You are on page 1of 1

Project : Dangote Refinery & Petro-chemical Project - COMPOSITE WORKS & CPP/ UTILITIES

EIL PROJECT NO: A545-680-16-43-PK-T-3007

REQUEST FOR INSPECTION

DORC Contract No. TR_0015_3007


To QA/QC Engineer (EIL/Dangote)
DORC Project No. A545-680-16-43-PK-T-3007

Request No. GTAPM/DORC/MECH/RFI/399


From QA/QC Engineer (GTAPM)
Inspection Requested Date & Time 08.00 AM 06-Oct-20

Signature: Inspection Required Date &Time 10.30 AM 06-Oct-20

Name: MOORTHY NATARAJ ITP Ref. / Procedure Ref. DORC/EIL/GTAPM/3007/ITP-0101 & ITP-0105

Date: 06-Oct-20 Drg./Doc. Ref. N/A

MECHANICAL Painting Piping Insulation GENERAL

Location: CPP-680

Please inspect the following : WITNESS HOLD


FIT-UP INSPECTION PLAN 06-10-2020
AREA PLAN UOM
1. A- ZONE 30 ID

2. B ZONE 0 ID

3. C ZONE 30 ID

4. D ZONE 20 ID

5.E ZONE 110 ID

6.F ZONE 0 ID

7.UB PIPING 117 ID

8.HRSG- (A TO D) 0 ID

9.HRSG-(E TO F) 95 ID

10.GTG- PIPING 10 ID
TOTAL 412 ID
WELD VISUAL INSPECTION PLAN 06-10-2020
AREA PLAN UOM
11. A- ZONE 100 ID
12.B ZONE 0 ID
13.C ZONE 100 ID
14.D ZONE 100 ID
15.E ZONE 250 ID
16.F ZONE 0 ID
17.UB PIPING 100 ID
18.HRSG PIPING 150 ID
19.GTG PIPING 60 ID
TOTAL 860 ID

20. HRSG-F IBD VENT PIPING MECHANICAL CLEARANCE INSPECTION

21.HRSG-A BD PUMP SUCTION & CONDENSATE TO IBD TANK HYDROTEST INSPECTION

22.UB -A MECHANICAL CLEARANCE INSPECTIONFOR BD-105 & CL-097

GTA POWERMECH EIL CONSTRUCTION

SIGN & DATE SIGN & DATE

Received by EIL/DORC Date: Time: Signature


EIL / DORC REMARKS

APPROVED REJECTED
GTA POWER MECH EIL/DORC

NAME :

DESIGNATION :

SIGNATURE :

DATE :
ATTACHNENT-5 (For Inspection Management and Coordination Procedure) Page 1of 1