Construction on-going;
Estrella- Replacement of existing 2-lane
July 2018- P 1.367- 8.159 % complete against
Panteleon bridge with 4-lane bridge (143.2 lm) NCR DPWH
May 2020 billion target 5.95% as of April
Bridge and approach connecting Rockwell
2019.
Center, Makati City and Barangka
Ibaba, Mandaluyong City for a total
length of 358lm
Bonifacio
Global City to
Ortigas Construction of 613.77 m bridge Construction on-going;
P 1.896-
Center Road connecting Ortigas Center and NCR 2017-2020 DPWH 31.33 % complete against
billion
Link Project , Bonifacio Global City. target 49.44%
Phase I,IIA
&IIB
Malitubog-
Ongoing irrigation project located in
Maridagao
North Cotabato and the REGION XII- P 5.444- Physical accomplishment
Irrigation 2016-2019 NIA
Maguidanao area. The project will ARMM billion of 54.91% as of March 2019
Project,
divert irrigation water from
Phase II
Maridagao River to deliver timely
and adequate irrigation water to
9,784
hectares of agricultural lands.
Clark Green
City
Government The National Government Center will
Center (a host Satellite Offices of all branches Construction on-going; 46.7
component of the Philippine Government; the Region III 2018-2022 P 1.78-billion BCDA % complete against
of National Executive, Legislative and Judiciary, 47.665%
Government as well as their attached agencies.
Administrative
Center)