Introduction
Case Study
Objective of the Study
Methodology of the Study
The Study Results
Conclusion
2
Introduction
Introduction
¾ Energy Consumption
in 2010 was
2,561 GWh
¾ 13% growth rate
(2009-2010)
¾ Energy demand
in 2021 was
20,717 GWh
¾ 19% growth rate
(2011-2021)
¾ Peak demand in
2021 was 3,570
MW
¾ 16.3% growth
rate (2011-2021)6
Objectives
Objectivesof
ofthe
theStudy
Study
Objectives
7
Methodology
Methodologyof
ofthe
theStudy
Study(1)
(1)
Collect
Collectthe
thetechnical
technicaldata
dataand
andoutage
outagerates
ratesof
oftransmission
transmissionsystem,
system,
the
thegenerating
generatingcapacity
capacityof ofeach
eachhydropower
hydropowerplant,
plant,and
and
load
loaddemand
demandforecast
forecastatateach
eachsubstation
substationininLao
LaoPDR
PDR
Conduct
Conductthe thesteady-state
steady-statepower
powerflow
flowanalysis
analysisfor
forLaos’
Laos’power
powersystems
systems
atatthe
thepeak
peakdemand
demandconditions
conditionsbased
basedon
onthe
theN-1
N-1contingency
contingencycriterion.
criterion.
Determine
DetermineMW Lossesfrom
MWLosses fromthe
thesteady-state
steady-statepower
powerflow
flowanalysis,
analysis,
as
aswell
wellas
asSAIFI,
SAIFI,SAIDI
SAIDIand ENSfrom
andENS fromthe
thetransmission
transmissionsystem
system
reliability
reliabilityassessment
assessment before
beforeand
andafter
afteradjusting
adjustingEDL’s
EDL’splan
plan
Make
Makethe
theeconomic
economicjustification
justificationbased
basedononthe EIRRsand
theEIRRs andB/C
B/C
ratiosof
ratios ofeach
eachadditional
additionalproject
project
Make
Makethe
theconclusion
conclusionand
andrecommendation
recommendationfor
foreach
eachadditional
additionalproject
project8
Methodology
Methodologyof
ofthe
theStudy
Study(2)
(2)
Economic Evaluation
(EIRRs and B/C ratios) of each Project
Cost
Not Stream
economically viable Benefit Stream
1) Capital Cost, and 1) System loss saving, and
2) Operation and maintenance 2) The Energy Not Supplied
costs (O&M) (ENS) reduced due to the
system reliability improvement
10
The
TheStudy
StudyResults
Results(2)
(2)
The single line diagram of the existing and future transmission lines in Lao 11
PDR for the years 2010-2020 with 2 additional transmission line projects.
The
TheStudy
StudyResults
Results(3)
(3)
Comparison Power Losses, Energy Not Supplied (ENS), SAIFI and
SAIDI Before and After Added 2 projects into System
Fiscal ∆P (Loss) ∆ENS ∆SAIFI ∆SAIDI
EIRR and B/C ratio of project after added 2 Projects into case study
Total
Total
Capital EIRR
Benefits B/C In horizon
Projects Costs
Ratio year
230kV Seno
134,400,000 282,952,038 6.22% 1.32 2015-2030
to Saravan
The EIRR and B/C ratio of additional projects are greater than the interest
rates of the World Bank’s loan (5%) and 1, respectively, the system
reinforcement with the project is feasible.
13
Conclusion
Conclusion