Contractor's REPORT NO. 004-20200823-69-SIWK-MARA-INSREPCON


Logo SCHOOL NAME: Mahendra Ma Vi kunchok
LOCATION: Indrawati Muncipality 2 Kunchok,Sindhupalchok
FORMWORK-REBAR AND CONCRETE INSPECTION FORM
Column laping @ level + 6000mm

Section : Column lapping @ +6000mm Recording No 7 Date : 8/23/2020


3-C-9 2-H-30 2-T3 1-CB 3-COMB-7 3-COMB-22A 3-COMB- 3-C-9 1-T5 1-T12 Under Ground water
Block Design 22B tank

Location of Pouring Column laping @ level of +6000mm


Related Drawings

Sn. Items Result Remarks


1 Formwork
1.1 Formwork material is acceptable
√ Iron formwork
1.1 Formwork shape, tightness and overall quality are
acceptable nut bolt is used to fasten

1.2 Cleaning is acceptable √
1.3 Levels and axes are acceptable
√ by sprit level
2 Rebar
2.1 Diameters , spacing , overlapping length , fixing are
acceptable √
2.2 Cleaning is acceptable √
2.3 Wire mesh (type,overlapping length etc) is acceptable √
2.4 Concrete cover is acceptable
√ COVER FOR COLUMN 40mm
2.5 Reqired Admixtures available at site to use
3 Anchor Bolt – Plate (Dimension, type , locations , elevation
,fixing) are acceptable
3.1 Waterstops are acceptable

3.2 Electrical, Mechanical installation
ME EL
4 Embeded Pipes , junction boxes are acceptable NA
4.1 Electrical and mechanical negatives are acceptable
NA
4.2 Cables, grounding are acceptable
NA
4.3 Leakage and impermeability Test for pipes are acceptable NA not done yet
4.4
5 Erection of scaffoldings are acceptable P
5.1 Safety Lines are acceptable P

Note: Appendix
Survey Photo P
Drawings P Attachment
Reinforcement Plan
√: Acceptable X: Unacceptable NA: Not Applicable
Contractor’s Representaive: DSC's Representative:
Name: Nawraj Lamsal Name: Sujit Kr Rasaily

Signature: Signature:

Date: 2020.08.23 Date: 2020.08.23

Note: Single Cross it Means The Work Will Not Be Accepted for Measurement Next Bill

DRSP_InspConc_Rev0
DISASTER RESILIENCE OF SHOOLS PROJECT (DRSP)
Contractor's REPORT NO: 004-20200823_69_SIWK_MARA_INSPECTION
Logo SCHOOL NAME: MAHENDRA MA.VI
LOCATION: Kunchok,Indrawati Rural Municipality, Sindhupalchowk.
REBAR & FORMWORK OF COLUMN @ level of +6000mm

Section : Column lapping @ level of +6000mm Recording No. 4 Date : 2020-07-24


Block Design 3-C-12 2-H-30 2-T3 1-CB 3-COMB-7 3-COMB-22A 3-COMB-22B 3-C-9 1-T5 1-T12 UG Water tank


Location of inspection Column Rebar lapping @ level of +6000mm

INSPECTION PHOTOS
FIELD PHOTO DRAWING

AREA Column rebar laping @ level of +6000mm AREA Column rebar laping @ level of +6000mm
EXPLANATION cutting length of type A stirrups for Column 10mm dia EXPLANATION Rebar of shearwall and bottom slab

AREA Column rebar laping @ + 6000mm AREA Column rebar laping @ level of +6000mm
EXPLANATION cutting length of type B stirrups @ 8 mm dia EXPLANATION typical details of Ties

AREA Column rebar laping @ level of +6000mm AREA Column Rebar Laping @ level of +6000mm
EXPLANATION Cutting of Rebar for Laping of Column 1,2,3& 4. @ level of+ EXPLANATION cutting length of laping rebar 6m @ top floor and other 3.15m

AREA Column laping @ level of +6000mm AREA Column laping @ level of + 6000mm
EXPLANATION alignment of Column laping Rebar @ level of +6000mm EXPLANATION typical Rebar laping details of column
AREA Column laping @ level of + 6000mm AREA column laping @ level of +6000mm
EXPLANATION casting of concrete on column EXPLANATION After Deshuttering,
COLUMN LAPING @ + 6000MM

dia Length
S.N Description SKETCH No
mm meter
Stirrups
1)
200x420 8 720 1.4
420x420 10 360 1.86
2) Column laping details

column1 16 8 3.15
column1 @ top floor 16 8 6
column2 16 8 3.15
column3 16 24 3.15
column3 @ top floor 16 8 6
column4 16 48 3.15
column4 @ top floor 16 16 6
00MM

total length unit weight total weight


Remark
m kg/m kg

1008 0.39 393.12


669.6 0.61 408.456

25.2 1.57 39.564


48 1.57 75.36
25.2 1.57 39.564
75.6 1.57 118.692
48 1.57 75.36
151.2 1.57 237.384
96 1.57 150.72
1538.22 Kg