INTRODUCTION
This design reports contains the design of project sign board for AIRPORT AND AVIATION SERVICES
(SRI LANKA) LIMITED.
1
2. CODES OF PRACTICES AND REFERENCES
* BS 4466 (1981)
Specification for Bending Dimensions and Scheduling of Reinforcement for Concrete.
3. DESIGN CONSIDERATION
a. Material Properties
Density of Concrete = 24 KN/m3
Density of Water = 10 KN/m3
Concrete Grade = 25 N/mm2
Characteristic Strength of high yield Steel = 460 N/mm2
Modulus of Elasticity of Concrete (E C) = 26 KN/mm2
Modulus of Elasticity of steel (Est) = 205 KN/mm2
b. Durability Requirement
Exposure Condition - Severe
Clear cover to r/f = 50 mm
c. Imposed Load
Live load =
d. Foundation
Bearing capacity = 150 kN/m2
1
4. FINITE ELEMENT MODEL
1
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
1.1.1 Analysis
(a). Both back wask tank and the clear water reservoir is covered with the
Wall-A. Wall-F is also connected to the wall-A at 5.5m from Grid-A
(b). As the pump house is located on top of the back wash tank, the effect
from pump house is also concidered for the design.
24 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Height
ULS Condition SLS Condition
from Base
0.00 141.2 100.70
Verticall 1.25 34.3 20.20
Inner R/F 2.50 25.4 18.20
(M22) 3.90 18.6 10.50
5.30 11.3 6.00
0.00 110.3 78.20
Vertical 1.25 30.5 25.90
Outer R/F 2.50 22.5 16.80
(M22) 3.90 20.8 14.90
5.30 5.1 1.20
0.00 26.8 16.40
Horizontal 1.25 158.1 114.80
Inner R/F 2.50 195.54 176.80
(M11)
3.90 92.6 64.30
5.30 82.9 59.20
0.00 38.6 27.50
Horizontal 1.25 97.8 69.70
Outer R/F 2.50 118.4 90.70
(M11) 3.90 45.3 34.20
5.30 40.6 28.90
0.00 147.8 112.50
1.25 132.4 82.50
Shear
Force 2.50 138.2 98.4
3.90 73.5 62.2
5.30 53.6 38.5
0.00 26.3 115.2
1.25 170.5 136.9
Tension 2.50 210.5 150.3
25 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Assuming,
Cover = 50 mm
Thickness of Wall
Base to 2.8m height = 450 mm
2.8m height to top = 300 mm
Vertical Reinforcement
Base to 2.8m height = 16 mm φ Bars
2.8m height to top = 12 mm φ Bars
26 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8110
References Description Output
part-1
Cl.3.4.4.4 M kNm/m 110.30 30.50 22.50 20.80 5.10
b mm 1000.00 1000.00 1000.00 1000.00 1000.00
t mm 450.00 450.00 300.00 300.00 300.00
R/F Dia mm 16.00 16.00 12.00 12.00 12.00
d mm 380.00 380.00 232.00 232.00 232.00
fcu N/mm2 35.00 35.00 35.00 35.00 35.00
fy N/mm2 460.00 460.00 460.00 460.00 460.00
M/bd fcu 2
0.022 0.006 0.012 0.011 0.003
k 0.022 0.006 0.012 0.011 0.003
k' 0.156 0.156 0.156 0.156 1.156
z mm 370.55 377.43 228.88 229.12 231.30
0.95d mm 361.00 361.00 220.40 220.40 220.40
Zcorrect mm 361.00 220.40 220.40 220.40 220.40
x mm 42.22 354.67 25.78 25.78 25.78
As(req) mm2/m 763 346 255 236 58
No of Bars Nos. 4 2 3 3 1
Spacing mm 250 500 333 333 1000
Selected Spacing 125 125 125 125 125
Vertical Reinforcement
Base to 2.8m height = 16 mm φ Bars
2.8m height to top = 12 mm φ Bars
