You are on page 1of 1

4M CHANGE MONITORING SHEET

MONTH: If there is any change during the shift mark it with Red If there is no change during the shift mark it with Green

DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB
MAN

AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB
MACHINE

AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB
MATERIAL

AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB
METHOD

Type of Change Customer approval Approved By


S.No. Date Department Shift Time Need For Change Action Taken Table No/Station No Setup Approval Reteroactive Active(Yes/NA) IPP Control Category Yes or NA Suspected Lot yes or NA Prod Sup Sign QA Sup Sign Plant Head Sign
(Planned/Unplanned/Abnormal) Required(Yes/NA) QA Head

You might also like