Madre & Ecoka
Madre & Ecoka
Manpower
Engineer: 3 (2 civil, 1 plumber)
Worker: 15 (5 painters & 10 masonry)
Cost
Higher price and ensure completion of work in time
Experience
2 Petrol station
Rebranding of a filling station total to Engen 2010 (Pretty satisfaction of the client)
1 4 flour building (residential)
1 3 flour building (residential)
Capacity
Painting & cleaning: 2-3 weeks.
o To provide paints specs from manufacturer
Number of sites to work simultaneously: 4 site max. without credit problems
o 3 weeks to complete 3 sites.
6 months depending on the site
o Quality of wall (humidity, materials, cracks).
Civil Engineering and Mill Services CEMS
Name: Francois Bikurimana (Managing director)
Introduction
Civil section as from 2011
Manpower
1 accountant
1 civil engineer
1 electrical engineer
3 technic
3
Experience at Engen
Rehabilitation of filling station
o Painting, ground (tarmac) 2015
Rehabilitation of main office (Poids Lourd) pretty satisfaction of client
Capacity
Cleaning & painting
o (capacity to work at night 1 week)
Number of sites: 3 sites simultaneously
o Same area
o Advance payment
o 1 week notification requirement for credits bank
3 years quality of paint
MK Paint Company
Christian Rudasingwa Managing director
Manpower
1 civil engineer
1 land surveyor
4 workers (2 construction civil, 2 paints)
Experience
Nyagatere
o Paint work
Install prime sign, repair and refurbish
Capacity
o Cleaning & painting: 2 weeks.
o 2 sites simultaneously
o Guaranty: 3 years before paint changing color and degradation
o
Madre
Aimab (electrician) 2014
Manpower
o 3 Electrician
o 1 consultant engineer electrical on deep analysis work only
Capacity
o LED light replacement: 1 day
o No of sites simultaneously:3 sites
Safety knowledge
o Basic to limited knowlegde