0 LOAD CALCULATIONS FOR THE BOX STRUCTURE


WEEP HOLES PROVIDED
2.1 DEAD LOAD
Self weight of the structure has been calculated directly in STAAD file by the comment "SELFWEIGHT -1".

2.2 SUPER IMPOSED DEAD LOAD


Wearing coat thickness = 0.420 m
2
Load (UDL) on top slab due to Wearing coat = = 10.500 kN/m
Ht of fill except wearing course EARTH CUSHION = 0.000 m
2
Load (UDL) on top slab due to earth cushion = = 0.000 kN/m
Wt of Parapet Wall/Crash Barrier = 10.00 kN/m
Wt of Safety kerb = 0.00 kN/m
Footpath Loading = 0.00 kN/m
2
Total UDL load due to S.I Dead Load = 4.0 kN/m

Load of PCC over inner bottom slab = 0.00 kN/m


Load of PCC over outer bottom slab = 0.00 kN/m

2.3 EARTH PRESSURE


Thickness of top slab = 0.35 m
Height of top haunch = 0.15 m
Clear height between top & bottom slab = 1.50 m
Height of bottom haunch = 0.15 m
Thickness of bottom slab = 0.38 m

Earth Pressure at Rest


Height from top Intensity of Earth pressure
(m) (KN/m2)
0.595 0.595 0.5 x 20 x 0.595 = 5.950
0.175 0.770 0.5 x 20 x 0.770 = 7.700
0.150 0.920 0.5 x 20 x 0.920 = 9.200
0.067 0.987 0.5 x 20 x 0.987 9.870
0.233 1.220 0.5 x 20 x 1.220 = 12.200
0.308 1.528 0.5 x 20 x 1.528 = 15.275
0.293 1.820 0.5 x 20 x 1.820 = 18.200
0.233 2.053 0.5 x 20 x 2.053 = 20.530
0.067 2.120 0.5 x 20 x 2.120 = 21.200
0.150 2.270 0.5 x 20 x 2.270 = 22.700
0.190 2.460 0.5 x 20 x 2.460 = 24.600

Earth Pressure submerged condition


Height from top Intensity of Earth pressure
(m) (KN/m2)
0.595 0.595 0.5 x 10 x 0.595 = 2.975
0.175 0.770 0.5 x 10 x 0.770 = 3.850
0.150 0.920 0.5 x 10 x 0.920 = 4.600
0.067 0.987 0.5 x 10 x 0.987 = 4.935
0.233 1.220 0.5 x 10 x 1.220 = 6.100
0.308 1.528 0.5 x 10 x 1.528 = 7.638
0.293 1.820 0.5 x 10 x 1.820 = 9.100
0.233 2.053 0.5 x 10 x 2.053 = 10.265
0.067 2.120 0.5 x 10 x 2.120 = 10.600
0.150 2.270 0.5 x 10 x 2.270 = 11.350
0.190 2.460 0.5 x 10 x 2.460 = 12.300

2.4 LIVE LOAD SURCHARGE


Equivalent height = 1.20 m
2
Uniform Intensity of loading (for submerged condition) = 1.2 x 0.5 x 10 = 6.00 kN/m
3
Uniform Intensity of loading (for dry condition) = 1.2 x 0.5 x 20 = 12.0 kN/m

2.5 BRAKING LOAD


Carriageway Live Load = 112.5 kN
Width of the box = 14.0 m
Braking Load = 8.0 kN/m
For SPV Loading = 0 kN
2.6 CALCULATING BRIDGE TEMPERATURE :
Maximum air shade temperature = 47.5 oC
Minimum air shade temperature = 2.5 oC
Bridge Temperature = 35.00 oC