Analysis of Rates DK Z DK Uke& Ftyk Kstuk 2015&16 Ds Vurzxr Xzke LQDDH Esa /Kjklw&Xaxks H Isny Ekxz FJXK K Ukes RKSD Esa Lkeidz Ekxkz DK Fuekz - Ka
Analysis of Rates DK Z DK Uke& Ftyk Kstuk 2015&16 Ds Vurzxr Xzke LQDDH Esa /Kjklw&Xaxks H Isny Ekxz FJXK K Ukes RKSD Esa Lkeidz Ekxkz DK Fuekz - Ka
J.E. A.E
DETAIL OF MEASUREMENT
dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr xzke lqDdh esa
/kjklw&xaxks=h iSny ekxZ fjxk;k ukes rksd esa LkEidZ ekXkZ dk
Sl. No. Item of work
fuekZ.kA
Unit No L. B. H/D Quantity
Excavation in Foundation for R/wall & B/wall in
all type of soils and rocks including lead, lift and
disposal of surplus material as per direction of
1 engineer-in -charge.
193095.91
Total :-
dk;Z dk uke& ftyk ;kstuk 2015&16 ds vUrZxr xzke lqDdh esa /kjklw&xaxks=h
iSny ekxZ fjxk;k ukes rksd esa LkEidZ ekXkZ dk fuekZ.kA
Si. No. Item of Work Amount
ftyk ;kstuk 2015&16 ds vUrZxr xzke >kyk
1 esa/kjklw xaxks=h iSny ekxZ josMh Hktu ukes
rksd esa lqj{kk nhokj A 193095.91
Contengency (LUM-SUM) 6904.09
Total :- 200000.00
Say :- 2.00 Lacs
Rate
Sl No Item Of Work Qty Unit Per
In Figure In Words
1 Excavation in Foundation for R/wall & B/wall in
all type of soils and rocks including lead, lift and
disposal of surplus material as per direction of 35.28 Cum Cum 291.20
Rs.TwO hundred ninty
engineer-in -charge. one only
I/we hereby agree to execute the above work..............……………….....................% above/below/at par the rates filled
as above.
2 I/We tender my/our rates as above after taking fully into consideration the specification, special condition of the department for
the above work and rate quoted above are inclusive of all leads, lifts, royalty, municipal and toll charges and other incidential
expenses.
3 I/ We give below my/ our permanent postal address, any change in the address shall be intimated by me/us time to
time in writing to the engineer in charge. We shall make necessary arrangement at all time to receive any notice,
orders and communications that will be issued and sent to me/ us at this address. If any letter, communication sent
to the contractor received back by department undelivered, it will be deemed to have been delivered to me/us and
the department will be free to take action in view of the same without intimating me/ us. For any claim whatsoever
on this account. .
Contractor