“CONSTRUCTION OF ROAD FROM BISWANATHPUR TO KHARIKA [LENGTH: 12.101 KM]” Located within the area of Keshpur Block in the District of
Paschim Medinipur [Package No.-WB-20-
ADB-30 OF PMGSY 2007-08
A Pavment work:
Sl. No. Original Estimate Revised Estimate
Excess(+) Savings (-)
Description of Item Unit Quantity Rate [Rs.] Amount Measurement Quantity Amount % [Rs.] Remarks
[Rs.] [Rs.]
[Rs.] [Rs.]
1 Clearing and Grubbing Road Land
Clearing and Grubbing Road Land including
uprooting wild vegetation , Grass, bushes, shrubs,
sapling and tress of girth upto 300 mm. Removal of
stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m
including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical
Specification Clause 201.of specification of rural
roads.( 25% of area excluding drainage area)
i)Upto 600mm dia M 155.00 44.00 6820.00 155.900 6860.00 40.00 0.587
ii) 600 to 900 mm dia M 30.00 58.00 1740.00 45.000 2610.00 870.00 50.000
iii) Over 900mm dia M 35.00 100.00 3500.00 15.000 1500.00 -2000.00 -57.143
4 Excavation in cutting in soil by manual means
with lead upto 50m:
Excavation for roadway in soil using manual
means for carrying of cut earth to embankment sit
with a lift upto 1.5 m and upto 50m as per
technical Specification Clause 302.3
2573.00 31.00 79763.00 0 0.00 -79763.00 -100.00
5 Construction of Embankment with Materials
Obtained from Roadway Cutting:
Construction of embankment
with approved materials deposited at side from
roadway cutting and excavation from drain and
forundation of other structures, graded and
compacted to meet requirement of Tables 300.1
and 300.2 as per Technical Specification Clause
301.5 of specification of rural roads.
Primer Coat :
Providing and applying primer
coat with bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of
road surface and spraying primer at the rate of
0.70-1.0 kg/sqm using mechanical means as
per technical specification clause 502 of
specification of Rural Roads including lighting,
guarding, barricading etc. complete. 45485.74 28.15 1280423.00 44990.953 1266495.00 -13928.00 -1.088
i) 600 mm Equilateral Triangle Nos. 114.000 583.00 66462.00 64.000 37312.00 -29150.00 -43.860
ii) 600 mm Circular Nos. 117.000 583.00 68211.00 67.000 39061.00 -29150.00 -42.735
iii) 600 mm Square Nos. 9.000 1476.00 13284.00 9.000 13284.00 0.00 0.000
B4 Providing Intersection Improvement:
B4a)
Construction of (175mm thick) granular sub-
base (with laterite-sand) by providing well graded
Material grading 2. spreading in uniform layers
as per Technical Specification clause 401 &
Table No. 401 of Specification of Rural Roads.
C. ECOP WORKS
Original Estimate Revised Estimate
Excess(+) Savings (-)
Sl. No. Description of Item Unit Quantity Rate [Rs.] Amount Measurement Quantity Amount % [Rs.] Remarks
[Rs.] [Rs.]
[Rs.] [Rs.]
C1 Turfing with Sods:
Furnishing and lalying of the live soda of perennial
turf forming grass on embankment slope. Verges or
other lacations shown on the drawing or as directed by
the engineer including preparation of ground fetching
of sods and watering as per Technical Specification
Clause No. 309 of MORD.
i) 100 mm dia 4.0 m long bullah M 68.000 1133.00 77045.00 67.800 76817.00 -228.00 -0.296
ii) 150 mm dia 5.0m long bullah m 45.000 2304.00 103680.00 44.900 103450.00 -230.00 -0.222
Total:- 462758.00 504708.00 46627.00 -4677.00
============= ====================== =========
41950.00 0.00 41950.00 0.00 0.00 0.00
41950.00
G1(i) CROSS DRAINAGE WORKS FOR AGRICULTURE CONDUITS(1 x 450mm dia. – 18 Nos.)