Horizontal Reinforcement = 12 mm φ Bars
27 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
28 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Thermal Zone φ ρ As
12 0.0044 995
225 16 0.0059 1327
20 0.0074 1658
12 0.0044 663
150 16 0.0059 884
20 0.0074 1106
29 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Inner Outer
Φ 16 mm Φ 16 mm
ULS 977 mm2/m ULS 763 mm2/m
Thermal 1327 mm2/m Thermal 1327 mm2/m
As (req) 1327 mm2/m As (req) 1327 mm2/m
T16 @ 151.56 mm T16 @ 151.56 mm
Φ 12 mm Φ 12 mm
ULS 1055 mm2/m ULS 653 mm2/m
Tensile 578 mm2/m Tensile 578 mm2/m
Thermal 995 mm2/m Thermal 995 mm2/m
As (req) 1055 mm2/m As (req) 995 mm2/m
T12 @ 107.16 mm T12 @ 113.67 mm
Inner Outer
Φ 12 mm Φ 12 mm
ULS 288 mm2/m ULS 255 mm2/m
Thermal 663 mm2/m Thermal 663 mm2/m
As (req) 663 mm2/m As (req) 663 mm2/m
30 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Φ 12 mm Φ 12 mm
ULS 1000 mm2/m ULS 488 mm2/m
Tensile 383 mm2/m Tensile 383 mm2/m
Thermal 663 mm2/m Thermal 663 mm2/m
As (req) 1000 mm2/m As (req) 663 mm2/m
T12 @ 113.05 mm T12 @ 170.51 mm
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
31 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Es = 205 kN/mm2
Ec = 14 kN/mm2
Vertical R/F
Dis. Base m Base 1.25 2.5 3.9 Top
Wall Thick. mm 450 450 450 300 300
R/F Dia mm 16 16 16 12 12
Spacing mm 125 125 125 125 125
Cover mm 50 50 50 50 50
M kNm/m 100.70 25.90 18.20 14.90 6.00
ae 14.64 14.64 14.64 14.64 14.64
t mm 450 450 450 300 300
b mm 1000 1000 1000 1000 1000
d mm 380 380 380 232 232
As Prov mm2/m 1608 1608 1608 905 905
ρ 0.0042 0.0042 0.0042 0.0039 0.0039
(x/d) 0.296 0.296 0.296 0.286 0.286
x mm 112.30 112.30 112.30 66.27 66.27
z mm 342.57 342.57 342.57 209.91 209.91
fs N/mm2 182.75 47.00 33.03 78.45 31.59
fct N/mm2 5.24 1.35 0.95 2.14 0.86
ε1 0.0011 0.0003 0.0002 0.0005 0.0002
ε2 0.0004 0.0004 0.0004 0.0006 0.0006
εm 0.0007 -0.0001 -0.0002 -0.0001 -0.0004
acr 88.86 85.84 77.27 77.92 77.92
cmin 50 50 50 50 50
NO
w 0.15 NO NO NO
Cracking
32 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
33 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Inner Outer
Φ 16 mm Φ 16 mm
As Req 1327 mm2/m As Req 1327 mm2/m
As Prov 1340 mm2/m As Prov 1340 mm2/m
T10 @ 150 mm T10 @ 150 mm
Φ 12 mm Φ 12 mm
As Req 1055 mm2/m As Req 995 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
Inner Outer
34 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Φ 12 mm Φ 12 mm
As Req Err:504 mm2/m As Req Err:504 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
Φ 12 mm Φ 12 mm
As Req Err:504 mm2/m As Req Err:504 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
35 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
The critical conditions occurs when the tank is filled with water. All the walls
are assumed to be cantilevered walls. The base slab at the wall-base junction
should be design to resist the moment that comes from the wall base.
