PROJECT BOOK
This project book is an initial one, if there is any change of the project, both two parties
should base on the final modification of the technical articles and commercial articles.
FROM :
Contact Name: MR. ARON FAN
Company: ZHANGJIAGANG GOLDEN MACHINERY CO.,LTD
Address: ZHAOFENG INDUSTRAIL DEVELOPMENT ZONE,ZHANGJIAGANG CITY
Country/Region: CHINA
Business Email: aron@goldenmachinerygroup.com
Telephone: +86-512-5672-7061/5597-0112
Fax: +86-512-5672-7905
Mobile: +86-136-1624-3401/189-2195-2898
OFFER INFO. :
SUBJECT : COMPLETE CARBONATED SOFT DRINK PRODUCTION LINE
PAYMENT : 30% OF THE TOTAL AMOUNT DOWN PAYMENT BY T/T,
THE BALANCE 70% BEFORE SHIPMENT BY T/T .
DELIVERY: 40DAYS
VALIDITY: 1 MONTH
OFFER NO.: GM20190910
DATE: 2019-09-10
I. Company introduction
Golden Machinery Group is seated in the Yangtze River—Zhangjiagang Economic
Development Zone, owns a 20,000 m² international standard workshop, GOLDEN
MACHINERY professionally researches, develops and manufactures beverage-packaging
machines. GOLDEN MACHINERY is a deputy president of China FPMA, High technology
enterprise of Jiangsu Province, and best supplier of China beverage packaging machinery
area.
Since its founding around 20 years ago. We are dedicated to the most advancement
technology of beverage packaging machinery, and have always been conducting good up-
to-date technical communication and exchange with leading Italy, Germany, France
packaging companies. We manufactured the PET bottle unscrambler, three-in-one mono-
block water filling machine and hot filling machine. Some technology has filled Chinese gap,
now we got more than 30 items patent. For example, PET bottle ESL filling
Group member
Zhangjiagang Golden Machinery Co., Ltd. --> adopts technology from German to
manufacture beverage packaging product line, aseptic filling equipment for paper tetra
pack and brick type.
Machinery
International service office: Bangkok, Accra;
Quality control
We got the ISO9000 quality certification several years ago. Recently, we got the
ISO9000:2000 quality certificate and CE certificate. Good quality system makes our
product quality at the high level.
Sugar
Drink Syrup Mixing Syrup
melting
mixer cooler tank filter
tank
SPECIFICATION
2T/H Water Treatment System
System Product name Model Production Unit price Qty Total
name capacity USD price
USD
Water tank CG-4000 4000L Supplied by customer
Raw Water Pump CDL2 2000L/H 300 1 300
Multi-medium filter JDL-2 2000L/H 1,100 1 1,100
Active carbon filter HML-2 2000L/H 1,160 1 1,160
Pure Sodium-ion filter SNJ-2 2000L/H 1,270 1 1,270
water Precision filter JML-2 2000L/H 1,100 1 1,100
treatment Reverse Osmosis FST-2 2000L/H 6,500 1 6,500
line Fittings and Pipe (PVC) 1 1,000
Subtotal amount(USD) 12,430.00
3. Sand filter
3.1 Model: JDL-2
3.2 Height: 1700mm
3.3 Diameter: 400mm
3.4 Material: SUS304 stainless steel (Food grade)—Made in china.
3.5 Components: Water distributor, water gather, pressure gauge, filter material, valves and
so on.
3.6 Filter medium: Sand
3.7 Usage: It is mainly used to remove Plankton, Moss, Suspension, Colloid and so on.
3.8 Filtering volume: 2m³/h
5. Sodium-ion filter
5.1 Model: SNJ-2
5.2 Height: 1700mm
5.3 Diameter:400mm
5.4 Material: SUS304 stainless steel (Food grade)—Made in china.
5.5 Components: Water distributor, water gather, pressure gauge, filter material, strong acid
exchanging resin, solution measurement, valves and so on.
5.6 Medium: Strong acid exchanging resin
5.7 Usage: It is mainly used to remove the calcium and magnesium ion.
5.8 Treating volume:2m³/h
3. Syrup filter
Model: TML-0.5
Adopt SUS304 stainless steel material, polyester foam insulation, digital temperature
controller and thermometer, manhole glass eyes 400, with glass tube liquid level meter,
the lining of 3 MM, 1.5 MM of outside wrapping, on the front side discharging, the
discharging mouth is 550 MM high from the ground, with insulation, thermometer, CIP
cleaning head, slurry type vertical mixing 80RPM
5. Syrup cooler
Model: TL-500
Material: Inside SUS304 stainless steel
Capacity: 500L per time
Chiller: F-3 Chilling volume: 30000Kj/h
Model: QJ-C
Material: Stainless steel 304
Working pressure: ≤0.7Mpa
Purify precision: 99.99%
Filter material: potassium permanganate & Foam
Dimension: 500*400*1400mm
Cooling Tower
Capacity:10m³/H
Dia.:1500mm
Height:2000mm
Features:
1. Compact structured, good-looking, easy to operate and highly automated.
2. Air conveyor is directly linked with feed-in starwheels, making it easier to change bottles
without screws and conveyor chains.
3. Bottles are transferred in the manner of hanging neck. Bottles can be changed through
some replacement, which instead of adjusting the height of machine.
4. Rinsing-clamp which special design is strong and endurable, no contact with
bottle-mouth, to prevent pollution.
5. Highly effective spraying nozzles equipped on the rinsing-clamp can rinse every side of
inner bottle and save water.
6. Accessories which contact with material are all made of stainless steel, no dead angles
and easy to clean up.
7. Bottling volume can be controlled by membrane adjusting valves to ensure accurate
filling.
