Professional Documents
Culture Documents
FOR
FOR
9/9/1999
After School Centre
Unit Quantity Rate Amount
BILL NO. 1
EARTHWORKS (PROVISIONAL)
2 Trenches. m³ 447
3 Bases. m³ 2
5 Soft rock. m³ 90
6 Hard rock. m³ 67
Compaction:
Carried to Collection N$
Bill No. 1
Earthworks (provisional)
1
After School Centre
Unit Quantity Rate Amount
Surface Preparation:
SOIL POISONING
Carried to Collection N$
Bill No. 1
Earthworks (provisional)
2
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 1
Earthworks (provisional)
3
After School Centre
Amount
BILL NO. 1
EARTHWORKS (PROVISIONAL)
COLLECTION
Page No
Carried to Summary N$
Bill No. 1
Earthworks (provisional)
4
After School Centre
Unit Quantity Rate Amount
BILL NO. 2
CONCRETE, FORMWORK AND REINFORCEMENT
SUPPLEMENTARY PREAMBLES
UNREINFORCED CONCRETE
25Mpa/19mm Concrete
1 Surface beds. m³
3 Steps m³ 1
25Mpa/19mm Concrete
4 Strip footings. m³ 62
REINFORCED CONCRETE
25 MPa/19mm Concrete:
5 Bases. m³ 0.50
Carried to Collection N$
Bill No. 2
Concrete, Formwork And Reinforcement
5
After School Centre
Unit Quantity Rate Amount
8 Wall Beams. m³ 13
9 Isolated beams. m³ 1
11 Columns. m³ 0.22
14 Stub columns. m² 2
17 Rectangular columns. m² 2
Carried to Collection N$
Bill No. 2
Concrete, Formwork And Reinforcement
6
After School Centre
Unit Quantity Rate Amount
REINFORCEMENT (PROVISIONAL)
Fabric reinforcement:
Carried to Collection N$
Bill No. 2
Concrete, Formwork And Reinforcement
7
After School Centre
Amount
BILL NO. 2
CONCRETE, FORMWORK AND REINFORCEMENT
COLLECTION
Page No
Carried to Summary N$
Bill No. 2
Concrete, Formwork And Reinforcement
8
After School Centre
Unit Quantity Rate Amount
BILL NO. 3
MASONRY
SUPPLEMENTARY PREAMBLES
BRICKWORK IN SUPERSTRUCTURE
BRICKWORK SUNDRIES
Brickwork sundries:
Carried to Collection N$
Bill No. 3
Masonry
9
After School Centre
Unit Quantity Rate Amount
Brickwork reinforcement:
Carried to Collection N$
Bill No. 3
Masonry
10
After School Centre
Amount
BILL NO. 3
MASONRY
COLLECTION
Page No
10
Carried to Summary N$
Bill No. 3
Masonry
11
After School Centre
Unit Quantity Rate Amount
BILL NO. 4
WATERPROOFING
1 In walls. m² 76
3 On flat roofs. m² 2
Carried to Summary N$
Bill No. 4
Waterproofing
12
After School Centre
Unit Quantity Rate Amount
BILL NO. 5
ROOF COVERINGS
SUPPLEMENTARY PREAMBLES
Carried to Summary N$
Bill No. 5
Roof Coverings
13
After School Centre
Unit Quantity Rate Amount
BILL NO. 6
CARPENTRY AND JOINERY
FLUSH DOORS
PELMITS, ETC.
