THE HINDU--VISAKHAPATNAM

HSD CONSUMPTION REPORT FOR THE MONTH OF FEBRUARY-2015


Gen Set Capacity Total Running in Total Units Total HSD Unit / Lt. Of HSD
In KVA Hours Generated in kwh Consumed in lts

1110KVA 7 608 160 3.8


140KVA 5 36 30 1.2
Total 12 644 190 3.38

HSD Stock Details:


Total HSD Consumed For Other Purposes NIL

Opening Stock Of HSD (1st of every month ) 2060 lts

Closing Stock Of HSD (31st of every month ) 1870 lts

Diesel Purchased in this month NIL

Total HSD Consumed 190 lts

Meter Reading:
Genset Capacity In KVA 1110 KVA 140KVA

Hour Meter Reading:


Initial Reading 2915.6 hrs 2218.4 hrs
Final Reading 2922.6 hrs 2223.4 hrs
Total Running Hours 7hrs 5hrs
Energy Meter Reading:
Initial Reading 335200 kwh 58422 kwh
Final Reading 335808 kwh 58458 kwh
Total Units Generated 608 units 36kwh
HSD CONSUMPTION REPORT OF GENERATOR

DATE RUNNING TIME IN DIESEL CONSUMPTION DIESEL USED IN DIESEL PURCHASED


MINUTES IN LTS FORK LIFTER
1110 KVA 140KVA 1110 KVA 140KVA
01/02/2015 0 0 0 0
02/02/2015 0 0 0 0
03/02/2015 0 0 0 0
04/02/2015 0 0 0 0
05/02/2015 0 0 0 0
06/02/2015 0 60 0 6
07/02/2015 0 0 0 0
08/02/2015 60 0 25 0
09/02/2015 0 0 0 0
10/02/2015 0 0 0 0
11/02/2015 0 0 0 0
12/02/2015 60 0 25 0
13/02/2015 0 60 0 6
14/02/2015 0 0 0 0
15/02/2015 0 0 0 0
16/02/2015 0 0 0 0
17/02/2015 0 0 0 0
18/02/2015 0 60 0 6
19/02/2015 0 60 0 6
20/02/2015 0 60 0 6
21/02/2015 0 0 0 0
22/02/2015 0 0 0 0
23/02/2015 0 0 0 0
24/02/2015 60 0 25 0
25/02/2015 0 0 0 0
26/02/2015 0 0 0 0
27/02/2015 240 0 85 0
28/02/2015 0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
TOTAL 420 300 160 30 NIL NIL

You might also like