Alexandria university 4th Year

Faculty of Engineering Quality Control


Production Engineering Department 2016/2017-2nd Semester

Attribute Control Charts


1) Consider the data in the table given below, estimate the process standard deviation,
and then determine if the process is under control or not by constructing number of
nonconforming control chart. Note that, there are about one hundred assembly in
each sample is taken from the production.

Sample Number of nonconforming


number assemblies
1 10
2 11
3 11
4 12
5 9
6 9
7 8
8 7
9 9
10 8
11 10
12 11
13 12
14 9
15 7
16 7
17 6
18 2
19 7
20 8

2) Repeat the problem # 1, by constructing fraction of nonconforming control chart.

Eng. A. Sobhi, Eng. nesma. Page 1


Alexandria university 4th Year
Faculty of Engineering Quality Control
Production Engineering Department 2016/2017-2nd Semester

3) Construct number of nonconformities control chart for the following data given
below, and determine the process standard deviation, is it statistical control, and do
the revising method if it require this.

m n No. of m n No. of
imperfections imperfections
1 100 6 11 100 8
2 100 7 12 100 9
3 100 6 13 100 3
4 100 7 14 100 7
5 100 8 15 100 8
6 100 9 16 100 3
7 100 9 17 100 7
8 100 8 18 100 8
9 100 9 19 100 8
10 100 5 20 100 9

4) Construct number of nonconformities per unit control chart for the previous problem.