ECOKA

Manpower
 Engineer: 3 (2 civil, 1 plumber)
 Worker: 15 (5 painters & 10 masonry)
Cost
 Higher price and ensure completion of work in time
Experience
 2 Petrol station
 Rebranding of a filling station total to Engen 2010 (Pretty satisfaction of the client)
 1 4 flour building (residential)
 1 3 flour building (residential)
Capacity
 Painting & cleaning: 2-3 weeks.
o To provide paints specs from manufacturer
 Number of sites to work simultaneously: 4 site max. without credit problems
o 3 weeks to complete 3 sites.
 6 months depending on the site
o Quality of wall (humidity, materials, cracks).
Civil Engineering and Mill Services CEMS
Name: Francois Bikurimana (Managing director)
Introduction
Civil section as from 2011
Manpower
 1 accountant
 1 civil engineer
 1 electrical engineer
 3 technic
 3
Experience at Engen
 Rehabilitation of filling station
o Painting, ground (tarmac) 2015
 Rehabilitation of main office (Poids Lourd) pretty satisfaction of client
Capacity
 Cleaning & painting
o (capacity to work at night 1 week)
 Number of sites: 3 sites simultaneously
o Same area
o Advance payment
o 1 week notification requirement for credits bank
 3 years quality of paint

MK Paint Company
Christian Rudasingwa Managing director
Manpower
 1 civil engineer
 1 land surveyor
 4 workers (2 construction civil, 2 paints)
Experience
 Nyagatere
o Paint work
 Install prime sign, repair and refurbish
Capacity
o Cleaning & painting: 2 weeks.
o 2 sites simultaneously
o Guaranty: 3 years before paint changing color and degradation
o

Madre
Aimab (electrician) 2014
Manpower
o 3 Electrician
o 1 consultant engineer electrical on deep analysis work only
Capacity
o LED light replacement: 1 day
o No of sites simultaneously:3 sites
Safety knowledge
o Basic to limited knowlegde

Tron Mill Service (interesting)


Civil contractor Yves Bizumuremye
Manpower:
o 3 engineers (1 electrical & 2 civil)
o In case can hire/subcontract expat.
o
Operation
o Construction & maintenance
Experience
o Toilet facility at Engen filling station
Capacity
o Cleaning & painting 2 weeks.
o 3 to 5 station simultaneously
o 3 years warranty
o Experience in thickness colour painting.
Safety
o Basic to limited knowledge in safety (mentioned PPE, no smoking, rent lifting machine)
2012
Engen
2years refurbishment

You might also like