Professional Documents
Culture Documents
Scaffolding JSEA
Scaffolding JSEA
JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
1
EL remove all unnecessary that can cause of obstraction
S
EC
Site Survey of scaffold Site Evaluation for the work 1. All prsonnel to have completed the site specific induction.
erection area before area. Evaluate the possible Operational slip and trip hazard Fracture, body injurie 2.
start erecting. hazard and risks at the work precise coordination
area. A 3. Ensure that
workers are educate on spotting potential hazards.
Occupational Slips, trips and falls at cuts, bruises, sprains 3. Check for any items that may cause slips, trips and falls
Health & Safety the same level and strains and remove or secure them as required.
EL
S
EC
A
PPE safety shoes
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
4 EL
S
EC
Mobilization of Mobilization of manpower Occupational Hit by moving 1. Ensure all workers abide to the traffic rules and regulations
Manpower to the work area for the Health & Safety machinery Bodily injury/Fatality in the plant.
scaffolding erection 2. Ensure workers use the pedestrian walkway
provided during travelling.
3 Be extra carefull when crossing the road.
A
PPE
5
EL
1. Ensure material is carried in small quantity to minimize the
weight carried.
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
6
EL
S
EC
1. All personnel to have read and understood the RA that is
Occupational specific for their area of work 2
Health & Safety Poor access and egress Bodily Injury
Make sure all access and egress, access ladders, steps and
ramps are safe and secure.
3. RA
is to be modified where and when necessary to reflect the
changing work area.
Preperation of Asses work area access and weather A
working area condition PPE
EL
S
EC
Occupational Poor or bad weather Bodily injuries, Immediately cease work in hazardous weather conditon such
Health & Safety conditon property damage as:
A 1. strong winds that may cause loss of balance.
2. Rain is causing a
slippery work surface.
PPE
7
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
1. Educate worker of correct manual lifting method.
Ergonomally hazards bodily injury/back pain 2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3.
avoid awkward position to prevent body pain/back pain.
A
Lay Sole board, if required PPE
Erection / modification of Occupational Health & EL
scaffolding place base plates at suitable Safety
location S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
7
Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
A load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
pitch the standard at spacing edges around the base bodily injury/hand
injury/cuts 3. proper
plate communication and coordination before lifting tubular pipes.
Install the lift ledgers of not more than 2.5mapart.
Secure foot-tie at inner side Occupational Health &
and transoms of not more that 460mm
Safety 4. provide an awareness training regarding
from ground. line of fire and hand finger safety.
A
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title pitch the standard at spacing Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
Install the lift ledgers of not more than 2.5mapart.
Secure foot-tie at inner side Occupational Health &
and transoms of not more that 460mm
Safety
Risk Procedure / Job Steps Activities/Equipment/Products
from ground. Aspect / Hazard / Risk
Item or Services
Risk Category
Source / Vulnerability
Impact / Risk / Threat HOC Control Measures Action Plan Target Date
EL
S
1. Ensure vertical tubes are not releasd until the foot ties are
securely installed.
2. ensure ratchet
Hit by falling scaffold spanner is secured to the erectors body.
tubes, ratchet spanner Bodily injury/ fatality/ EC
damage to property
and coupling 1. Ensure worker are trained and qualified to erect,
dismantle or modify scaffold.
2. Ensure
close supervision
3. implement a buddy system for assistance to
hold vertical tubes during securing of foot-tie.
A
PPE
9
EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
Occupational
Health & Safety Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
A
PPE
EL
S
EC
PPE
EL
S
Install temporary platform
Erect working flatform (at least 500mm wide) and 1. Ensure metal decking, ladder are not released until it is
temporary access ladder secured. .
2. Ensure ratchet spanner is secured to the
erectors body.
Hit by falling metal,
Occupational decking, ladder, ratchet Bodily injury/ fatality/ EC
Health & Safety spanner and coupling. damage to property
1. Ensure worker are trained and qualified to erect,
dismantle or modify scaffold.