(Ch- 487,1408,1765,3721,4385,4969,5225,5594,5642,5729,5968,6748,8925,9168,9565,9770,10091,11386)=18 Nos
G2(i) CROSS DRAINAGE WORKS FOR HUME PIPE CULVERT (1 x 1000mm dia. – 11 Nos.)
Chainage – 827m,2845m,3362m,4091m,5687m,7916m,9258m,9880m,10665m,11582m,11845m = 11 Nos
Sl. No. Original Estimate Revised Estimate
Excess(+) Savings (-)
Description of Item Unit Quantity Rate [Rs.] Amount Measurement Quantity Amount % [Rs.] Remarks
[Rs.] [Rs.]
[Rs.] [Rs.]
G2.1 Earth work in excavation upto 3.0 m depth in
ordinary soil for structures as per drawing and
technical Specification clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
materials disposal upto a lead of 50m, dressing
of sides and bottom and backfilling in trenches
with excavated suitable material, including cost
of lighting, barricading, protecting and bailing or
pumping out water etc. as required complete as
per Technical specification of Rural Roads.
G2(ii) CROSS DRAINAGE WORKS FOR HUME PIPE CULVERT (2 x 1000mm dia. – 5 Nos.)
Chainage- 606m,3953m,5081m,5402m,10225m= 5 Nos
Sl. No. Original Estimate Revised Estimate
Excess(+) Savings (-)
Description of Item % [Rs.] Remarks
[Rs.] [Rs.]
Sl. No.
Excess(+) Savings (-)
Description of Item Unit Quantity Rate [Rs.] Amount Measurement Quantity Amount % [Rs.] Remarks
[Rs.] [Rs.]
[Rs.] [Rs.]
G2.1 Earth work in excavation upto 3.0 m depth in
ordinary soil for structures as per drawing and
technical Specification clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
materials disposal upto a lead of 50m, dressing
of sides and bottom and backfilling in trenches
with excavated suitable material, including cost
of lighting, barricading, protecting and bailing or
pumping out water etc. as required complete as
per Technical specification of Rural Roads.
39034.00 39034.00
-66431.00 -66431.00
1001629.00 1001629.00
G2(v) CROSS DRAINAGE WORKS FOR SLAB CULVERT (1 x 4.000 m – 4 Nos. ) Ch- 726m,1186m,2300m,2632m= 4 Nos.
0.00
G3(iii) CROSS DRAINAGE WORKS FOR VENTED CAUSEWAY(3 x 1.00 m – 1 No.) ch-4590m
Sl. No. Original Estimate Revised Estimate
Excess(+) Savings (-)
Description of Item Unit Quantity Rate [Rs.] Amount Measurement Quantity Amount % [Rs.] Remarks
[Rs.] [Rs.]
[Rs.] [Rs.]
G3.1 Earth work in excavation upto 3.0 m depth in
ordinary soil for structures as per drawing and
technical Specification clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
materials disposal upto a lead of 50m, dressing
of sides and bottom and backfilling in trenches
with excavated suitable material, including cost
of lighting, barricading, protecting and bailing or
pumping out water etc. as required complete as
per Technical specification of Rural Roads.
