You are on page 1of 1

Date: 25th Nov’ 2019

To,
The Director,
Engineering Maintenance Department
Nepal Airlines Corporation

Sub: MA-60 (9N-AKQ) Propeller Balancing Report

Dear Sir,

With reference to your request letter Ref# MDE/Buddha/447/2019 dated 20 th Nov’ 2019,
Propeller Dynamic Balancing of Both Engine Propeller carried out with our Propeller Balancing
Kit (Dynamic Solutions System). Engine Run to support balancing done by your designated
AME’s. They are also familiarized on the Propeller Balancing task.

Following Findings and correction done as detailed below:

1. 24 Nov’2019 - LH Engine propeller (15:30 to 20:00 Hrs.)


Initial reading/ findings : 0.567 IPS at 344.1 Deg.
Final reading/ correction : 0.052 IPS at 9.6 Deg.

2. 25 Nov’2019 - RH Engine propeller (11:30 to 15:00 Hrs.)


Initial reading/ findings : 0.499 IPS at 215.8 Deg.
Final reading/ correction : 0.156 IPS at 213.5 Deg.

Tools/ Equipment Used:


Name : Micro Vib II
Part No. : 1300
Serial No. : 1125
Calibration Due on : 09 Mar’ 2020

Best Regards,

________________
R. N. Chaudhary
Auth. # BA 233

You might also like