2. Ensure close supervision
3. implement a buddy
system for assistance to hold the flatform during securing.
A
PPE
Stop work if severe weather condition (wind speed is above
EL 16 knots).
S
1. work area to be barriered off by suitable means to prevent
access of unuathorized personnel.
2. Install independent lifline for
Falling from anchoring points of lanyard encase of sacffold colapse.
Occupational height/drop object or
Health & Safety small materials /falling Bodily Injury/ fatality 3. Secure tools using nylon rope, provision of tool
of ladder EC bag for small object to prevent from falling.
1. must be supplemented by the posting of prominently
located signage.
2. secure PTW with secondary
PTW for W@H
A 3. ensure 100% tie-off of FBH lanyard
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
EC
PPE
Occupational
Health & Safety
Erection of scaffolding
Erection of Edge protection bey means of toe
protection, ladder
and toe board board, install ladder to
access each individual lift.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
EL
Occupational S
Health & Safety
EC
1. Educate worker on proper hand placement
Pinch point, sharp bodily injury/hand 2. Buddy buddy system
edges around the base injury/cuts 3. proper
plate communication and coordination before lifting tubular pipes.
4.
Erection of scaffolding provide an awareness training regarding line of fire and hand
Erection of Edge finger safety.
protection, ladder protection bey means of toe A
and toe board board, install ladder to
access each individual lift. Ensure hand gloves is worn in any operation
PPE
no modification is to made to the scaffold, specially removal
of ties or structural members.
EL
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date July 24-31, 2019
EL
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
11
Occupational Bodiliy injury, disability, 1. post warning signs and work within the sealed area
Health & Safety Fall of materials fatality, property or 2. Only the material being used to be out
equipment damage on the scaffold until boardedd areas are erected to store.
A
3. materials to be stored in a safe and
secure manner, to prevent them accidentally falling or being
knocked off th eworking platform when at height.
4. Ensure
close monitoring and supervision.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
12
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
13
3. remove any items that may obstruct the work activty; and
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Occupational Slips, trips and falls at cuts, bruises, sprains 3. Check for any items that may cause slips, trips and falls
Health & Safety the same level and strains and remove or secure them as required.
EL
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
prepare tools, equipment
and materials to be used for
Preparation and erecting of scaffold (tubular
3
mobilization of tools, pipes, fixed/swivel clamps,
Companyequipment and toeboards, flatforms, beam Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
scaffolding materials clams, and all necessary
Department/s scaffold materials and Contractor Revision No 5
accessories). Effective Date Nov. 29 - dec. 5, 2019
Job Title Erection/Modification and dismantling of scaffolding unit 1
Occupational Slips, trips and falls at cuts, bruises, sprains
Health & Safety the same level and strains
Risk Activities/Equipment/Products Aspect / Hazard / Risk
Item
Procedure / Job Steps
or Services
Risk Category
Source / Vulnerability
Impact / Risk / Threat HOC Control Measures Action Plan Target Date
A
PPE safety shoes
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
S
EC
Mobilization of manpower 1. Ensure all workers abide to the traffic rules and regulations
Mobilization of to the work area for the Occupational Hit by moving
4
Manpower Health & Safety machinery Bodily injury/Fatality in the plant.
scaffolding erection 2. Ensure workers use the pedestrian walkway
provided during travelling.
3 Be extra carefull when crossing the road.
A
PPE
EL
1. Ensure material is carried in small quantity to minimize the
weight carried.
S
Manual Loading and Loading and unloading of 1. Keep access and egress routes clear and segregate the
Occupational work area from others and vehicles in access areas.
5 unloading of scaffold scaffold materials use for Health & Safety
materials erection of scaffold 2.
remove any items that may obstruct the work activity
EL
S
Tripping and Slipping Bodily Injury, fracture, EC
hazard disability
1. avoid carrying large material that could obstruct view
ahead.
