CABLE HIGH POTENTIAL TEST REPORT

Usage purpose Auxiliary transformer Installation location GP3


1.Test Insulation Resistance:
Phase R-S、T、G S-R、T、G T-R、S、G
Before Test (GΩ)
After Test (GΩ)
Applied instrument: UT512 2500V Megger
2. Test DC withstand Voltage & Leakage Current:
12 18 24 24
Phase 6KV(1min)
KV(1min) KV(1min) KV(1min) KV(14min)
R-S、T、G (μA)
S-R、T、G (μA)
T-R、S、G (μA)
Applied instrument:
4.Test conclusion:

Tested Date Temperature

Date: Date: Date:


Prepared & Inspection: Approved By: Witnessed By:

PT.TRUBA JAYA ENGINEERING CNTIC PLN / JMK