8. Valve on-off system is driven by hydraulic cylinder, which starts on bottle signals.
9. High-speed and highly accurate bottling valves ensure no loss of liquid at high speed.
10. Equipped with perfect clean management system to ensure the bottle clean.
11. Bottom splint which fixed in the feed-out star wheel goes down in the manner of screw.
Bottles can be changed without adjustment of height of conveyor chain.
12. Capping heads are magnetic constant-torque equipped to ensure capping quality with no
damage.
changed. In order to save the cost and time.(2)In avoid to the second pollution of the
bottle neck.
The filling monoblock works as follows: Bottles are fed from feed-in starwheel into the rinsing
machine monoblock via starwheel. Bottle clamp installed on the rotary wheel of the rinser will
grip bottle neck and make a 180° turn along a guide track to face the bottle mouth downward.
In designated section of the rinser, rinsing water will jet out from special nozzles to flush
bottle inside wall. After rinsing and dripping, bottles gripped by bottle clamp will make
another 180° turn along a guide track to resume bottle neck facing up position. Clean bottles
are discharged out of the rinser by a star wheel to feed the filler. After entering the filler,
bottles are retained by neck supporting carrier plates, which are actuated by bottle carrier
mechanism to raise them by cam. The filling ways adopt gravity filling. Filling valves are
opened by bottle presence signals. After finishing filling, valves are closed by valve closing
mechanism to further stop venting to complete the filling process. Bottle carrier mechanism
is lowered by a cam to disengage filled bottles with filling valves. Then bottles are transferred
into the capper by a neck handling star wheel. Anti-rotation blades on capping heads will
seize the bottle neck to prevent it from rotation and hold it in an upright position. The twist-on
capping head will make revolving and rotating movement along with the machine to finish
the complete capping process of cap picking, placing, twisting, and disengaging under the
control of a cam. A discharge star wheel discharges finished bottles onto discharge conveyor
belt to be conveyed out of the filling monoblock.
Equipment structure:
1 Rinsing system: Combined with rotary tray with clamp, water distributing tray, water tank
Professional Beverage Filling Machine Manufacturer
P(31-19)
and rinsing pump.
2 Filling system: Combined with hydraulic, filling valve, controlling ring.
3 Capping system: Combined with capper, cap sorter and cap falling track.
4 Driving system: Combined with main motor and gears.
5 Bottle transmitting system: Combined with air conveyor, steel starwheels and neck
supporting carrier plates.
6 Electrical controlling system: this part is frequency inverted, PLC controlled and touch
screen operated.
Technical parameter
Model: DCGF14-12-5
Washer: 14
Filler: 12
Capper: 5
Production capacity:1,500-2,000b/h (basis on 500ml PET bottle Carbonated Water)
4,000-4,500b/h (basis on 500ml PET bottle Non-carbonated Water)
Filling precision: ≤±5mm (liquid level)
Filling pressure: <0.4Mpa
Rating evaporation 24
Rating steam pressure 0.4/0.7
Power 18Kw
Weight 91kg
SPECIFICATION
Semi-automatic Shrink Packing Machine(GM-SP)
Details:
Semi-automatic sleeve film, sealing and shrinking machine widely used in beverage,
foodstuff, medicine and chemical etc combination packing. It is suitable for with bottom
support and without bottom support, with carton. Square shape, round shape, flat shape all
can be packed. The packing effect is good, cost is low. The machine apply newly optimize
design, electric automatic control, orientation is correct. Adjustment is agility when changing
bottle and packing specification. The whole machine is safety and beautiful.
Adjustable hot air circle structure is applicable in all kinds of shrinking film (contain color
printing). Change film is quick and convenient. High quality electricity parts assure the stable
The whole machine is made of high quality carbon steel and some stainless steel. The
structure is compact and reasonable, wear well, marked energy saving effect. It is
preliminary auxiliary equipment for the beverage filling production line.
Technology parameter
Power:AC 220V(3Phase) 50HZ
Max. power:26KW
Overall dimension:5870×4000×1700(mm)
Total weight:~1100kg
Shrinking temperature:130-260℃
Shrinking time:0-8s
P(31-26)
SPECIFICATION
Semi-automatic CIP Cleaning Machine
A.flow chart:
concentrated acid concentrated alkali
IV Other items
1. Cooperation that customer should offer
The condition of site should be in compliance with Foundation Placement Drawing that is
furnished by seller.
1) The customer should supply no less than 10-20pcs samples for each kind of cap
and bottle after sign the contract, and supply no less than 400-500pcs for each kind
of bottle and no less than 500pcs of each kind of cap for machine adjustment.
2) The customer should confirm the placement drawing and other material with
signature after signing the contract.
3) The customer should supply the condition of installation site and commission:
➢After the equipments are arrived at the customer’s site, the buyer is responsible for
unpacking and arranging the equipment according to the placement drawing ; and
do under our install-adjust technicians’ guidance.
➢According to requirement of water, electricity, air and steam consumption and the
demands of quality level and pipeline, the User should connect the wire, cable and
pipe of water, air and steam to the special position ordered in the installation area of
production line ahead of time. Other relevant matching equipment and project
should be finished before we adjust our equipment.
➢We’ll bring a suit of portable installation and adjustment tools ourselves during the
period of installing and adjusting, the other instruments we need should be
furnished by the customer for free including oxygen, acetylene angry, argon, etc.
needed in the installation and adjustment site.
➢The customer should dispatch the capable person to accept training in the installing
site.
b) Training
We are responsible for offering the technical training to user. The training content
includes the structure and maintenance of the equipments, control and operation of the
equipments. The training lessons are finished in the process of installation and
adjustment. Through training, users' technical staff can grasp and the skill of operation