Total unit cost as per prevailing CSR 2018-19
352963.55
including all turnkey parameters
We declare that in terms of Clause 13.0, Section ITB, Volume- I of Bid Documents, the following are our
total bid price in Indian Rupees for the entire scope of work as specified in the Specifications and
documents.
Note:- If the %age is less than the Total unit cost, then it must be prefixed with the minus symbol. For
example:- If the quoted price is 5% below the Total unit cost, then -5 shall be entered in the cell provided
for that purpose.
Date : Signature
Designation
Company seal
Schedule – 2
Mangalore Electricity Supply Company Limited
Drawing & Commissioning of 11 kV Lines Installing & Commissioning of DTCs with associated HT LT link lines
Drawing & Commissioning of LT 3-phase lines and Reconductoring of HT LT lines on partial turnkey basis under Rat
contract for a period of one year in CSD-3 O&M Sub-division of Shimoga O&M Division.
Construction of single circuit 11 kV line using Rabbit ACSR Conductor on 8/9 Mtr
1 8321.22
RCC/PSC poles - Supply portion
Construction of single circuit 11 kV line using Rabbit ACSR Conductor on 8/9 Mtr
2 54829.17
RCC/PSC poles - Erection portion
Construction of single circuit 3 phase 4 wire line using Rabbit ACSR Conductor -
7 2651.19
Supply portion
Construction of single circuit 3 phase 4 wire line using Rabbit ACSR Conductor -
8 53681.94
Erection portion
Re conductoring of 3 phase 400 V line using Rabbit ACSR for single circuit, including
11 571.68
returning of released conductor and other materials - Supply portion
Re conductoring of 3 phase 400 V line using Rabbit ACSR for single circuit, including
12 27786.78
returning of released conductor and other materials - Erection portion
13 Supply of Extra Materials which are not included in the above schedules 32294.12
14 Erection of Extra Materials which are not included in the above schedules 5383.37
Total Unit Cost as
per prevailing CSR
Sl. 2018-19 including
Particulars
No. all turnkey
parameters
(In Rs.)
Total Quoted Unit Bid Price inclusive of all applicable taxes, duties, levies, F&I charges
etc.,
352963.55
We declare that in terms of Clause 13.0, Section ITB, Volume- I of Bid Documents, the following are our total bid price in Indian Rupees for the entire scope of work a
specified in the Specifications and documents.
Date: Signature
Place: Printed Name
Designation
Company seal
ed HT LT link lines
rnkey basis under Rate
Division.
Supply of Materials
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for supply of all materials
Insurance
Unit Price as Transportation @ Watch and
Sl. against theft
Description of materials Unit Qty per prevailing
2% on material
Ward @ 1% on
and accident 1%
No CSR 2018-19 material
on material
Page 9 of 56
Insurance
Unit Price as Transportation @ Watch and
Sl. against theft
Description of materials Unit Qty per prevailing
2% on material
Ward @ 1% on
and accident 1%
No CSR 2018-19 material
on material
Guy concreting with Boulders, Mud & Sand As per Drawing No.
10 No. 1 174.00 3.48 1.74 1.74
BESCOM/GM/CP/7/dt: 24.10.07. (with out cement)
11 Caution / Danger Board No. 1 146.00 2.92 1.46 1.46
Page 10 of 56
Insurance
Unit Price as Transportation @ Watch and
Sl. against theft
Description of materials Unit Qty per prevailing
2% on material
Ward @ 1% on
and accident 1%
No CSR 2018-19 material
on material
Date Signature
Place Printed Name
Designation
Company seal
Page 11 of 56
tr RCC/PSC poles
Quoted Unit
FORD Price
(Inclusive of all
Contingencies @ PG @ 2.5% on
2% on material
Total
BG
applicable
taxes, duties,
F&I charges)
11=5+6+7+ 12=2.5%(10%
9=2%*5 15=13+(13x14)
8+9 *11)
Page 12 of 56
Quoted Unit
FORD Price
(Inclusive of all
Contingencies @ PG @ 2.5% on
2% on material
Total
BG
applicable
taxes, duties,
F&I charges)
11=5+6+7+ 12=2.5%(10%
9=2%*5 15=13+(13x14)
8+9 *11)
Page 13 of 56
Quoted Unit
FORD Price
(Inclusive of all
Contingencies @ PG @ 2.5% on
2% on material
Total
BG
applicable
taxes, duties,
F&I charges)
11=5+6+7+ 12=2.5%(10%
9=2%*5 15=13+(13x14)
8+9 *11)
Page 14 of 56
Schedule - 3B
Mangalore Electricity Supply Company Limited
Construction of single circuit 11 kV line using Rabbit ACSR Conductor on 8/9 Mtr RCC/PSC
poles
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for erection of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Page 15 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
2 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for RCC Poles Set 1
3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSC Poles Set 1
Page 16 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Loading and unloading of poles (loading of poles to vehicles at 9Mtr RCC/PSC No. 1
13 stores and unloading at workspot) NOTE:- Consolidated amount for
both loading and unloading. 8Mtr RCC/PSC No. 1
Page 17 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Date
Place
Page 18 of 56
Schedule -4A
Mangalore Electricity Supply Company Limited
Erection of 25 KVA 4/5 star rated Distribution Transformer
Supply of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Bidder's Name and Address: To,
Superintending
Engineer Ele (Ele).,
O&M Circle,
MESCOM
Shimoga FAX NO.