JOINERY SUNDRIES
Wrought meranti:
Carried to Summary N$
Bill No. 6
Carpentry And Joinery
14
After School Centre
Unit Quantity Rate Amount
BILL NO. 7
CEILINGS PARTITIONS AND ACCESS FLOORING
SUPPLEMENTARY PREAMBLES
NAILED UP CEILINGS
1 Ceilings. m² 363
2 Sloping ceilings. m² 57
Carried to Summary N$
Bill No. 7
Ceilings Partitions And Access Flooring
15
After School Centre
Unit Quantity Rate Amount
BILL NO. 8
FLOOR COVERINGS
1 On floors. m² 311
Carried to Summary N$
Bill No. 8
Floor Coverings
16
After School Centre
Unit Quantity Rate Amount
BILL NO. 9
IRONMONGERY
Union:
LOCKS
Union:
Union:
BATHROOM FITTINGS
Solid:
Carried to Collection N$
Bill No. 9
Ironmongery
17
After School Centre
Unit Quantity Rate Amount
SUNDRIES
Solid:
SHELVING UNITS
Vitrex:
Carried to Collection N$
Bill No. 9
Ironmongery
18
After School Centre
Amount
BILL NO. 9
IRONMONGERY
COLLECTION
Page No
18
Carried to Summary N$
Bill No. 9
Ironmongery
19
After School Centre
Unit Quantity Rate Amount
BILL NO. 10
STRUCTURAL STEELWORK
SUPPLEMENTARY PREAMBLES
4 180 x 100 x 6mm Achor plate twice holed for M16 Bolt No. 20
Carried to Collection N$
Bill No. 10
Structural Steelwork
20
After School Centre
Unit Quantity Rate Amount
9 180 x 100 x 6mm Achor plate twice holed for M16 Bolt. No. 20
Carried to Collection N$
Bill No. 10
Structural Steelwork
21
After School Centre
Amount
BILL NO. 10
STRUCTURAL STEELWORK
COLLECTION
Page No
21
Carried to Summary N$
Bill No. 10
Structural Steelwork
22
After School Centre
Unit Quantity Rate Amount
BILL NO. 11
METALWORK
SUNDRY STEELWORK
Cornise:
3 8mm x 60mm Coach screws including plugs and holes. No. 644
Corner protectors:
Carried to Collection N$
Bill No. 11
Metalwork
23
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 11
Metalwork
24
After School Centre
Unit Quantity Rate Amount
30 Window 1143 x 490mm high with one fixed light (W15). No. 9
Carried to Collection N$
Bill No. 11
Metalwork
25
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 11
Metalwork
26
After School Centre
Amount
BILL NO. 11
METALWORK
COLLECTION
Page No
24
25
26
Carried to Summary N$
Bill No. 11
Metalwork
27
After School Centre
Unit Quantity Rate Amount
BILL NO. 12
PLASTERING
SCREEDS
Screeds on concrete:
INTERNAL PLASTER
3 On walls. m² 772
4 On narrow widths. m² 26
6 On narrow widths. m² 85
EXTERNAL PLASTER
7 On walls. m² 4
8 On narrow widths. m² 11
11 On narrow widths. m² 46
Carried to Collection N$
Bill No. 12
Plastering
28
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 12
Plastering
29
After School Centre
Amount
BILL NO. 12
PLASTERING
COLLECTION
Page No
29
Carried to Summary N$
Bill No. 12
Plastering
30
After School Centre
Unit Quantity Rate Amount
BILL NO. 13
TILING
WALL TILING
2 On walls. m² 394
FLOOR TILING
5 On floors. m² 4
Carried to Collection N$
Bill No. 13
Tiling
31
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 13
Tiling
32
After School Centre
Amount
BILL NO. 13
TILING
COLLECTION
Page No
32
Carried to Summary N$
Bill No. 13
Tiling
33
After School Centre
Unit Quantity Rate Amount
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
Gulleys:
uPVC pipes:
SANITARY FITTINGS
Carried to Collection N$
Bill No. 14
Plumbing And Drainage (provisional)
34
After School Centre
Unit Quantity Rate Amount
Carried to Collection N$
Bill No. 14
Plumbing And Drainage (provisional)
35
After School Centre
Unit Quantity Rate Amount
TRAPS ETC
Approved:
11 40mm Deep seal 'P' or 'S' trap of plaible rubber ref. YDI
001. No. 7
'Cobra Watertech':
SANITARY PLUMBING
uPVC pipes:
18 40mm Pipes. m 12
19 50mm Pipes. m 8
20 110mm Pipes. m 5
Carried to Collection N$
Bill No. 14
Plumbing And Drainage (provisional)
36
