Professional Documents
Culture Documents
JANUARY 09 2020
VEINS SHOULD
CONTINUE ACROSS
SLAB AS SHOWN
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
VEINS SHOULD
CONTINUE ACROSS
SLAB AS SHOWN
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
1
STONE VEIN DIRECTION GUIDELINE
JANUARY 09 2020
VEINS SHOULD BE
PARALLEL ACROSS
SLABS AND IN
DIAGONAL DIRECTION
AS SHOWN
DIAGONAL VEINS
DO NOT NEED TO
CONTINUE ACROSS
SLABS.
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
INSTALL STONES
IN CONSISTENT
DIRECTION
EXCLUDE AREAS OF
STONE WITH LARGE
AND OR DENSE
AREAS OF NATURAL
VARIATION
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
2
STONE VEIN DIRECTION GUIDELINE
JANUARY 09 2020
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
VEINS TO RUN
HORIZONTALLY
ALIGN VEINS
HORIZONTALLY
ACROSS SLABS AS
MUCH AS POSSIBLE
MATCH TONES
ACROSS SLABS
SLABS TO BE CUT
AND INSTALLED IN
SEQUENCE.
INSTALL BAMBOO
SLABS IN
CONTINUOUS ROWS
WITH NO VERTICAL
JOINTS
CALIBRATE START
AND END LOCATION
OF BAMBOO SLABS
(AS PER DIAGRAM) TO
ENSURE CONTINUITY
OF BAMBOO TEXTURE