2. Check for any items that may cause slips, trips and
falls and remove or secure them as required.
3. Maintain good
A housekeeping at work area.
PPE safety shoes
EL
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Occupational Poor or bad weather Bodily injuries, Immediately cease work in hazardous weather conditon such
Health & Safety conditon property damage as:
A 1. strong winds that may cause loss of balance.
2. Rain is causing a
slippery work surface.
PPE
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
1. Educate worker of correct manual lifting method.
Ergonomally hazards bodily injury/back pain 2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3.
avoid awkward position to prevent body pain/back pain.
A
Lay Sole board, if required Occupational PPE
Erection / modification of
7 scaffolding place base plates at suitable Health & Safety EL
location S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
bodily injury/hand 3.
edges around the base injury/cuts
plate A
proper communication and coordination before lifting
tubular pipes.
4. provide an awareness training regarding
line of fire and hand finger safety.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Lay Sole board, if required
7
Erection / modification of
place base plates at suitable Occupational Document ID No. JSEA-ICS-005
scaffolding
Company location Health & Safety Insrumentation &Control Specialists, Inc.
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Pinch point, sharp bodily injury/hand
edges around the base injury/cuts
plate
Risk Activities/Equipment/Products Aspect / Hazard / Risk
Item
Procedure / Job Steps
or Services
Risk Category
Source / Vulnerability
Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
A load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp bodily injury/hand 2. Buddy buddy system
pitch the standard at spacing edges around the base injury/cuts 3. proper
of not more than 2.5mapart.
8
Install the lift ledgers Secure foot-tie at inner side Occupational Health & plate communication and coordination before lifting tubular pipes.
and transoms Safety
of not more that 460mm 4. provide an awareness training regarding
from ground. line of fire and hand finger safety.
A
PPE
EL
S
1. Ensure vertical tubes are not releasd until the foot ties are
securely installed.
2. ensure ratchet
Hit by falling scaffold spanner is secured to the erectors body.
tubes, ratchet spanner Bodily injury/ fatality/
EC
and coupling damage to property
1. Ensure worker are trained and qualified to erect,
dismantle or modify scaffold.
2. Ensure
close supervision
3. implement a buddy system for assistance to
hold vertical tubes during securing of foot-tie.
A
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
Occupational
Health & Safety Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
A
PPE
EL
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Install temporary platform
9 Erect working flatform (at least 500mm wide) and
temporary access ladder
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
1. Educate worker of correct manual lifting method.
Ergonomically hazards bodily injury/ back 2. Advice worker to seek help if the
pain/ muscle strain
load is to heavy/large (Buddy Buddy System)
3. avoid awkward position to prevent body
pain/back pain.
4. avoid over reaching to
prevent muscle strain
A
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
edges around the base bodily injury/hand 3. proper
plate injury/cuts
communication and coordination before lifting tubular pipes.
4.
provide an awareness training regarding line of fire and hand
A finger safety.
Collapse of scaffold Serious injury/ fatality / 1. Structural design of scaffold must be review and sign by a
when erected and property damage structuraal engineer.
during dsmantle 2. Scaffolds to be located upon firm and solid
foundations that are capable of withstanding all impose load.
3. scaffold to be physically tied throughout all satges of
erection and dismantling.
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Fall from height /Fall 1. Secure supporting PTW for working at heights
Occupational from scaffold or
serious injury/ 2. Ensure close supervision
Health & Safety working flatform
disability/ fatality 3. Ensure 100% tie-off of
A
full body harness lanyard 4.
ensure 3 point of contact while descending and ascending on
scaffold ladder and working flatform.
5. Make sure all workers stayfully within the
scaffold at all times.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
EL
S
1. Scaffold to be dismantled in accordance with
EC
manufacturers or supplier instruction.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No 5
Job Title Erection/Modification and dismantling of scaffolding unit 1 Effective Date Nov. 29 - dec. 5, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019