Assuming,
Cover = 50 mm
Thickness of Wall = 250 mm
36 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
M11 M22
BS 8110 Hogging Sagging Hogging Sagging
part-1
Cl.3.4.4.4 M kNm/m 29.64 4.21 31.34 1.74
b mm 1000 1000 1000 1000
t mm 250 250 250 250
d mm 194 194 182 182
fcu N/mm2 35 35 35 35
fy N/mm2 460 460 460 460
M/bd fcu 2
0.0225 0.0032 0.0270 0.0015
k 0.0225 0.0032 0.0270 0.0015
k' 0.156 0.156 0.156 0.156
z mm 189.02 193.31 176.36 181.70
0.95d mm 184.30 184.30 184.30 172.90
Zcorrect mm 184.30 176.36 172.90 172.90
x mm 21.56 39.20 20.22 20.22
As(req) mm2/m 402 60 453 25
37 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
ρ = As/bh = 0.004422
As = 553 mm2/m
Φ 12 mm Φ 12 mm
ULS 402 mm2/m ULS 453 mm2/m
Thermal 553 mm2/m Thermal 553 mm2/m
Select: Select:
T12 @ 150 mm T12 @ 150 mm
Φ 12 mm Φ 12 mm
ULS 60 mm2/m ULS 25 mm2/m
Thermal 553 mm2/m Thermal 553 mm2/m
Select: Select:
T12 @ 150 mm T12 @ 150 mm
38 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
-------{4}
-------{5}
Es = 205 kN/mm2
Ec = 14 kN/mm2
M11 M22
Hogging Sagging Hogging Sagging
R/F Dia mm 12 12 12 12
Spacing mm 150 150 150 150
Cover mm 50 50 50 50
M kNm/m 18.48 2.33 23.16 1.05
ae 14.64 14.64 14.64 14.64
t mm 250 250 250 250
b mm 1000 1000 1000 1000
d mm 194 194 182 182
As Prov mm2/m 754 754 754 754
ρ 0.0039 0.0039 0.0041 0.0041
(x/d) 0.29 0.29 0.29 0.29
x mm 55.33 55.33 53.31 53.31
z mm 175.56 175.56 164.23 164.23
fs N/mm2 139.61 17.60 187.03 8.48
fct N/mm2 3.80 0.48 5.29 0.24
ε1 0.0010 0.0001 0.0014 0.0001
ε2 0.0006 0.0006 0.0006 0.0006
εm 0.0004 -0.0005 0.0007 -0.0006
acr 95.24 87.60 87.60 87.60
cmin 50 50 50 50 Adquate for
NO NO Crack width
w 0.072 0.142
Cracking Cracking
39 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Φ 12 mm Φ 12 mm
As Req 553 mm2/m As Req 553 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T12 @ 150 mm T12 @ 150 mm
Φ 12 mm Φ 12 mm
As Req 553 mm2/m As Req 553 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T12 @ 150 mm T12 @ 150 mm
40 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
41 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Effective length lx = 0 mm
Effective heigth ly = 0.25 mm
lx / ly = 0.00 < 2
Two way Spaning
1.1.1 Analysis
(a). Both back wask tank and the clear water reservoir is covered with the
Wall-A. Wall-F is also connected to the wall-A at 5.5m from Grid-A
(b). As the pump house is located on top of the back wash tank, the effect
from pump house is also concidered for the design.
