You are on page 1of 1

WELDING PARAMETERS INSPECTION REPORT FOR TANK

SHEEL / COURSE
CLIENT SOUTH ASIA PAKISTAN TEMINAL DOC NO.

PROJECT PAKISTAN DEEP WATER CONTAINER PORT PHASE-1 POWER HOUSE REV:

REF QIP NO._______________________________ QIP ITEM NO._6.9___________________ PAGE:


TANK NO. DRAWING NO. DATE:

S.# INSPECTION ITEM

1 BEFORE WELDING

1.1 WALL THICKNESS

FIT UP/ HI LO /ALIGMENT/ROOT


1.2 GAP/EDGE/BEVELLING

PLUMBNESS/PEAKING/BANDING
1.3 PERFORMED/CHECKED

WELDING EQUIPMENT CONFORMITY TO


1.4 WORK

1.5 PROTECTION AGAINST ADVERSE WEATHER

2 DURING WELDING

2.1 WELDING PARAMETER IMPLEMENTATION

2.2 ACCEPANCE OF WELDING LEG LENGTH

2.3 WELDER STAMP NO

3 AFTER WELDING

3.1 CLEANING

ARC STRIKE,CLEATES
3.2 REMOVAL,BUILD UP,DPT

QA / QC PETROCON QA/QC AEROROYCE JV HALCROW

NAME
DATE

SIGNATURE