
fb = 1.5 x 1.1 x 62 = 102 kg/cm2 (Bending stress x K1 x K2)

4 Modulus of Elasticity
E= 89600 kg/cm^2 (Mean Modulus of Elasticity)

5 Loading:
i)Concrete load = 2400 kg/m3
ii) Impact load = 75 kg/m2
iii) Live load = 75 kg/m2

6 Scaffolding Each Leg Allowable load = 1800 kg/support


(Actual capacity = 5 tons. Down graded for
unforseen workmanship / material quality)
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

SOFFIT OF SLAB ANALYSIS


LOADING:
Concrete thickness = 3000 mm
i)Concrete load = 7200 kg/m2
ii) Impact load = 75 kg/m2
iii) Live load = 75 kg/m2
TOTAL= 7350 kg/m2 or 0.735 kg/cm2

1. PLYWOOD 120cm x 240cm x 24 mm THK.

PYLWOOD SUPPORT SPACING = 15 CM

W= 0.735 x 120
88.2 kg/cm
Section Modulus:
Z = bh^2/6 = 115.2 cm3
Moment Initial:
I = bh^3/12= 138.24 cm4
Max. Moment of Plywood:
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

M = WL^2/8 = 2480.625 kgcm


Max. Bending Stress:
F= M/Z = 21.53 kg/cm2 OK!< 102.3

Deflection Check:
S = 5wL^4/384EI = 0.00 cm OK!< 0.045 cm (MS 544 : Part 2 - Deflection not exceed 0.003L or 14mm)
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

2. SECONDARY SUPPORTING MEMBER STRUCTURE: 2. SECONDARY SUPPORTING MEMBER STRUCTURE:


USING STEEL PIPE
TIMBER MEMBER: 10.0CM X 7.5CM SIZE 48.6mm dia. X 2.0mm thk. X
TIMBER MEMBER SPACING : 15 CM STEEL MEMBER SPACING : 15 CM
Supporting Timber Member Span = 45 CM Supporting Steel Member Span = 45 CM
W= 0.735 x 15 W= 0.735 x 15
11.025 kg/cm 11.025 kg/cm
Section Modulus: Section Modulus:
Z = bh^2/6 = 94 cm3 Z' = 6.48 cm3 Z= 3.24
Moment Initial: Moment Initial:
I = bh^3/12= 352 cm4 I' = 15.62 cm4 I= 7.81
Max. Moment of member: Max. Moment of member:
M = WL^2/8 = 2790.7031 kgcm M = WL^2/8 = 2790.703125 kgcm
Max. Bending Stress: Max. Bending Stress:
F= M/Z = 29.77 kg/cm2 OK!< 102.3 F= M/Z = 430.66 kg/cm2 OK!< 1900kg/cm2

Deflection Check: Deflection Check:


S = 5wL^4/384EI = 0.02 cm OK!< 0.135 cm S = 5wL^4/384EI = 0.02 cm OK!< 0.225
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

(MS 544 : Part 2 - Deflection not


exceed 0.003L or 14mm)
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

3. MAIN BEAM ON SCAFFOLDING SUPPORT:

TIMBER MEMBER: 10.0CM X 7.5CM X 1 NOS


MAIN BEAM SPACING = 45 CM
Supporting Timber Member Span = 45 CM
W= 0.735 x 45
33.075 kg/cm
Section Modulus:
Z = bh^2/6 = 94 cm3
Moment Initial:
I = bh^3/12= 352 cm4
Max. Moment of Plywood:
M = WL^2/8 = 8372.1094 kgcm
Max. Bending Stress:
F= M/Z = 89.30 kg/cm2 OK!< 102.3

Deflection Check:
S = 5wL^4/384EI = 0.06 cm OK!< 0.135 cm (MS 544 : Part 2 - Deflection not exceed 0.003L or 14mm)
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41 TINGKAT) YANG MENGANDUNGI :
i) 2 TINGKAT BASMEN TEMPAT LETAK KERETA,
ii) 3 UNIT LOT KOMERSIAL DI ARAS BAWAH,
iii) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DIARAS 1 HINGGA ARAS 5,
iv) 1 ARAS KEMUDAHAN DI ARAS 6,
v) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNIT) DI ARAS 7 HINGGA 40,
vi) 8 TINGKAT SUITE PEJABAT (75 UNIT) DI ARAS 7 HINGGA 14,
vii) SESEBUAH PENCAWANG ELEKTRIK (DALAM BANGUNAN)
DI ATAS LOT 2504 & LOT 50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR.
UNTUK TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN. BHD.

