3. Painting:
location Work progress Comments
CW pipe Checking and monitoring of Sand Blasting activity for CW pipes /
according to procedure
CW pipe Checking and monitoring of Painting for CW pipes according to A paint use roller is
procedure
not recommended
Painting Notes and comments:
*The humidity of the atmosphere should be a maximum of 80%.
P. 1 of 9
P. 2 of 9
6 . Radiographic test
Line no. Number of RT shoots Result Notes
C.W.PIPE diameter 1820 mm 8 6 ACCEPTED and 2 Repair
REJECTED
8. Ultrasonic test
Line no. Total inches Result Notes
No activity today
9. Welders Qualification :-
Position no. Total Result Position
No activity today
12. Staff
Name Position Hours Area and shift
Ahmed Basem ASNT L2 QAQC / team leader inspection Engineer 10 Day shift
Suhail Najm ASNT L2 welding inspector Engineer 10 Day shift
Ali waheeb ASNT L2 welding inspector Engineer 10 Day shift
Mustafa jumma ASNT L2 welding inspector Engineer 10 A vacation
Mazin Haleem CWI ASNT L2 Mechanical inspector Engineer 10 Mechanical inspect.
P. 3 of 9
P. 4 of 9
P. 5 of 9
P. 6 of 9
Painting inspection the first layer and Surface roughness for C.W.PIPE
diameter 2240mm
P. 7 of 9
P. 8 of 9
Mech. Inspection:- Bolt tack weld & covered plate inspection for HRSG#1
Engr.Ahmed Basim
QAQC /3rd party inspector
21/12/2019