HYDROGRAPHY SURVEY
ACTIVITIES AT PUTERI HARBOUR
PREPARED BY:
MUHAMMAD RIDHUAN BIN ABDUL RAHMAN
GLS 396- LAND SURVEY BASED
2017248694
LOCATION OF PROJECT
AIM & OBJECTIVES
OF THE PROJECT
AIM • Carry out Bathymetric survey and
detail survey.
• Produce bathymetric map
OBJECTIVES • Obtain position of by using DGPS
method.
• Carry out single beam sounding.
THEORY RELATED
TO THE PROJECT
WHAT IS HYDROGRAPHY?
Sounding • The datum which the field surveyor will establish and adopt.
Datum • Should be the same as chart datum, but may well differ.
CONTROLLER ECHO
GPS SOUNDER TRANSDUCER
• TWO CONTROL POINT CAN BE ESTABLISHED WITH AT LEAST 90% SKY VISIBILITY.
• CAN SETUP BASE STATION OR USING REFERENCE STATION.
• MOVE THE ROVER TO THE ESTABLISHED CONTROL POINTS.
• THE COORDINATE X,Y CAN BE PROVIDED IN REAL-TIME.
• THE ESTABLISHED CONTROL POINTS MUST CONNECTED TO AT LEAST 2 JUPEM BENCHMARKS
• THE HEIGHTING (Z) VALUE CAN BE PROVIDED IN THIS PROCEDURE.
TIDAL OBSERVATION
• RISE AND FALL MEASUREMENT TAKEN USING TAPE WITH (WEIGHTIER) PLUMBOB TIED AT IT.THIS
MEASUREMENT READING TAKEN SIMULTANEOUSLY WITH SOUNDING WORK. TIDE
MEASUREMENT IS STARTED WHEN THE BOAT IS READY TO DO THE SOUNDING.
• THE MEASURING TAPE WITH PLUMBOB DROP TO THE WATER SURFACE AND THE OBSERVER
ADJUST THE TAPE WHETHER UP OR DOWN.
• THE READING OF TIDE OBSERVATION READ FROM THE TAPE ON TBM STATION.
• THE INTERVAL OF READING TAKEN IS 10 MINUTES.
• ALL THE INSTRUMENTS FOR SOUNDING ARE READILY SET UP ON THE BOAT.
• ALL OF THE WORK PLANNED BY PROJECT MANAGER WILL BE STORED IN THUMB DRIVE.
• WHEN THE CONFIGURATION OF SOUNDING LINE APPEARED ON THE NOTEBOOK’S SCREEN, BOAT
MAN WILL USED IT AS GUIDANCE TO TAKE READING FOR EACH FIX ON SOUNDING LINE.
• MAKE SURE ALL THE SETTINGS IN ECHO SOUNDER ARE SUITABLE WITH THE JOB TO BE DONE.
• GPS RECEIVER MUST BE PUT PARALLEL WITH THE TRANSDUCER TO MAKE SURE THE POSITION AND
DEPTH OBTAINED ARE ON THE SAME POINT.
• . THERE ARE SEVERAL METHOD CAN BE USED TO TAKE A READING FOR EACH FIX WHERE WE CAN
USE TIME INTERVAL OR DISTANCE INTERVAL.
POSITIONING
• INTEGRITY CHECK FOR ALL GPS INSTRUMENTS SHALL BE CARRIED OUT WHERE THE
INSTRUMENT WILL BE SET UP ON KNOWN X AND Y STATION..
• GPS INSTRUMENT WILL BE CONNECTED TO LAPTOP.
• THE GPS ANTENNA AND RECEIVER WILL BE SET UP PROPERLY ON BOAT WHERE THE ANTENNA
WILL BE TIED UP PARALLEL TO THE TRANSDUCER.
• THE POSITIONING OF GPS STARTED SIMULTANEOUSLY WITH THE SOUNDING SURVEY.
• AS A RESULT, X, Y AND Z OF EACH FIX POINT WILL BE DETERMINED ON THE SAME TIME.
DETAIL SURVEY