SCAFFOLDING LEG LOADING = 744 kg OK!< 1800


Therefore, SCAFFOLDING SPACING= 45 cm C/C
LUMPUR.
LUMPUR.

2NOS

cm3

cm4

1900kg/cm2

cm
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS (552 UNIT) 36 TINGKAT DI ATAS LOT 2522, SEKSYEN 41, JALAN RAJA
ABDULLAH / JALAN SULTAN ISMAIL, KUALA LUMPUR
UNTUK TETUAN QUILL RETAIL MALLS SDN BHD.

SOFFIT OF BEAM ANALYSIS


LOADING:
BEAM SIZE = 3000mm X 2000mm
i)Concrete load = 7200 kg/m2
ii) Impact load = 75 kg/m2
iii) Live load = 75 kg/m2
TOTAL= 7350 kg/m2 or 0.735 kg/cm2

1. PLYWOOD 120cm x 240cm x 12 mm THK.

PYLWOOD SUPPORT SPACING = 15 CM

W= 0.735 x 120
88.2 kg/cm
Section Modulus:
Z = bh^2/6 = 28.8 cm3
Moment Initial:
I = bh^3/12= 17.28 cm4
Max. Moment of Plywood:
M = WL^2/8 = 2480.625 kgcm
Max. Bending Stress:
F= M/Z = 86.13 kg/cm2 OK!< 102.3

Deflection Check:
S = 5wL^4/384EI = 0.04 cm OK!< 0.045 cm (MS 544 : Part 2 - Deflection not exceed 0.003L or 14mm)
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS (552 UNIT) 36 TINGKAT DI ATAS LOT 2522, SEKSYEN 41, JALAN RAJA
ABDULLAH / JALAN SULTAN ISMAIL, KUALA LUMPUR
UNTUK TETUAN QUILL RETAIL MALLS SDN BHD.

2. SECONDARY SUPPORTING MEMBER STRUCTURE: 2. SECONDARY SUPPORTING MEMBER STRUCTURE:


USING STEEL PIPE
TIMBER MEMBER: 5.0CM X 10.0CM X 1NOS SIZE 48.6mm dia. X 2.0mm thk. X 1NOS
TIMBER MEMBER SPACING : 15 CM STEEL MEMBER SPACING : 15 CM
Supporting Timber Member Span = 63 CM Supporting Steel Member Span = 63 CM
W= 0.735 x 15 W= 0.735 x 15
11.025 kg/cm 11.025 kg/cm
Section Modulus: Section Modulus:
Z = bh^2/6 = 83 cm3 Z' = 3.24 cm3 Z= 3.24 cm3
Moment Initial: Moment Initial:
I = bh^3/12= 417 cm4 I' = 7.81 cm4 I= 7.81 cm4
Max. Moment of Plywood: Max. Moment of member:
M = WL^2/8 = 5469.7781 kgcm M = WL^2/8 = 5469.778125 kgcm
Max. Bending Stress: Max. Bending Stress:
F= M/Z = 65.64 kg/cm2 OK!< 102.3 F= M/Z = 1688.20 kg/cm2 OK!< 1900kg/cm2

Deflection Check: Deflection Check:


S = 5wL^4/384EI = 0.06 cm OK!< 0.189 cm S = 5wL^4/384EI = 0.14 cm OK!< 0.315 cm
(MS 544 : Part 2 - Deflection not
exceed 0.003L or 14mm)
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS (552 UNIT) 36 TINGKAT DI ATAS LOT 2522, SEKSYEN 41, JALAN RAJA
ABDULLAH / JALAN SULTAN ISMAIL, KUALA LUMPUR
UNTUK TETUAN QUILL RETAIL MALLS SDN BHD.

3. MAIN BEAM ON SCAFFOLDING SUPPORT:

TIMBER MEMBER: 7.5CM X 10.0CM X 2 NOS


MAIN BEAM SPACING = 63 CM
Supporting Timber Member Span = 61.5 CM
P= 147 x 63
9261 kg
Section Modulus:
Z = bh^2/6 = 250 cm3
Moment Initial:
I = bh^3/12= 1250 cm4
Max. Moment of Plywood:
M = PL/4 = 142387.88 kgcm
Max. Bending Stress:
F= M/Z = 569.55 kg/cm2 Not OK!!!

Deflection Check:
S = PL^3/48EI = 0.40 cm NOT OK!> 0.1845 cm (MS 544 : Part 2 - Deflection not exceed 0.003L or 14mm)

SCAFFOLDING LEG LOADING = 4631 kg NOT OK! CHECK!


Therefore, SCAFFOLDING SPACING= CHECK! cm C/C