225546
08182 225544
Email:
seesmg_mescom@r
ediffmail.com
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for supply of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Page 19 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Single
Earthing materials pipe type for grounding as per
Electrode
3 Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 1
with
24.10.07
accessories
4 Caution / Danger Board No 1
Page 20 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
9
Fish Plate with necessary Clamps, bolts & nuts etc complete
No. 1
(Galvanised)
Date
Place
Page 21 of 56
Schedule - 4B
Mangalore Electricity Supply Company Limited
Erection of 25 KVA 4/5 star rated Distribution Transformer
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Sl.
Description of materials Unit Qty
No
1 2 3 4
1 2 3 4
Guy sets complete using Turn buckle, Guy wire and No. 15 guy
2 Hard Soil Set 1
strain insulators, Anchor rods etc
Hard Laterite Soil Set 1
11kV/433V, 25KVA, 3 Phase, 50 Cys Distribution
3 Set 1
Transformer BEE-4/5 Star Rated with Oil
Set/ 3
9 HG Fuse, 11 kV Solid Core Type ( 3Nos) 1
nos
10 GOS 11kV 200 A single break, Horizontal operation (inclusive of H-frame & accessories) set 1
Loading and unloading of poles (loading of poles to vehicles at 9Mtr RCC/PSC No. 1
12 stores and unloading at workspot) NOTE:- Consolidated amount
for both loading and unloading. 8Mtr RCC/PSC No. 1
Page 23 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Date
Place
Page 24 of 56
Schedule -5A
Mangalore Electricity Supply Company Limited
Erection of 4/5 63 KVA Distribution Transformer
Supply of Materials
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19
for supply of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Page 25 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Guy sets complete using Turn buckle, Guy wire and No. 15 guy
2 No 1
strain insulators, Anchor rods etc
9
Page 26 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
9 Fish Plate with necessary Clamps, bolts & nuts etc complete
No. 1
(Galvanised)
Date
Place
Page 27 of 56
Schedule - 5B
Mangalore Electricity Supply Company Limited
Erection of 4/5 63 KVA Distribution Transformer
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for erection of all
materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
1 2 3 4
Guy sets complete using Turn buckle, Guy wire and No. 15 guy
2 Hard Soil Set 1
strain insulators, Anchor rods etc
Hard Laterite Soil Set 1
3 11 kV/433 V 3 phase 50 Cys Distribution Transformer with oil Off Load Tap changer Set 1
Set/
9 HG Fuse, 11 kV Solid Core Type ( 3Nos) 1
3 nos
GOS 11kV 200 A single break, Horizontal operation (inclusive of H-frame &
10 set 1
accessories)
Loading and unloading of poles (loading of poles to vehicles at 9Mtr RCC/PSC No. 1
12 stores and unloading at workspot) NOTE:- Consolidated amount
for both loading and unloading.
Page 29 of 56
Sl.
