You are on page 1of 3

Phalaborwa - ZBS Upgrade Project

JOB CARD
Company

Area

Job Card Date


Activity Description
Job Card No.
Exact Location:

Hours HIRA Ref


Act. Plan Plan Budget Today's Time % Work SWP
DFL Men Spent to Name/s Start Time
No. Start Finish Hrs Hrs Finish Complete Complete
Date No.

Remarks: Recommendation/s:

Sup.Signed off: Foreman Signed off:


Phalaborwa - ZBS Upgrade Project
SAFE WORK PROCEDURE
COMPANY: S & D Consortium

REV. No. 0

TYPE OF WORK : SITE HUT ERECTION (PREFAB OFFICE) DATE: 5-Jun-01

RESULT OF EQUIPMENT OR CONTROLS JOB


STEP WHAT CAN CAUSE CAUSE, eg. EYE PPE TO BE (TESTS, CHECKS, OBSERVATION
Critical Activities COMMENTS
NO. INJURY / ILLNESS/ INJURY, LEG USED FOR PERMITS,
YES NO
DAMAGE LACERATION PREVENTION AUTHORISATION)
Overall, s/boots,
1 Level site Using incorrect tools Leg, hand, head gloves Operator self check
2 Lay out base as per drawing
Choice of incorrect Physical strain, All PPE as per
3 Lock joints tools property damage step 1 Operator self check
Identify & mark window / door
4 positions
Place one corner column and wall Choice of incorrect Physical strain, All PPE as per
5 panel in position tools property damage step 1 Operator self check
Place remaining columns, panels, Choice of incorrect Physical strain, All PPE as per
6 door and window frames tools property damage step 1 Operator self check
Choice of incorrect Physical strain, All PPE as per
7 Fit partition walls, frames as required tools property damage step 1 Operator self check Make sure panels fit

Hook ceiling Z shaped sections to Fall through/from Bruising, fractures All PPE as per Be aware of weak
8 walls roof or fatality step 1 areas of roof Make sure of connections

Fall through/from Bruising, fractures All PPE as per Be aware of weak


9 Erect and lock ceiling panels roof or fatality step 1 areas of roof

1. Activities to be listed according to type of work highlighted


2. Changes and/or recommendations to be noted depending on hazards in and/or around area of work
3. Employees to be informed of procedure and signed off in proof of training
4. Procedure to be attached to HIRA and Job Card completed for specific task
SAFE WORK PROCEDURE
COMPANY:

REV. No.

TYPE OF WORK : SITE HUT ERECTION (PREFAB OFFICE) DATE:

RESULT OF EQUIPMENT OR CONTROLS JOB


WHAT CAN CAUSE CAUSE, eg. EYE PPE TO BE (TESTS, CHECKS, OBSERVATION
STEP NO. Critical Activities COMMENTS
INJURY / ILLNESS/ INJURY, LEG USED FOR PERMITS,
YES NO
DAMAGE LACERATION PREVENTION AUTHORISATION)
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
10 Position roof gable halves roof or fatality step 1 roof
Be aware of
Secure roof beam at apex Fall through/from Bruising, fractures All PPE as per weak areas of
11 between gables roof or fatality step 1 roof
Slide in roof panels from R.H. Be aware of
side of gable. Lock panels to Fall through/from Bruising, fractures All PPE as per weak areas of
12 wall. roof or fatality step 1 roof Make sure panels lock
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
Interlock panels roof or fatality step 1 roof
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
13 Install ridging via clamps roof or fatality step 1 roof