Introduction (Introduce your design, purpose, reasons etc)

Green building is a building that each of the humans on earth that always try to implement. It is a
building that reduces and eliminates negative impacts on our climate and natural environment. Any
building can be a green building, such as home, an office, a school, a commercial center and more. As
time passes by, more pollutants are releasing to the environment and the global temperature is increasing
due to greenhouse gases. Therefore, green building sustainability design will be one of the hot topic that
discuss by all of us in future.

Water is one of the main source that needed by humans. However, most of the humans consume water
excessively without any consciousness. In this case plumbing system of a green building takes an
important role. This is because it controls the volume and the flow direction of water in the building. By
applying water recycling method, we ensure that the water in a green building can be restore, filter again
and reuse. There is an idea that were implemented by us in order to achieve the environmental friendly
effect of plumbing system in a green building. Nevertheless, a normal double storey house without any
linkage with other houses is a green building that we chose to design. Figure 1.0 acts as a sample that
shows a normal plumbing system of a double storey house.

In this paper, we have made use of the water recycling method, some chemistry knowledge, part of
technology knowledge of building appliances, logical thinking, and others to design our green building.
There are 2 major ideas that we wanted to present in this proposal. Firstly, a rainfall storage system. As
we know that rainfall is one of the main water resources in our life. It produces a high amount of water
that can be used for a household for a few days. Secondly, glass wall condenser. Condensation is a kind
of chemical reaction that convert the water vapor in the air into liquid water. By combining these 2
ideas, we created a plumbing system that included rainfall storage and condensation. The plumbing
system will be describe in the content of our proposal.
Content (Overall explanation of project, innovation etc)
Project Budget (This is an example only, refer to any valid example you find)

1. General Requirement

NO. DESCRIPTION UNIT(s) REMARKS COST (RM)


1. Survey - 20.00
2. Approval fees from local - 150.00
government authorities -
3. Legal fees - 500.00
4. Permits - 40.00
5. Life Insurance 8 160.00
6. Administrative fees - 1200.00
7. Transportation  - Materials and 500.00
compartments
TOTAL 2570.00

2. Solar system installation

NO. DESCRIPTION REMARKS COST (RM)


1. Solar panel  60 150000.00
2. Wiring components 450.30
3. Metal frames for solar panel - 435.60
4. Electronics components - 320.70
5. Construction fees - 560.00
6. Programming system establishment  120.00
7. Wiring works - 180.00
8. Assembly of compartments works - 300.00
9. Hazard checking - 45.00
10. Site cleaning 50.00
11.

TOTAL 152461.60