-138483.00 -138483.00
0.00 0.00 0.00 0.00
G3(ii) CROSS DRAINAGE WORKS FOR MINOR BRIDGE(Length 2x7.5m – 1 no.) Ch- 6595m
Measure
Quantity Amount ment Quantity Amount
A) Hactor 12700.00 2.40 30480.00 2.410 30607.00 127.00 0.417
Cu.m 126.00 190.84 24046.00 596.732 75188.00 51142.00 212.684
Cu.m 299.00 76.50 22873.00 157.982 47237.00 24364.00 106.519
M 44.00 155.00 6820.00 155.900 6860.00 40.00 0.587
M 58.00 30.00 1740.00 45.000 2610.00 870.00 50.000
M 100.00 35.00 3500.00 15.000 1500.00 -2000.00 -57.14
Cu.m 31.00 2573.00 79763.00 0.000 0.00 -79763.00 -100.00
Cu.m 31.00 2573.00 79763.00 0.000 0.00 -79763.00 -100.00
Cum 81.40 19471.00 1584939.00 31850.627 2592641.00 1007702.00 63.580
Cum 116.00 4868.00 564688.00 7962.656 923668.00 358980.00 63.571
Cum 81.95 34993.00 2867676.00 30672.125 2513581.00 -354095.00 -12.35
Cum 116.95 8748.00 1023079.00 7668.031 896776.00 -126303.00 -12.35
Cu.m 619.00 8367.95 5179761.00 8366.401 5178802.00 -959.00 -0.019
Cu.m 2500.00 3411.43 8528578.00 3374.320 8435800.00 -92778.00 -1.09
Cu.m 2592.00 3411.43 8842426.00 3374.320 8746237.00 -96189.00 -1.09
Sqm 28.15 45485.74 1280423.00 44990.953 1266495.00 -13928.00 -1.09
Sqm 7.20 46015.50 331311.00 45334.303 326407.00 -4904.00 -1.48
Sqm 144.50 46015.50 6649239.00 45334.303 6550807.00 -98432.00 -1.48
Sqm 31.80 46015.50 1463293.00 45334.303 1441631.00 -21662.00 -1.48
Total 38564398.00 39036847.00 1443225.00 -970776
========== ========== ========== =========
472449.00 472449.00
Quoted
Sl. Rate Excess Savings
No. Item of work Unit (Rs.) Original Estimate Measure Revised Estimate (+)Rs. (-)Rs. % Remarks
Quantity Amount ment Quantity Amount
b) Sqm 65.00 127.500 8288.00 127.500 8288.00 0.00
No 505.00 487.000 245935.00 487.000 245935.00 0.00
Nos. 583.00 114.000 66462.00 64.000 37312.00 -29150.00
Nos. 583.00 117.000 68211.00 67.000 39061.00 -29150.00
Nos. 1476.00 9.000 13284.00 9.000 13284.00 0.00
Cu.m 619.00 73.500 45496.00 104.937 64956.00 19460.00
Cu.m 2500.00 31.500 78750.00 44.973 112433.00 33683.00
Cu.m 2592.00 31.500 81648.00 44.973 116570.00 34922.00
Sqm 28.15 420.000 11823.00 599.640 16880.00 5057.00
Sqm 7.20 420.000 3024.00 599.640 4317.00 1293.00
Sqm 144.50 420.000 60690.00 599.640 86648.00 25958.00
Sqm 31.80 420.000 13356.00 599.640 19069.00 5713.00
Total 696967.00 764753.00 126086.00 -58300
========= =========
67786.00 67786.00
Quoted
Sl. Rate Excess Savings
No. Item of work Unit (Rs.) Original Estimate Revised Estimate (+)Rs. (-)Rs. % Remarks
Measure
Quantity Amount ment Quantity Amount
G3(i) CROSS DRAINAGE WORKS FOR MINOR BRIDGE(Length 2x7.5mm – 1 no.) Ch-6349 m
AT Chainage-6.344 Km(6349m)
Cu.m 66.72 602.950 40229.00 1055.343 70412.00 30183.00 75.02796
Cu.m 43 52.460 2256.00 120.864 5197.00 2941.00 130.3635
Cu.m 436 76.940 33546.00 137.972 60156.00 26610.00 79.32391
Cu.m 3704 65.080 241056.00 56.208 208194.00 -32862.00 -13.6325
Cu.m 3559 372.100 1324303.00 407.905 1451734.00 127431.00 9.622496
Cu.m 3765 162.410 611474.00 152.950 575857.00 -35617.00 -5.82478
Cu.m 6053 83.400 504820.00 85.587 518058.00 13238.00 2.622321
MT 35000 5.830 204050.00 8.726 305410.00 101360.00 49.6741
No. 85.6 184.000 15750.00 120.000 10272.00 -5478.00 -34.781
M 200 19.000 3800.00 19.200 3840.00 40.00 1.052632
No. 1347 8.000 10776.00 12.000 16164.00 5388.00 50
Cum 665.7 15.930 10605.00 29.610 19711.00 9106.00 85.86516
Cum 2543 9.570 24337.00 0.000 0.00 -24337.00 -100
Cum 435 4.950 2153.00 0.000 0.00 -2153.00 -100
3029155.000 3245005.00 316297.00 -100447
215850.000 215850.00
Cross Drainage works extension of wings & Return for existing slab culvert at Different Chainage
Less or
Original Amount [Rs.] Total Excess [+] Savings [-]
Tender Revised Supplementary Amount [Rs.] Rs. Rs.