24 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
25 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Assuming,
Cover = 50 mm
Thickness of Wall
Base to 2.8m height = 450 mm
2.8m height to top = 300 mm
Vertical Reinforcement
Base to 2.8m height = 16 mm φ Bars
2.8m height to top = 12 mm φ Bars
26 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8110
References Description Output
part-1
Cl.3.4.4.4 M kNm/m 69.10 12.50 23.70 20.20 21.80 6.80
b mm 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00
t mm 450.00 450.00 300.00 300.00 300.00 300.00
R/F Dia mm 16.00 16.00 16.00 12.00 12.00 12.00
d mm 380.00 380.00 230.00 232.00 232.00 232.00
fcu N/mm2 35.00 35.00 35.00 35.00 35.00 35.00
fy N/mm2 460.00 460.00 460.00 460.00 460.00 460.00
M/bd fcu 2
0.014 0.002 0.013 0.011 0.012 0.004
k 0.014 0.002 0.013 0.011 0.012 0.004
k' 0.156 0.156 0.156 0.156 0.156 0.156
z mm 374.14 378.95 226.68 229.20 228.98 231.07
0.95d mm 361.00 361.00 218.50 220.40 220.40 220.40
Zcorrect mm 361.00 218.50 218.50 220.40 220.40 220.40
x mm 42.22 358.89 25.56 25.78 25.78 25.78
As(req) mm2/m 478 143 271 229 247 77
No of Bars Nos. 3 1 2 3 3 1
Spacing mm 333 1000 500 333 333 1000
Selected Spacing 125 125 125 125 125 125
Vertical Reinforcement
Base to 2.8m height = 16 mm φ Bars
2.8m height to top = 12 mm φ Bars
Horizontal Reinforcement = 12 mm φ Bars
27 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
28 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Thermal Zone φ ρ As
12 0.0044 995
225 16 0.0059 1327
20 0.0074 1658
12 0.0044 663
150 16 0.0059 884
20 0.0074 1106
29 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Inner Outer
Φ 16 mm Φ 16 mm
ULS 976 mm2/m ULS 478 mm2/m
Thermal 1327 mm2/m Thermal 1327 mm2/m
As (req) 1327 mm2/m As (req) 1327 mm2/m
T16 @ 151.56 mm T16 @ 151.56 mm
Φ 12 mm Φ 12 mm
ULS 1069 mm2/m ULS 826 mm2/m
Tensile 688 mm2/m Tensile 688 mm2/m
Thermal 995 mm2/m Thermal 995 mm2/m
As (req) 1069 mm2/m As (req) 995 mm2/m
T12 @ 105.82 mm T12 @ 113.67 mm
Inner Outer
Φ 12 mm Φ 12 mm
ULS 229 mm2/m ULS 271 mm2/m
Thermal 663 mm2/m Thermal 663 mm2/m
As (req) 663 mm2/m As (req) 663 mm2/m
30 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Φ 12 mm Φ 12 mm
ULS 1028 mm2/m ULS 844 mm2/m
Tensile 383 mm2/m Tensile 383 mm2/m
Thermal 663 mm2/m Thermal 663 mm2/m
As (req) 1028 mm2/m As (req) 844 mm2/m
T12 @ 110 mm T12 @ 134 mm
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
31 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Es = 205 kN/mm2
Ec = 14 kN/mm2
Vertical R/F
Dis. Base m Base 1.25 2.5 3.9 Top
Wall Thick. mm 450 450 450 300 300
R/F Dia mm 16 16 16 12 12
Spacing mm 125 125 125 125 125
Cover mm 50 50 50 50 50
M kNm/m 100.90 31.20 21.50 14.90 6.80
ae 14.64 14.64 14.64 14.64 14.64
t mm 450 450 450 300 300
b mm 1000 1000 1000 1000 1000
d mm 380 380 380 232 232
As Prov mm2/m 1608 1608 1608 905 905
ρ 0.0042 0.0042 0.0042 0.0039 0.0039
(x/d) 0.296 0.296 0.296 0.286 0.286
x mm 112.30 112.30 112.30 66.27 66.27
z mm 342.57 342.57 342.57 209.91 209.91
fs N/mm2 183.12 56.62 39.02 78.45 35.80
fct N/mm2 5.25 1.62 1.12 2.14 0.98
ε1 0.0011 0.0003 0.0002 0.0005 0.0002
ε2 0.0004 0.0004 0.0004 0.0006 0.0006
εm 0.0007 -0.0001 -0.0002 -0.0001 -0.0003
acr 88.86 85.84 77.27 77.92 77.92
cmin 50 50 50 50 50
NO
w 0.15 NO NO NO
Cracking
32 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
33 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Inner Outer
Φ 16 mm Φ 16 mm
As Req 1327 mm2/m As Req 1327 mm2/m
As Prov 1340 mm2/m As Prov 1340 mm2/m
T10 @ 150 mm T10 @ 150 mm
Φ 12 mm Φ 12 mm
As Req 1069 mm2/m As Req 995 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
Inner Outer
34 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Φ 12 mm Φ 12 mm
As Req Err:504 mm2/m As Req Err:504 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
Φ 12 mm Φ 12 mm
As Req Err:504 mm2/m As Req Err:504 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T10 @ 150 mm T10 @ 150 mm
The critical conditions occurs when the tank is filled with water. All the walls
are assumed to be cantilevered walls. The base slab at the wall-base junction
should be design to resist the moment that comes from the wall base.
