Sontrach

Client:_____________ SLB designer: ________ Verified: _________ Date: 3/16/2009


___________ Rev-1.0
SWT Service Delivery Procedure ..\SWT SDP Rev-1.0
Revision 1.0 Well: _____________
A1-65/02 Sign: ______________ Sign: ___________ Client app:___________
Step number SWT SDP Help File

01 02 03 04 05 06 07 08
Client Job Assign Review
Process

All resources King Post & Identify Project


Request, Specialist/ Resources Perform
available and job Yes Rig Visit Boom Specific or Non-
Start SDP Engineer and and Technical HARC
feasible? Installation Standard Items
File Visit Client Feasibility
FSM, SQC,
FSM, EIC, EIC, Client, Rig,
Output / Action Input process or Personnel level

Sales, FSM, EIC, EIC, SDM, FSM, EIC,


FSM, EIC Supervisor Client, FE/FS, Client, Supervisor, FSM, EIC,
Supervisor, Client
required

Supervisor Supervisor SFE/ FS 2+ Supervisor


Design/Planning

No
Start Service Test Objectives Loop as needed
King Post Job
delivery job HARC Std Rig Design & Boom Questionnaire
file Fixed Asset Information Installation
Listing
document

Well Information Prepare alternative Guidelines


START SDP rd
plans (Hardware and/ Generic SWT Rig Visit Report
Approved 3 or timing changes to Rig Visit
Test Program HARC Report Boom Sheet
Communi- Party Vendors meet client needs)
Template Calculation
cations
LMS Manufacturing
document
Competency Local Job Verified List
Job
Document

Certification HARC Engineered &


Communication Log Questionnaire Exemption
Pressure Request Compliant Design Boom
Communication Operations Rigging List
Details Manual

09 10 11 12 13 14
Process

Review 3 rd Prepare
Pre-Selection Perform Final SWT Identify
Review Design Party or other Layout
SWT Architest Equipment Personnel Page-2
& Job checks Relevant Diagram &
Equipment Simulations Selection Requirement
for SWT Equipment P&ID
Output / Action Input process or Personnel level

FSM, EIC,
FSM, EIC, FSM, EIC, FSM, EIC, FSM, EIC, FSM, EIC,
SQC,
required

SFE/ FS2 + Supervisor SFE/ FS2 + SFE/ FS2 + Supervisor


Supervisor
Design/Planning

Pressure Job Pressure


Job Rig Visit Job Packing List Packing List
Operation Questionnaire Operations
Questionnaire Report Questionnaire Level 3 Level 3
Manual Manual
Packing List
document

Level 1 Rig Visit


Architest Test Program
Review Architest Report
Fixed Asset Report
SWT FOH 2 InTouch ARCHITEST Report
Listing - RITE Reference
contents Job
Page P&ID & Layout
Questionnaire
Communications Details Diagram
Architest Packing List
Relevant
Document

Packing List Report Level 2 Personnel


Equipment Contents into
Manuals Level 1 Planning Packing List
KPOD Exemption
Packing List Level 3 Level 4
Request