DATE : 22 . 05 . 2009
SIEMENS ENERGY SECTOR SERVICES
Prepace :
Turbine Rotor :
1 Sandblasting of the whole blade and labyrinth section
2 Crack testing was nor performed according to RAPP demand
3 Rotor was set and aligned at lathe machine in RAPP workshop
4 Run out check was performed, Run out deflection was measured by 0,03mm before blade ro
5 All sealing strips between all 26 blade rows were changed
6 All sealing strips at balance piston 1,2 and 3 were replaced
7 All Sealing strips at front and rear labyrinth section were replaced
8 All new sealing strip was machined according the actual dimension check of the stator and la
9 Blade row no 25 and 26 : key blade fixation was modified in order to privent further keyblade
10 Shroudings of blade row 25 and 26 was remachined in order to remove axial and radial defle
11 Vibration measurement section was polished
12 Journal bearing front and rear side was polished
Axial Bearing :
1 Polishing of active and passive side axial bearing pads
2 Measurement of pad thickness, still in the design
3 Dye penetrates check, no findings
4 Re-assembly af axial bearing pads
HP ESV left and right side 34905.0 Following part was replaced :
1 Main closing spring Pos 6, Pilot valve with spring and closing plug
2 All seats were lapped and checked with blue print
3 Steam strainer cleaned from foreign particles
ESV actuator left and right side 42163.1 Following part was replaced :
1 New spindle Pos 4, Spring Pos 14, Piston Pos 5, bolt and nuts Pos 7, 8, 9 and 11, 12, 13, and
Assembly of Turbine :
Clearances of Turbine Rotor - GBC's and Labyrinths : GBC 1 Section :
Rotor Seal - Stator Shrouding Stator Seal - Rotor Shrouding
Section 1
Row Actual Design Actual
Design
Left Right Left
1 0,80 0,70 0,85 0,80 0,80
1 2 0,80 0,70 0,85 0,80 0,80
3 0,80 0,70 0,85 0,80 0,80
1 0,80 0,70 0,85 0,80 0,80
2 2 0,80 0,70 0,85 0,80 0,80
3 0,80 0,70 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
3 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
4 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
5 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
6 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
7 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
8 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
1 0,80 0,75 0,85 0,80 0,80
9 2 0,80 0,75 0,85 0,80 0,80
3 0,80 0,75 0,85 0,80 0,80
GBC 2 Section :
Rotor Seal - Stator Shrouding Stator Seal - Rotor Shrouding
Section 2 Row Actual Design Actual
Design
Left Right Left
1 0,80 0,85 0,75 0,80 0,85
2 0,80 0,85 0,75 0,80 0,85
10
3 0,80 0,85 0,75 0,80 0,85
4 0,80 0,85 0,75 0,80 0,85
1 0,80 0,85 0,75 0,80 0,85
11
2 0,80 0,85 0,75 0,80 0,85
11
3 0,80 0,85 0,75 0,80 0,85
4 0,80 0,85 0,75 0,80 0,85
1 0,80 0,85 0,70 0,80 0,85
2 0,80 0,85 0,70 0,80 0,85
12
3 0,80 0,85 0,70 0,80 0,85
4 0,80 0,85 0,70 0,80 0,85
1 0,80 0,85 0,75 0,80 0,80
2 0,80 0,85 0,75 0,80 0,80
13 3 0,80 0,85 0,75 0,80 0,80
4 0,80 0,85 0,75 0,80 0,80
5 0,80 0,85 0,75 0,80 0,80
1 0,80 0,85 0,75 0,80 0,80
2 0,80 0,85 0,75 0,80 0,80
14 3 0,80 0,85 0,75 0,80 0,80
4 0,80 0,85 0,75 0,80 0,80
5 0,80 0,85 0,75 0,80 0,80
1 0,80 0,80 0,75 0,80 0,80
2 0,80 0,80 0,75 0,80 0,80
15 3 0,80 0,80 0,75 0,80 0,80
4 0,80 0,80 0,75 0,80 0,80
5 0,80 0,80 0,75 0,80 0,80
GBC 3 Section :
Rotor Seal - Stator Shrouding Stator Seal - Rotor Shrouding
Section 3 Row Actual Design Actual
Design
Left Right 0,90 Left
1 0,90 0,80 0,85 0,90 0,95
2 0,90 0,85 0,85 0,90 0,95
16
3 0,90 0,85 0,85 0,90 0,95
4 0,90 0,80 0,85 0,90 0,95
1 0,90 0,85 0,85 0,90 0,90
2 0,90 0,85 0,85 0,90 0,90
17 3 0,90 0,85 0,85 0,90 0,90
4 0,90 0,85 0,85 0,90 0,90
5 0,90 0,85 0,85 0,90 0,90
1 0,90 0,80 0,85 0,90 0,95
18
2 0,90 0,80 0,85 0,90 0,95
18 3 0,90 0,80 0,85 0,90 0,95
4 0,90 0,80 0,85 0,90 0,95
5 0,90 0,80 0,85 0,90 0,95
GBC 4 Section :
Rotor Seal - Stator Shrouding Stator Seal - Rotor Shrouding
Section 4 Row Actual Design Actual
Design
Left Right 0,90 Left