After School Centre
Unit Quantity Rate Amount
Sundries:
WATER SUPPLIES
'Solahart':
Carried to Collection N$
Bill No. 14
Plumbing And Drainage (provisional)
37
After School Centre
Unit Quantity Rate Amount
TESTING
Testing:
'Chubb':
HOLES ETC
Carried to Collection N$
Bill No. 14
Plumbing And Drainage (provisional)
38
After School Centre
Amount
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
COLLECTION
Page No
35
36
37
38
Carried to Summary N$
Bill No. 14
Plumbing And Drainage (provisional)
39
After School Centre
Unit Quantity Rate Amount
BILL NO. 15
GAS INSTALLATION (PROVISIONAL)
SUPPLEMENTARY PREAMBLES
User Notes:
FITINGS, ETC
VALVES, ETC
GAS SUPPLIES
Cylinder:
Carried to Summary N$
Bill No. 15
Gas Installation (provisional)
40
After School Centre
Unit Quantity Rate Amount
BILL NO. 16
GLAZING
4mm Obscure:
Carried to Summary N$
Bill No. 16
Glazing
41
After School Centre
Unit Quantity Rate Amount
BILL NO. 17
PAINTWORK
ON FLOATED PLASTER
ON METAL
4 On door frames. m² 23
Carried to Collection N$
Bill No. 17
Paintwork
42
After School Centre
Unit Quantity Rate Amount
ON WOOD
12 On doors. m² 28
SIGNWRITING
Carried to Collection N$
Bill No. 17
Paintwork
43
After School Centre
Amount
BILL NO. 17
PAINTWORK
COLLECTION
Page No
43
Carried to Summary N$
Bill No. 17
Paintwork
44
After School Centre
Amount
BILL NO. 18
PROVISIONAL SUMS
ELECTRICAL INSTALLATION
Electrical installation:
KITCHEN EQUIPMENT
4 Allow the sum of N$50,000.00 (Fifty Thousand NAD) for Kitchen Installation. Item 0 00
7 Allow the sum of N$25,000.00 (Twenty Five Thousand NAD) for Audio
visual Installation. Item 0 00
GYM EQUIPMENT
10 Allow the sum of N$50,000.00 (Fifty Thousand NAD) for Gym Equipment
Installation. Item 0 00
Carried to Summary N$
Bill No. 18
Provisional Sums
45
After School Centre
Amount
Carried to Summary N$
Bill No. 18
Provisional Sums
46
After School Centre
Amount
1 EARTHWORKS (PROVISIONAL) 4
3 MASONRY 11
4 WATERPROOFING 12
5 ROOF COVERINGS 13
8 FLOOR COVERINGS 16
9 IRONMONGERY 19
10 STRUCTURAL STEELWORK 22
11 METALWORK 27
12 PLASTERING 30
13 TILING 33
16 GLAZING 41
17 PAINTWORK 44
18 PROVISIONAL SUMS 46
ADD: CONTINGENCIES
Allow the Amount of N$134,000.00 (On Hundred and Thirty Four 134,000 00
Thousand Namibian Dollars) for contingencies, to be used as instructed by
the Client in terms of Clause 10 of the Agreement and Schedule of
Conditions of Building Contract.
Carried to Next N$
SUMMARY
47
After School Centre
Amount
Brought from Previous N$
SUMMARY
48
After School Centre
Bill No Page No
1 EARTHWORKS (PROVISIONAL) 1
Soil Poisoning 2
Supplementary Preambles 5
Unreinforced Concrete 5
Reinforced Concrete 5
Reinforcement (Provisional) 7
3 MASONRY 9
Supplementary Preambles 9
Brickwork In Superstructure 9
Brickwork Sundries 9
4 WATERPROOFING 12
(i)
After School Centre
5 ROOF COVERINGS 13
Supplementary Preambles 13
Flush Doors 14
Pelmits, Etc. 14
Joinery Sundries 14
Supplementary Preambles 15
Nailed Up Ceilings 15
8 FLOOR COVERINGS 16
9 IRONMONGERY 17
Locks 17
Bathroom Fittings 17
Sundries 18
Shelving Units 18
10 STRUCTURAL STEELWORK 20
Supplementary Preambles 20
(ii)
After School Centre
11 METALWORK 23
Sundry Steelwork 23
12 PLASTERING 28
Screeds 28
Internal Plaster 28
External Plaster 28
13 TILING 31
Wall Tiling 31
Floor Tiling 31
Sanitary Fittings 34
Traps Etc 36
(iii)
After School Centre
Sanitary Plumbing 36
Water Supplies 37
Testing 38
Holes Etc 38
Supplementary Preambles 40
Fitings, Etc 40
Valves, Etc 40
Gas Supplies 40
16 GLAZING 41
17 PAINTWORK 42
On Floated Plaster 42
On Metal 42
On Wood 43
Signwriting 43
18 PROVISIONAL SUMS 45
Electrical Installation 45
Kitchen Equipment 45
Gym Equipment 45
SUMMARY 47
(iv)