Sl. No. Description of Work Amount [Rs.] [Rs.] [Rs.]
A. Pavment work 38564398.00 39036847.00 39036847.00 1443225.00 -970776.00
B. Road Safety Works 696967.00 764753.00 764753.00 126086.00 -58300.00
C. Ecop Works 665397.00 665397.00 665397.00
D. Road Furniture works 141735.00 112265.00 112265.00 6830.00 -36300.00
E. Side Drainage Works 124689.00 124689.00 124689.00
F. Protective Works 462758.00 504708.00 504708.00 46627.00 -4677.00
G. Cross Drainage Work 17729317.00 17647771.00 17647771.00 3380764.00 -3462310.00
Total 58385261.00 58856430.00 58856430.00 5003532.00 -4532363.00
============ ============ =========== ============
251214 471169.00 471169.00
8576142
8901962
17729318
Abstruct of Cross Drainage work
[Package No.-WB-20-ADB-30 OF PMGSY 2007-08
Amount
Sl. No. Description of Imen
[Rs.]
1 CROSS DRAINAGE WORKS FOR AGRICULTURE CONDUITS(1 x 450mm dia. – 18 Nos.) 343376
2 CROSS DRAINAGE WORKS FOR HUME PIPE CULVERT (1 x 1000mm dia. – 11 Nos.) 1533350
3 CROSS DRAINAGE WORKS FOR HUME PIPE CULVERT (2 x 1000mm dia. – 5 Nos.) 1118987
4 CROSS DRAINAGE WORKS FOR SLAB CULVERT (1 x 1.50m – 1 No.) 387982
5 CROSS DRAINAGE WORKS SLAB CULVERT (1 x 2.0 m - 3 Nos) 1473784
6 CROSS DRAINAGE WORKS FOR SLAB CULVERT (1 x 4.000 m – 4 Nos. ) 3139275
7 CROSS DRAINAGE WORKS FOR SLAB CULVERT (1 x 6.000 m – 1 No. ) 0
8 CROSS DRAINAGE WORKS FOR VENTED CAUSEWAY(3 x 1.00 m – 1 No.) ch-4590m 1018978
9 CROSS DRAINAGE WORKS FOR VENTED CAUSEWAY (5 x 1.00 m – 1 No.) Ch-7300m 1269924
10 CROSS DRAINAGE WORKS FOR MINOR BRIDGE(Length 2x7.5m – 1 no.) Ch- 6595m 3875818
11 CROSS DRAINAGE WORKS FOR MINOR BRIDGE(Length 2x7.5mm – 1 no.) Ch-6349 m 3245005
12 CROSS DRAINAGE WORKS EXTENSION OF WINGS & RETURN FOR EXISTING SLAB
CULVERT AT DIFFERENT CHAINAGE 241292.00
Total amount 17647771
=============
Assistant Engineer
Sub-Assistant Engineer
W.B.S.R.D.A W.B.S.R.D.A Executive Engineer Superintending Engineer
Paschim W.B.S.R.D.A W.B.S.R.D.A
Medinipur Division- I Paschim Medinipur Division- I Paschim Medinipur Division- I Paschim Medinipur
Division- I
Abstract of Final Savings/ Excess Statement for "Construction & M aintenance of road for five years
from Biswanathpur to Kharika [LENGTH: 12.101 KM]” Located within the area of
Keshpur Block in the District of Paschim Medinipur
[Package No.-WB-20-ADB-30 OF PMGSY 2007-08
Original Length : 12.101 K.M.