1 0,90 0,90 0,90 0,90 0,90
2 0,90 0,90 0,90 0,90 0,90
19
3 0,90 0,90 0,90 0,90 0,90
4 0,90 0,90 0,90 0,90 0,90
1 0,90 0,85 0,90 0,90 0,90
2 0,90 0,85 0,90 0,90 0,90
20
3 0,90 0,85 0,90 0,90 0,90
4 0,90 0,85 0,90 0,90 0,90
1 0,90 0,85 0,90 0,90 0,90
2 0,90 0,85 0,90 0,90 0,90
21
3 0,90 0,85 0,90 0,90 0,90
4 0,90 0,85 0,90 0,90 0,90
1 0,90 0,90 0,90 0,90 0,90
2 0,90 0,90 0,90 0,90 0,90
22
3 0,90 0,90 0,90 0,90 0,95
4 0,90 0,90 0,90 0,90 0,90
1 0,90 0,95 0,85 0,90 0,95
2 0,90 0,95 0,85 0,90 0,90
23
3 0,90 0,95 0,85 0,90 0,90
4 0,90 0,95 0,85 0,90 0,90
1 0,90 0,95 0,85 0,90 0,95
2 0,90 0,95 0,85 0,90 0,90
24
3 0,90 0,95 0,85 0,90 0,90
4 0,90 0,95 0,85 0,90 0,90
1 0,90 0,95 0,85 0,90 0,95
2 0,90 0,95 0,85 0,90 0,90
25 3 0,90 0,95 0,85 0,90 0,95
4 0,90 0,95 0,85 0,90 0,90
25
Seal strip measurement gaps Oil Retaining Ring Radial and Axial
Radial Actual Axial Actual
Position Design Design
Left Right Left Right
HP 0,30 0,35 0,30 4,80 5,00 4,95
LP-inside 0,30 0,25 0,30 7,20 7,00 7,00
LP-outside 0,30 0,30 0,35 8,80 8,75 8,75
# Rotor axial movement without axial bearing towards generator from o-point
# Rotor axial movement without axial bearing towards front pedestal from o-point
# Total float Turbine Rotor Without Axial Bearing
# Coupling bolts between Turbine Rotor and Specer with Turning Gear Wheel In between was tightened to
# weight of new nut and old coupling bolts ( only 1 coupling bolt was replaced due to demaged bolt during d
# Coupling bolts between spacer and generator rotor was tightened with 1,750Nm according to Brush Instr
Load Test
# During commissioning alls safety interlock and trip criterion were tested ( over speed trip 3330 RPM )
# The overspeed test was carried out.
# The Turbine has been loaded up to 85 MW with and without bleeding in operation
# Load operation at Friday 22 may 2009 without any problems
# Turbine is steam and oil tight
# Shaft vibration axial and relative position of rotor and bearing temperatures are in good range
SIEMENS
Energy Services Sector
Nurnberg Germany Esso R4 Nbg2
Steam Turbine Serial No. 19308 was opened due to some major
zle welds, misalignment of front pedestal.
y 2009 :
completed good
no reguired good
completed good
ured by 0,03mm before blade row no. 1. completed good
completed good
completed good
completed good
ension check of the stator and labyrinth bushes completed good
order to privent further keyblade movement completed good
r to remove axial and radial deflections completed good
completed good
completed good
completed good
to RAPP, PT. demand not reguired good
nge was reworked after this check by hand completed good
completed good
ork was reguired completed good
for the calculation of the new rotor seals completed good
completed good
completed good
ck to round conditions completed good
p calculation completed good
completed good
completed good
completed good
p calculation completed good
completed good
completed good
p calculation completed good
completed good
completed good
completed good
completed good
completed good
completed good
P, PT. Workshop completed good
completed good
13 all O-ring, shaft sealing ring and gaskets. completed good
ember 2008, no spare spindles and cages were available at this time.
was replaced :
completed good
completed good
completed good
hs : GBC 1 Section :
eal - Rotor Shrouding
Actual
Right
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,75
0,80
0,80
0,80
0,85
0,85
0,85
0,85
0,85
0,85
h following values ;
was installed ) intoleransi
was installed ) intoleransi
intoleransi
2,60mm intoleransi
2,45mm intoleransi
5,05mm intoleransi
0,75mm intoleransi
0,50mm intoleransi
1,25mm intoleransi
0,67mm intoleransi
0,38mm intoleransi
1,05mm intoleransi
eel In between was tightened to reach an elongation 0f 0,45mm. New coupling nuts were assembled,
ced due to demaged bolt during dis-assembly ) were equalized.
- 30 RPM )
over speed trip 3330 RPM )