You are on page 1of 2

COD PTE-PEF-30 Procedure

"Consortium
i atom
Pag. //din 22
Eneria, Energobi tehnica de
Page //of 22

executie
ROM
CONSTRUCT SJL
Executie lucrari subtraversari drumuri

Bucuresti -ediiia si revteia


SUBTRAVER in vigoare.
3.2. Amoriza^ - fasie de
SARI DRUMURI lenen ocupata de
elementele constructive
1.SCOP ale drumului in
^^^W^U^^^^^^^^WT •
sectiune transversala,
masurata in proiectie
1.1 Procedura are drept orizontala.
scop stabilirea metodelor 3.3. Cilindrare -
de lucru, succesiunii operatie de compactare
operatiilor, mijloacelor cu ajutorul
tehnice necesare pentru compactoarelor cu
executarea lucrarilor de
rulouri
subtraversari, verificarile
ce trebuie efectuate netede.
inainte, in timpul si dupa 3.4. Compactare -
executie. operatie de indesare a
pamintului sau a
materialului din stralurile
2
- POMEN1UL DE rutiere cu mijloace
APLICARE mecanice, pentru
reducerea volumului de
2.1. Procedura se aplica goluri si respectiv
Is executia lucrarilor de cresterea densitatii
subtraversari drumuri la aparente,
lucrarea exeuutata de S.C. 3.5. Consolidarsa
VIAROM CONSTRUCT patului drumului
SA Bucuresti, obiectiv: acUune de imbunatatire
,,Parc eolian Fantene/e, 3 capacitatii
Est, West". portante a teresamentelor
la nivelul patului
drumului.
3.
DEFINITI1S1PRESCU
RTAR1

3.1 Conform Manualului


Calilatii S.C. VIAROM
CONSTRUCT S.A,
3.3. Rolling -
ROAD compaction operation,
performed by means of
UNDERCR smooth vibrating
rollers.
OSSING 1. 3.5. Compaction -
operation of puddling
PURPOSE the ground or the
materials in the road
1.2. The procedure has as layers, performed by
ite purpose the means of mechanical
set up of work media, in order to
procedures, operations reduce the volume of
sequence, technical holes and respectively,
methods which are to increase the
necessary for the apparent density.
completion of 3.6. Formation level
undercrossing works, tests to consolidation - the
be performed action of improving the
previously, during and after bearing capacity of
the execution of the earthworks at the
the works. formation level.
2. SCOPE OF
APPLICATION

2.1, The procedure


is to be applied when
performing the road
undercrossing works
assigned to S.C.
VIAROM CONSTRUCT
S,A. Bucharest, with the
objective: H FantSnele
Windfarm, East,
West".
3,
_______________
DEFINITIONS
AND
ABBREVIATIONS:

3.1. According to the


Quality Manual issued by
S.C. VIAROM
CONSTRUCT S.A.
Bucharest - current edition
and revision, 3-2. Land take
- land strip occupied by the
constructive elements of
the road, considered as
to the cross section,
measured as to the horizontal
projection.