Revised Length : 12.135 K.M.
Sl. Difference of
No As per Tender Provision Work to be Executed Amount Percentage
Name of Item Project Rate/ unit Amount Project Rate/ unit Amount Excess Savings (%) Remarks
length [Rs.] [Rs.] Length [Rs.] [Rs.] [Rs.] [Rs.] [Rs.]
(In Lakh) (In (In Lakh) (In Lakh)
Lakh) (In (In Lakh)
Lakh)
A. Pavment work 12.101 K.M. 385.64 12.135 K.M. 390.37 4.73 1.23
B. Road Safety Works 6.97 7.65 0.68 9.76
C. Ecop Works 6.65 6.65 0.00 0
D. Road Furniture works 1.42 1.12 -0.30 -21.13
E. Side Drainage Works 200 m 1.25 200m 1.25 0.00 0
F. Protective Works 4.63 5.05 0.42 9.07
Total 406.56 412.09 5.83 -0.30
====== ====== ======= ======
Continuee---next page
Agricultural conduits :
a)
Agricultural conduits (1x450mm
dia) 13 nos b)Hume pipe
culverts (1x1000mm dia)-4 Nos
c)Hume pipe culverts
(2x1000mm dia)-5 Nos
Superintending Engineer
Sub-Assistant Engineer Assistant Engineer W.B.S.R.D.A
W.B.S.R.D.A W.B.S.R.D.A Executive Engineer W.B.S.R.D.A Paschim Medinipur
Sub-Assistant Engineer Assistant Engineer
W.B.S.R.D.A W.B.S.R.D.A Executive Engineer W.B.S.R.D.A
Paschim Medinipur Division- I Paschim Medinipur Division- I Paschim Medinipur Division- I Division- I
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 260.355
b) 4 m span Slab culvert ( Ch.-2632m ) 248.989
c) 4 m span (Slab culvert Ch.-726m ) 258.615
d) 4 m span Slab culvert(Ch.2300m) 232.329
Total 1000.288
==========
2 Backfilling behind abutment wing wall, return wall as per technical specification clause 1204.3.8
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 63.205
b) 4 m span Slab culvert ( Ch.-2632m ) 63.205
c) 4 m span (Slab culvert Ch.-726m ) 63.205
d) 4 m span Slab culvert(Ch.2300m) 63.205
Total 252.820
3 Providing concrete(M-10) for plain Concrete in open foundation complete as per drawing and Technical
specification clause 802,803,1202 & 1203.
ii) PCC Grade-M10 Normal 1:3:6
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 17.641
b) 4 m span Slab culvert ( Ch.-2632m ) 15.693
c) 4 m span (Slab culvert Ch.-726m ) 16.231
d) 4 m span Slab culvert(Ch.2300m) 14.628
Total 64.193
=========
4 Providing concrete(M-15) for plain Concrete in open foundation complete as per drawing and Technical
specification clause 802,803,1202 & 1203.
ii) PCC Grade-M15 Normal 1:2:5:5
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 92.788
b) 4 m span Slab culvert ( Ch.-2632m ) 79.438
c) 4 m span (Slab culvert Ch.-726m ) 82.985
d) 4 m span Slab culvert(Ch.2300m) 72.414
Total 327.625
5 Providing concrete(M-15) for plain Concrete in substructure complete as per drawing and Technical specification
clause 802,803,1202 & 1203.