35 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
The critical conditions occurs when the tank is filled with water. All the walls
References are assumed to be cantilevered walls.
Description
The base slab at the wall-base junction Output
should be design to resist the moment that comes from the wall base.
Assuming,
Cover = 50 mm
Thickness of Wall = 250 mm
Reinforcement Dia = 12 mm φ Bars
M11 M22
BS 8110 Hogging Sagging Hogging Sagging
part-1
Cl.3.4.4.4 M kNm/m 29.64 4.21 31.34 1.74
b mm 1000 1000 1000 1000
t mm 250 250 250 250
d mm 194 194 182 182
fcu N/mm2 35 35 35 35
fy N/mm2 460 460 460 460
M/bd fcu 2
0.0225 0.0032 0.0270 0.0015
k 0.0225 0.0032 0.0270 0.0015
k' 0.156 0.156 0.156 0.156
z mm 189.02 193.31 176.36 181.70
0.95d mm 184.30 184.30 184.30 172.90
Zcorrect mm 184.30 176.36 172.90 172.90
x mm 21.56 39.20 20.22 20.22
As(req) mm2/m 402 60 453 25
36 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
ρ = As/bh = 0.004422
As = 553 mm2/m
Φ 12 mm Φ 12 mm
ULS 402 mm2/m ULS 453 mm2/m
Thermal 553 mm2/m Thermal 553 mm2/m
Select: Select:
T12 @ 150 mm T12 @ 150 mm
Φ 12 mm Φ 12 mm
ULS 60 mm2/m ULS 25 mm2/m
Thermal 553 mm2/m Thermal 553 mm2/m
Select: Select:
T12 @ 150 mm T12 @ 150 mm
37 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
-------{4}
-------{5}
Es = 205 kN/mm2
Ec = 14 kN/mm2
M11 M22
Hogging Sagging Hogging Sagging
R/F Dia mm 12 12 12 12
Spacing mm 150 150 150 150
Cover mm 50 50 50 50
M kNm/m 18.48 2.33 23.16 1.05
ae 14.64 14.64 14.64 14.64
38 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Φ 12 mm Φ 12 mm
As Req 553 mm2/m As Req 553 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T12 @ 150 mm T12 @ 150 mm
Φ 12 mm Φ 12 mm
As Req 553 mm2/m As Req 553 mm2/m
As Prov 754 mm2/m As Prov 754 mm2/m
T12 @ 150 mm T12 @ 150 mm
39 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
40 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
The critical conditions occurs when the tank is filled with water. All the walls
are assumed to be cantilevered walls. The base slab at the wall-base junction
should be design to resist the moment that comes from the wall base.
