Power System Reliability Improvement

by 230kV Transmission Lines


Implementation

Presented by :
Mr. Phao Kongmany
Deputy Manager of System Planning office
Technical Department
Electricite Du Laos (EDL)

Advisor : Assoc. Prof. Dr. Suttichai Premrudeepreechacharn


Co-advisor : Mr. Kornkiat Charoenpatcharakij

In Technical and Academic Collaboration Project


Between Electricity Generating Authority of Thailand and
Electricite du Laos, and between: Electricity Generating Authority of
Thailand and Chiang Mai University of Thailand 1
Contents

™Introduction
™Case Study
™Objective of the Study
™Methodology of the Study
™The Study Results
™Conclusion

2
Introduction
Introduction

¾ The transmission planning is an important component of


power system planning
¾ The fundamental function of power system is to serve
electricity to customers continuously and high reliably at
minimum cost.
¾ The most fundamental function of power delivery system
is to deliver electricity between the generation point and
the demand point to meet load demand.
¾ The transmission planning criteria specify outage
conditions under which the system must meet future load
forecasts.
3
Case
CaseStudy
Study

¾ This study is Network in 2020


considered the 230kv
transmission system
development plan of
Lao PDR in
Corresponding to
Transmission System
Development Plan
2010-2020
Case
CaseStudy
Study(Cont.)
(Cont.)
Present Status

¾ Energy Consumption
in 2010 was
2,561 GWh
¾ 13% growth rate
(2009-2010)

¾ Peak Load in 2010


was 584 MW
¾ 12% growth rate
(2009-2010)
Case
CaseStudy
Study(Cont.)
(Cont.)
Electricity Demand Forecasts

¾ Energy demand
in 2021 was
20,717 GWh
¾ 19% growth rate
(2011-2021)

¾ Peak demand in
2021 was 3,570
MW
¾ 16.3% growth
rate (2011-2021)6
Objectives
Objectivesof
ofthe
theStudy
Study
Objectives

¾ To investigate the 230 kV transmission system development


plan of Electricite du Laos (EDL) specifically for the
transmission line projects in Lao PDR for the years 2010-2020,
based on the N-1 contingency criterion.

¾ To make the suggestion to adjust this plan in order to improve


the reliability of such regional networks for the given years
based on the transmission system reliability assessment and the
economic justification.

7
Methodology
Methodologyof
ofthe
theStudy
Study(1)
(1)
Collect
Collectthe
thetechnical
technicaldata
dataand
andoutage
outagerates
ratesof
oftransmission
transmissionsystem,
system,
the
thegenerating
generatingcapacity
capacityof ofeach
eachhydropower
hydropowerplant,
plant,and
and
load
loaddemand
demandforecast
forecastatateach
eachsubstation
substationininLao
LaoPDR
PDR

Conduct
Conductthe thesteady-state
steady-statepower
powerflow
flowanalysis
analysisfor
forLaos’
Laos’power
powersystems
systems
atatthe
thepeak
peakdemand
demandconditions
conditionsbased
basedon
onthe
theN-1
N-1contingency
contingencycriterion.
criterion.

Determine
DetermineMW Lossesfrom
MWLosses fromthe
thesteady-state
steady-statepower
powerflow
flowanalysis,
analysis,
as
aswell
wellas
asSAIFI,
SAIFI,SAIDI
SAIDIand ENSfrom
andENS fromthe
thetransmission
transmissionsystem
system
reliability
reliabilityassessment
assessment before
beforeand
andafter
afteradjusting
adjustingEDL’s
EDL’splan
plan

Make
Makethe
theeconomic
economicjustification
justificationbased
basedononthe EIRRsand
theEIRRs andB/C
B/C
ratiosof
ratios ofeach
eachadditional
additionalproject
project

Make
Makethe
theconclusion
conclusionand
andrecommendation
recommendationfor
foreach
eachadditional
additionalproject
project8
Methodology
Methodologyof
ofthe
theStudy
Study(2)
(2)
Economic Evaluation
(EIRRs and B/C ratios) of each Project

Cost
Not Stream
economically viable Benefit Stream
1) Capital Cost, and 1) System loss saving, and
2) Operation and maintenance 2) The Energy Not Supplied
costs (O&M) (ENS) reduced due to the
system reliability improvement

Economic Justification of Each Project


► If all of the corresponding EIRRs and B/C ratios of each additional
project are greater than the interest rates of the World Bank’s loan
and 1, respectively, the system reinforcement with the project will be
economically feasible.
9
The
TheStudy
StudyResults
Results(1)
(1)
Results

► In the steady-state power flow analysis for Laos’ power systems at


peak demand conditions for the years 2010-2020 based on the N-1
contingency criterion,
Two (2) additional transmission line projects for reinforcing
Laos’ systems were specified.

10
The
TheStudy
StudyResults
Results(2)
(2)

Two (2) Projects

The single line diagram of the existing and future transmission lines in Lao 11
PDR for the years 2010-2020 with 2 additional transmission line projects.
The
TheStudy
StudyResults
Results(3)
(3)
Comparison Power Losses, Energy Not Supplied (ENS), SAIFI and
SAIDI Before and After Added 2 projects into System
Fiscal ∆P (Loss) ∆ENS ∆SAIFI ∆SAIDI

years (kW/yr) (MWh/yr) (Occ/100 ckt-km/yr) (Hrs/100 ckt-km/yr)


2015 -1850 -6337 -9.6 -3.3
2016 -2845 -6396 -8.7 -2.9
2017 -3803 -6495 -8.4 -2.8
2018 -3978 -6634 -8.3 -2.8
2019 -3981 -6817 -8.1 -2.7
2020 -4096 -6027 -8.1 -2.7
2021 -5066 -9027 -8.1 -2.7
2022 -5066 -9027 -8.1 -2.7
2023 -5066 -9027 -8.1 -2.7
2024 -5066 -9027 -8.1 -2.7
2025 -5066 -9027 -8.1 -2.7
2026 -5066 -9027 -8.1 -2.7
2027 -5066 -9027 -8.1 -2.7
2028 -5066 -9027 -8.1 -2.7
2029 -5066 -9027 -8.1 -2.7 12
2030 -5066 -9027 -8.1 -2.7
The
TheStudy
StudyResults
Results(4)
(4)

EIRR and B/C ratio of project after added 2 Projects into case study

Total
Total
Capital EIRR
Benefits B/C In horizon
Projects Costs
Ratio year

(US$) (US$) (%)

230kV Seno
134,400,000 282,952,038 6.22% 1.32 2015-2030
to Saravan

The EIRR and B/C ratio of additional projects are greater than the interest
rates of the World Bank’s loan (5%) and 1, respectively, the system
reinforcement with the project is feasible.

13
Conclusion
Conclusion

►The results of the studies, power losses, energy not supplied


(ENS) are also reduced, system average interruption frequency
index (SAIFI) and system average interruption duration index
(SAIDI), are also improved.

► The economic internal rate of return (EIRR) of each project can


assist planers to make a reasonable discussion or determination to
reinforcement and expansion planning.

► The EIRR and benefit cost ratio of project are greater


interest of the World Bank’s loan (5%) and 1 respectively,
therefore, these projects should be installed in to transmission
system development plan of EDL, to improve the reliability of
supply are needed.