ii) PCC Grade-M15 Normal 1:2:5:5
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 87.971
b) 4 m span Slab culvert ( Ch.-2632m ) 52.719
c) 4 m span (Slab culvert Ch.-726m ) 61.472
d) 4 m span Slab culvert(Ch.2300m) 37.309
Total 239.471
==========
6 Providing concrete(M-25) for plain/ reinforced concrete in supersaturate complete for height upto 5m as per
drawing and Technical specification clause 802,804,805,1202 & 1204 of specification of Rural Roads including
curing complete
ii) PCC Grade-M25
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 20.784
b) 4 m span Slab culvert ( Ch.-2632m ) 20.784
c) 4 m span (Slab culvert Ch.-726m ) 20.784
d) 4 m span Slab culvert(Ch.2300m) 20.784
Total 83.136
===========
7 Supplying ,fitting and placing HYSD Bar Reinforcement in Substructure including cost of Steel Material and
carriage etc. complete as per Drawing and Technical Specification Clause 1002,1010 and 1202 of Specification of
Rural Roads.
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 1.7830
b) 4 m span Slab culvert ( Ch.-2632m ) 1.7246
c) 4 m span (Slab culvert Ch.-726m ) 1.7466
d) 4 m span Slab culvert(Ch.2300m) 1.6700
Total 6.9242
8 Providing Weep Holes in Brick masonry, Plain/ Reinforced concrete abutment, wing wall, return wall with 100mm
dia AC pipe extending through the full width of the structures with slope of 1(V):20 (H) towards drawing face
complete as per drawing.
Sl.
Description of Item Total Quantity
No.
a) 4 m span Slab culvert ( Ch.-1186m ) 30
b) 4 m span Slab culvert ( Ch.-2632m ) 36
c) 4 m span (Slab culvert Ch.-726m ) 35
d) 4 m span Slab culvert(Ch.2300m) 24
Total 125
===========
Abstruct of 2 m span Slab culvert Item Wise Total Quantity
ch- 3100m,6178m,11800m= 3 nos
1 Earth work in excavation upto 3.0 m depth in ordinary soil for structures as per drawing and
technical Specification clause 305.1 including setting out, construction of shoring and bracing,
removal of stumps and other deleterious materials disposal upto a lead of 50m, dressing of sides
and bottom and backfilling in trenches with excavated suitable material, including cost of lighting,
barricading, protecting and bailing or pumping out water etc. as required complete as per Technical
specification of Rural Roads.
Sl.
Description of Item Total Quantity
No.
2 Backfilling behind abutment wing wall, return wall as per technical specification clause 1204.3.8
Sl.
Description of Item Total Quantity
No.
3 Providing concrete(M-10) for plain Concrete in open foundation complete as per drawing and
Technical specification clause 802,803,1202 & 1203.
i) PCC Grade-M10 Normal 1:3:6
Sl.
Description of Item Total Quantity
No.
4 Providing concrete(M-15) for plain Concrete in open foundation complete as per drawing and
Technical specification clause 802,803,1202 & 1203.
ii) PCC Grade-M15 Normal 1:2:5:5
Sl.
Description of Item Total Quantity
No.
a) 2.0 m Span Slab Culvert (Chainage 6178 m) 59.782
b) 2.0 m Span Slab Culvert (Chainage 3.100 Km) 57.930
c) 2.0 m Span Slab Culvert (Chainage 11800 m) 52.979
Total 170.691
===========
5 Providing concrete(M-15) for plain Concrete in substructure complete as per drawing and
Technical specification clause 802,803,1202 & 1203.
ii) PCC Grade-M15 Normal 1:2:5:5
Sl.
Description of Item Total Quantity
No.
Sl.
Description of Item Total Quantity
No.
Sl.
Description of Item Total Quantity
No.
Sl.
Description of Item Total Quantity
No.