Description of materials Unit Qty
No
Date
Place
Page 30 of 56
Schedule -6A
Mangalore Electricity Supply Company Limited
Construction of single circuit 3 phase 4 wire line using Rabbit ACSR Conductor
Supply of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR
2018-19 for supply of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
L.T.4 Pin cross arms, with pole clamps, bolts, nuts and
1 Set 1
washers for RCC Poles MS
Page 31 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
L.T.4 Pin cross arms, with pole clamps, bolts, nuts and
2 Set 1
washers for PSC Poles MS
Tot
Date
Place
Page 32 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Page 33 of 56
Schedule - 6B
Mangalore Electricity Supply Company Limited
Construction of single circuit 3 phase 4 wire line using Rabbit ACSR Conductor
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for erection of all
materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
1 2 3 4
2 L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers for RCC Poles MS Set 1
2 L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers for PSC Poles MS Set 1
Rabbit kms 1
4 ACSR Conductor
Weasel kms 1
Page 35 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
7 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers set 1
Loading and unloading of poles (loading of poles to vehicles at 9Mtr RCC/PSC No. 1
8 stores and unloading at workspot) NOTE:- Consolidated amount
for both loading and unloading. 8Mtr RCC/PSC No. 1
Date
Place
Page 36 of 56
Schedule -7A
Mangalore Electricity Supply Company Limited
Re conductoring of 11 kV Line using Rabbit ACSR for single
circuit, including returning of released conductor and other
materials
Supply of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing
CSR 2018-19 for supply of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Page 37 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Date
Place
Page 38 of 56
Schedule - 7B
Mangalore Electricity Supply Company Limited
Re conductoring of 11 kV Line using Rabbit ACSR for single circuit, including returning of
released conductor and other materials
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for erection of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Ordinary Soil No 1
1 2 3 4
Page 40 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Ordinary Soil No 1
Loading and unloading of poles (loading of poles to vehicles at 9Mtr RCC/ PSC No. 1
5 stores and unloading at workspot) NOTE:- Consolidated amount
for both loading and unloading. 8Mtr RCC/ PSC No. 1
Date
Place
Page 41 of 56
Schedule -8A
Mangalore Electricity Supply Company Limited
Re conductoring of 3 phase 400 V line using Rabbit ACSR for
single circuit, including returning of released conductor and other
materials
Supply of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR
2018-19 for supply of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
4 Pin cross arm with pole clamp, bolt & Nuts for RCC
1 No 1
Poles MS
4 Pin cross arm with pole clamp, bolt & Nuts for PSC
2 No 1
Poles MS
Page 42 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Date
Place
Page 43 of 56
Schedule - 8B
Mangalore Electricity Supply Company Limited
Re conductoring of 3 phase 400 V line using Rabbit ACSR for single circuit,
including returning of released conductor and other materials
Erection of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 2018-19 for erection
of all materials
Sl.
Description of materials Unit Qty
No
1 2 3 4
Ordinary Soil No 1
1 2 3 4
Ordinary Soil No 1
Date
Page 45 of 56
Sl.
Description of materials Unit Qty
No
1 2 3 4
Place
Page 46 of 56
Schedule -9A
Mangalore Electricity Supply Company Limited
Materials not included in previous schedules
Supply of Materials
Bid Enquiry No. MESCOM/2019-20/EL/WORK_INDENT1324
Bidder's Name
To,
and Address:
Superintending Engineer Ele (Ele)
O&M Circle, MESCOM
Shimoga
TEL. NO. 08182 225546 FAX NO.
Email: seesmg_mescom@rediffmai
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 20
Sl.
Description of materials Unit Qty
No
1 2 3 4
1 Horizontal cross arms without HTST support for RCC poles Set 1
2 Horizontal cross arms without HTST support for PSC poles Set 1
11kV DOLO Cutouts Conventional to Erstwhile KEB
Set /3
3 Specification (Dwg No. BESCOM/GM/QS&S/20 Dtd 1
Nos
24.11.2018)
HT Single Top Support Set with Bolts Nut and Washers
4 Set 1
Concreting materials
5 2 - Pin Cross Arms Set - For RCC Poles without Braces - MS Set 1
6 2 - Pin Cross Arms Set - For PSC Poles without Braces - MS Set 1
LT Single Top Support Set with Bolts Nut and Washers
7 Set 1
Concreting materials
9 Guarding Materials above 40 mtrs span Mtr 1
10 PG Clamps for - Weasel to Weasel No. 1
11 LT 2 Pin X Arms - MS No. 1
12 LT 4 Pin X Arms - MS No. 1
13 RCC Pole Clamp - MS No. 1
14 PSC Pole Clamp - MS No. 1
Date
Place
ntending Engineer Ele (Ele).,
Circle, MESCOM
Quoted
Unit
FORD
Price
Unit Price Insurance (Inclusive
as per Transportation Watch and against theft Contingencies PG @
of all
prevailing @ 2% on Ward @ 1% and @ 2% on Total 2.5% on
material on material accident 1% material BG applicable
CSR 2018-
19 on material taxes,
duties,
F&I
charges)
12=10+(10
x11)
Quoted %age above/ below the Total Unit Cost as per prevailing CSR 201
Unit Price
Sl. as per
Description of materials Unit Qty prevailing
No
CSR 2018-
19
1 2 3 4 5
Quoted
unit price
Special Contribution for
locality Total towards ESI PG @
Contingencies erection
allowance2 Labour and PF @ Total GST 2.5% on
@ 2% Labour including
5% on cost 16.25% On BG
Labour Labour all taxes
and
duties
Drawing & Commissioning of 11 kV Lines Installing & Commissioning of DTCs with associated HT LT
link lines Drawing & Commissioning of LT 3-phase lines and Reconductoring of HT LT lines on partial
turnkey basis under Rate contract for a period of one year in CSD-3 O&M Sub-division of Shimoga
O&M Division.
We declare that the following Materials / Equipments in our scope of supply (including bought out items) are
sourced from outside the State of Karnataka
Indicate whether
Value of Material /
Sl. No. Description of Materials / Equipments boughtout item or own
Equipment
manufactured item.
Total
Date Signature
Designation
Company seal