Assuming,
Cover = 75 mm
Thickness of Wall = 700 mm
Reinforcement Dia = 25 mm φ Bars
M11 M22
BS 8110 Hogging Sagging Hogging Sagging
part-1 M kNm/m 844.00 326.00 551.00 308.00
Cl.3.4.4.4 Dia. mm 25 20 25 20
b mm 1000 1000 1000 1000
t mm 700 700 700 700
d mm 612.5 615 587.5 595
fcu N/mm2 35 35 35 35
fy N/mm2 460 460 460 460
M/bd fcu 2
0.0643 0.0246 0.0456 0.0249
k 0.0643 0.0246 0.0456 0.0249
k' 0.156 0.156 0.156 0.156
z mm 565.08 597.68 556.04 578.09
0.95d mm 581.88 581.88 584.25 558.13
Zcorrect mm 565.08 556.04 556.04 558.13
x mm 105.37 131.02 69.91 81.94
As(req) mm2/m 3732 1465 2476 1379
NO of Bars No 8 3 5 3
24 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
ρ = As/bh = 0.00737
As = 2580 mm2/m
Φ 25 mm Φ 25 mm
ULS 3732 mm2/m ULS 2476 mm2/m
Thermal 2580 mm2/m Thermal 2580 mm2/m
Select: Select:
T25 @ 150 mm T25 @ 150 mm
Φ 25 mm Φ 25 mm
ULS 1465 mm2/m ULS 1379 mm2/m
25 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
-------{4}
-------{5}
Es = 205 kN/mm2
Ec = 14 kN/mm2
M11 M22
26 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Φ 25 mm Φ 25 mm
As Req 3732 mm2/m As Req 2580 mm2/m
As Prov 3272 mm2/m As Prov 3272 mm2/m
T12 @ 150 mm T12 @ 150 mm
Φ 25 mm Φ 25 mm
27 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
28 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
The critical conditions occurs when the tank is filled with water. All the walls
are assumed to be cantilevered walls. The base slab at the wall-base junction
should be design to resist the moment that comes from the wall base.
Assuming,
Cover = 75 mm
Thickness of Wall = 700 mm
Reinforcement Dia = 25 mm φ Bars
M11 M22
BS 8110 Hogging Sagging Hogging Sagging
part-1 M kNm/m 844.00 326.00 551.00 308.00
Cl.3.4.4.4 Dia. mm 25 20 25 20
b mm 1000 1000 1000 1000
t mm 700 700 700 700
d mm 612.5 615 587.5 595
fcu N/mm2 35 35 35 35
fy N/mm2 460 460 460 460
M/bd fcu 2
0.0643 0.0246 0.0456 0.0249
k 0.0643 0.0246 0.0456 0.0249
k' 0.156 0.156 0.156 0.156
z mm 565.08 597.68 556.04 578.09
0.95d mm 581.88 581.88 584.25 558.13
Zcorrect mm 565.08 556.04 556.04 558.13
x mm 105.37 131.02 69.91 81.94
As(req) mm2/m 3732 1465 2476 1379
NO of Bars No 8 3 5 3
24 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
ρ = As/bh = 0.0092125
As = 3224 mm2/m
Φ 25 mm Φ 25 mm
ULS 3732 mm2/m ULS 2476 mm2/m
Thermal 3224 mm2/m Thermal 3224 mm2/m
Select: Select:
T25 @ 150 mm T25 @ 150 mm
Φ 25 mm Φ 25 mm
ULS 1465 mm2/m ULS 1379 mm2/m
25 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
-------{4}
-------{5}
Es = 205 kN/mm2
Ec = 14 kN/mm2
M11 M22
26 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
Note:
Maximum Crack width is 0.2 mm
Φ 25 mm Φ 25 mm
As Req 3732 mm2/m As Req 3224 mm2/m
As Prov 3272 mm2/m As Prov 3272 mm2/m
T12 @ 150 mm T12 @ 150 mm
Φ 25 mm Φ 25 mm
27 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Inlet Chamber Date 7/7/2017
28 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Platform Slab Date 7/7/2017
6.1 Analysis
Assuming,
Cover = 50 mm
Thickness of Wall = 150 mm
Reinforcement Dia = 10 mm φ Bars
M11 M22
BS 8110 Hogging Sagging Hogging Sagging
part-1
Cl.3.4.4.4 M kNm/m 2.67 0.30 2.52 0.70
b mm 1000 1000 1000 1000
t mm 150 150 150 150
d mm 95 95 85 85
fcu N/mm2 35 35 35 35
