Table 2. SUMMARY STATUS OF ENVIRONMENTAL IMPACT MANAGEMENT AND MONITORING PLAN IMPLEMENTATION

Sampling & Measurement Results


Environmental Standard EIS
Monitoring Objective Environmental Impact Monitoring Parameter Prediction
Envt'l Mgt. Measures Remarks
Aspect
Station/ Previous Current
Location

To ensure proper > Negative ● Regular asset


maintenance of CWD's Inefficient Maintenance and Hours of operational Pumping Impact condition
facilities operations operation of the breakdown stations monitoring by
system > Unlikely to CWD personnel
occur
> Reversible .● Regular maintenance
works for CWD.s
> Long term facilities and
equipment: Pumping
stations,pumps and
motors.
Pumping > Negative ● Mainteance of green
To ensure that CWD's Foul odor complaints station sites Impact belt zone and
facilities is free from Odor and perimeter > Unlikely to vegetation with
odor emission emission occur appropriate tree
> Reversible species

> Long term


Sampling & Measurement Results Remarks
Standard EIS
Monitoring Objective Environmental Aspect Environmental Impact Monitoring Parameter Station/ Previous Current Prediction
Envt'l Mgt. Measures
Location

To ensure that > Negative .Use of appropriatei


added noise created Noise Noise Pollution Noise complaints pumping No noise No noise Impact mounting for
during the operations from nearby station complaints complaints machinery to
will be minimized residents site and > Unlikely minimize vibrations
perimeter to occur

> Reversible . All mechanical/


electrical equipment
> Long term shall be installed
inside enclosures

> Insignificant .Maintenance of green


(Magnitude) belt zones and
vegetation with
appropriate tree
species
Sampling & Measurement Results Remarks
Environmental Standard EIS
Monitoring Objective Environmental Impact Monitoring Parameter Station/ Previous Current Prediction Envt'l Mgt. Measures
Aspect
Location

To anticipate the Environmental hazard Reliability Pumping No No > Negative . Adequate plans for
impact and implement Natural due to accidents, stations reported reported Impact environmental
contingency action Disasters man-made natural accidents accidents > Unlikely to rehabilitation and
plans disasters eg: fires, occur restoration of site
accidental spills, > Reversible and removal of
earthquake temporary structures
> Short term and facilities installed
> Insignificant during construction
( Magnitude) phase

.Safety precautions
such as lighting and
warning signs
around the construction
site

Monitor the volume Solid waste generated Volume of Waste Pumping . Solid waste generated
of solid waste within the facility Stations within the pumping
and by the facility stations will be minimal
but provision will be
made for garbage
collection

You might also like