Project Logo Project Name : Marina Mix-50 @ Lusail District for Sh.
Hamad Bin Faisal Al Thani
Project No. : P-233 Form No.: P07-F06 /Rev. 0 / Nov. 2012 Client MEP SUB CONTRACTOR Consultant Contractor Sh. Hamad Bin Faisal Al Thani
COMMISSIONING FORM_Small Power Socket
Description: Area / Location : Work Inspection Request ( WIR ) Ref. No. Reference / Drawing: SI Report / Result Result Verified by: Remarks Inspection / Check Point RCC/HR/AA No. Date REDCO AEB Preview WIR and check pre-commissioning 1 form ,ensure all comments have been addressed Check pre-commissioning snag list is attached 2 and complete Preview and check all electrical test form, ensure 3 all comments have been addressed Functional Test: socket outlet, supply source 1&2, 4 confirm availability of power and polarity of each socket outlet IAW section 8.2.6 subsection e. Functional Test: socket outlet, supply source 1&2, confirm and record earth loop impedance and 5 prospective short circuit test IAW section 8.2.6 subsection d. Functional Test: Three phase socket , carry out 6 and verify the voltage of the power supply no. 1&2, phase to phase and phase to neutral. Functional Test: Three phase socket, supply source 1&2, confirm satisfactory completion of 7 prospective short circuit test IAW section 8.2.6 subsection d. Functional Test: Three phase socket, confirm / carry out and record the operation times of 8 residual current operated device IAW section 8.2.7 subsection e are satisfactory. Check the labeling and tagging and descriptive 9 identification 10 Check all equipment for damage Legend Accepted ( OK ) Rejected with remarks Not Applicable Comments
Inspected by: Checked by Approved by
Name Name Name Company Company Company Signature Signature Signature Date Date Date