You are on page 1of 2

TACLOBAN INSTITUTE OF ELECTRONICS

IRM Bldg. Sto. Niño Shrine Compound Real St., Tacloban City

EVIDENCE PLAN
TRAINEE’S NAME:
FACILITATORS NAME: LEONARDO M. GLOVA JR.
QUALIFICATION: ELECTRONIC PRODUCTS ASSEMBLY
AND SERVICING NCII
UNIT OF COMPETENCY: ASSEMBLE ELECTRONIC PRODUCTS
Ways in which evidence will be collected:

Oral Questioning

Demonstration

Written
The evidence must show that the trainee…
 Assembly workplace is prepared in
accordance with OH&S policies and
procedures*
 Established risk control measures for
work preparation are followed*
 Work instructions are obtained and
clarified based on job order or client
requirements*
 Responsible person is consulted for
effective and proper work coordination
 Required materials, tools and
equipment are prepared and checked in
accordance with established
procedures.*
 Parts and components needed to
complete the work are identified,
prepared and obtained according to
requirements.*

NOTE: * critical aspects


Prepared by;
LEONARDO M. GLOVA JR.
Trainer

Date Developed:
Electronic Products Assembly October 15, 2019
and Servicing NCII Developed By:
Leonardo M. Glova Jr.
TACLOBAN INSTITUTE OF ELECTRONICS
IRM Bldg. Sto. Niño Shrine Compound Real St., Tacloban City

Date Developed:
Electronic Products Assembly October 15, 2019
and Servicing NCII Developed By:
Leonardo M. Glova Jr.

You might also like