Province of Leyte
Municipality of Palo
Municipal Engineers Office
PROGRAM OF WORK
PROJECT DESCRIPTION:
55 sq.m. area
I - A. DIRECT COST
1. Materials #ERROR! (P 27,575.00) #ERROR!
B. INDIRECT COST
1. Overhead, Contengencies & Miscellaneous
& Profit #ERROR! (P 7,552.25)
III - CONTENGENCIES/RESERVES
Approved by:
Item: 102
Description: Excavation
1. Quantity: 8.16 cu.m. 8.16
2. Materials:
Name and Specification Quantity Unit Unit Price Total Cost
3. Equipment:
Name and Capacity No. of Units No. of Days Rate per Day Total Cost
4. Labor:
Designation of Personnel No. of Men No. of Days Rate per Day Total Cost
Construction Foreman 1 3 ( 500.00) ( 1,500.00)
Mason 1 3 ( 450.00) ( 1,350.00)
Non Skilled Personnel 4 3 ( 300.00) ( 3,600.00)
DETAILED ESTIMATE
Item: 1001
Description: Storm Drainage and Sewerage System
1. Quantity: 55.00 sq.m.
2. Materials:
Name and Specification Quantity Unit Unit Price Total Cost
Portland Cement 17 bags ( 280.00) ( 4,760.00) slab 0.476 5 bags cement
3/4" Gravel 3 cu.m. ( 1,300.00) ( 3,900.00) 0.25cu.m. sand
Fresh Sand 3 cu.m. ( 800.00) ( 2,400.00) 0.50cu.m.
4" CHB 300 pcs. ( 16.00) ( 4,800.00)
10mmØ Def. Bars 30 pcs. ( 150.00) ( 4,500.00) a
1/4" Ordinary Plywood 2 sheets ( 270.00) ( 540.00) b
2" x 2" x 12' Coco Lumber 5 pcs. ( 160.00) ( 800.00) c 112
Assorted C.W. Nails 1 kg. ( 95.00) ( 95.00) d
Tie Wire 2 kgs. ( 85.00) ( 170.00)
4"Ø Sanitary Pipe 4 pcs. ( 460.00) ( 1,840.00)
90˚ x 4"Ø Elbow 2 pcs. ( 85.00) ( 170.00) 0.6 0.12 ( 0.72)
4"Ø Tee Elbow 3 pcs. ( 85.00) ( 255.00) 0.408 ( 0.82)
4"Ø Clean Out Plug 4 pcs. ( 145.00) ( 580.00) 0.765 ( 1.53)
4"Ø x 2" Tee Elbow 2 pcs. ( 85.00) ( 170.00)
4"Ø Wye Elbow 2 pcs. ( 85.00) ( 170.00) ( 3.07)
4"Ø x 2" Wye Elbow 2 pcs. ( 85.00) ( 170.00)
90˚ x 3"Ø Elbow 6 pcs. ( 85.00) ( 510.00) 10.2 2.4 ( 5.44) ( 18.04)
60˚ x 3"Ø Elbow 2 pcs. ( 65.00) ( 130.00)
2"Ø Sanitary Pipe 3 pcs. ( 245.00) ( 735.00)
Solvent Cement 2 can ( 160.00) ( 320.00)
4" x 4" Brass Floor Restrainer 2 pcs. ( 280.00) ( 560.00)
3. Equipment:
Name and Capacity No. of Units No. of Days Rate per Day Total Cost
4. Labor:
Designation of Personnel No. of Men No. of Days Rate per Day Total Cost
Construction Foreman 1 4 ( 500.00) ( 2,000.00)
Mason 2 4 ( 450.00) ( 3,600.00)
Non Skilled Personnel 4 4 ( 300.00) ( 4,800.00)
SUMMARY
Toilet
Recommending Approval:
6.4 12.4
area = 21.08 263.5 chb
cement plaster area = 42.16 16.69536 bags- cement mortar
0.91698 cu.m. - sand
11.29888
0.33728 cu.m. - sand
reinforcement bars