fy N/mm2 460 460 460 460
M/bd fcu 2
0.0085 0.0009 0.0100 0.0028
k 0.0085 0.0009 0.0100 0.0028
k' 0.156 0.156 0.156 0.156
z mm 94.10 94.90 84.05 84.74
0.95d mm 90.25 90.25 90.25 80.75
Zcorrect mm 90.25 84.05 80.75 80.75
x mm 10.56 24.34 9.44 9.44
As(req) mm2/m 74 9 78 22
75 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Platform Slab Date 7/7/2017
For φ = 10 mm
ρ = 0.003685 > ρ crit (0.0035)
ρ = As/bh = 0.003685
As = 276 mm2/m
Φ 10 mm Φ 10 mm
ULS 74 mm2/m ULS 78 mm2/m
Thermal 276 mm2/m Thermal 276 mm2/m
Select: Select:
T10 @ 150 mm T10 @ 150 mm
76 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Platform Slab Date 7/7/2017
BS 8007 -------{1}
Appendix B -------{2}
-------{3}
-------{4}
-------{5}
Es = 205 kN/mm2
Ec = 14 kN/mm2
77 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Platform Slab Date 7/7/2017
Φ 10 mm Φ 10 mm
As Req 276 mm2/m As Req 276 mm2/m
As Prov 523.6 mm2/m As Prov 523.6 mm2/m
T10 @ 150 mm T10 @ 150 mm
78 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Platform Slab Date 7/7/2017
79 of 91
80 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
Ground Roughness
CP 3: Chapter
V-2: 1972 Open country with no obstructions = 1 Class A
7.2
S2 = 0.88 [ h = 5m ]
S2 is selected more conservatively
Vs = 38x1x1x0.83 Vs = 38x1x1x0.88
-1
= 31.54 ms = 33.44 ms-1
q = k.Vs2 q = k.Vs2
79 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
80 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
BS 8110
part-1
Cl.3.4.4.4
81 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
82 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
83 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
84 of 91
YUNICA ENGINEERS & CONSULTANT Project Project Sign Board- Katunayake
No:157/2, Muibun Towers, Scheme
Dharmapala Mawatha ,Colombo - 07 Component Dessign Calculation Of Foundation Date
85 of 91
23/8/2017
Output
86 of 91
23/8/2017
Output
87 of 91
23/8/2017
Output
88 of 91
23/8/2017
Output
89 of 91
23/8/2017
Output
90 of 91
23/8/2017
Output
91 of 91
23/8/2017
Output
92 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
84 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
N/bh = 1.65
M/bh2 = 0.17
References
BS 8110: Description Output
Shear check not
Part 1 Shear is not critical required
Clause 3.8.4.6
βa = (1/2000)x(le/b')2
βa = 0.05
K = 1 Concervatively
au = βa Kh
au = 15.56 mm
86 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
N/bhfcu = 0.0432
Table 3.22 β = 0.95
Mx' = Mx + (β My h'/b')
= 4.29 kNm
N/bh = 1.08
M/bh2 = 0.21
87 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
88 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
89 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Columns Date 7/7/2017
90 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Beams Date 7/7/2017
Note: All the bending moment and shear force values are obtained
from the modal, analyzed by SAP2000
89 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Beams Date 7/7/2017
90 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Beams Date 7/7/2017
91 of 91
YUNICA ENGINEERS & CONSULTANT Project Wilgamuwa Heeganga Water Supply Project
No:157/2, Muibun Towers, Scheme Treatment Plant
Dharmapala Mawatha ,Colombo - 07 Component Areator - Beams Date 7/7/2017
92 of 91